My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CAMBRIDGE
>
16470
>
2300 - Underground Storage Tank Program
>
PR0231532
>
INSTALL_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2021 10:24:33 AM
Creation date
11/8/2018 10:24:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0231532
PE
2351
FACILITY_ID
FA0000185
FACILITY_NAME
CITY GAS & LIQUOR
STREET_NUMBER
16470
STREET_NAME
CAMBRIDGE
STREET_TYPE
ST
City
LATHROP
Zip
95330
APN
19643032
CURRENT_STATUS
01
SITE_LOCATION
16470 CAMBRIDGE ST
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS3\C\CAMBRIDGE\16470\PR0231532\INSTALL 2018.PDF
QuestysFileName
INSTALL 2018
QuestysRecordDate
7/2/2018 8:57:03 PM
QuestysRecordID
3932889
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
% Pressure Sensor • <br /> This manual contains instructions to install a Veeder-Root Vapor Pressure Sensor in a dispenser's vapor return line <br /> ' or in a vapor vent stack. The Vapor Pressure Sensor measures containment tank pressure for leakage and <br /> overpressure conditions for vapor containment monitoring. <br /> This manual assumes all preliminary site preparation is completed, and that wiring from the console to the Pressure <br /> Sensor junction box is in place and meets the requirements set out in the Contractor's Site Preparation Guide <br /> and/or TLS RF Wireless 2 System (W2) Installation and Maintenance Guide. <br /> Contractor Certification Requirements <br /> ' Veeder-Root requires the following minimum training certifications for contractors who will install and setup the <br /> equipment discussed in this manual: <br /> Installer(Level 1)Certification:Contractors holding valid Installer Certification are approved to perform wiring <br /> and conduit routing; equipment mounting; probe, sensor and carbon canister vapor polisher installation; wireless <br /> equipment installation; tank and line preparation; and line leak detector installation. <br /> ' ATG Technician (Level 2/3 or 4)Certification: Contractors holding valid ATG Technician Certifications are <br /> approved to perform installation checkout, startup, programming and operations training, system tests, <br /> troubleshooting and servicing for all Veeder-Root Series Tank Monitoring Systems, including Line Leak Detection. <br /> In addition, Contractors with the following sub-certification designations are approved to perform installation <br /> checkout, startup, programming, system tests, troubleshooting, service techniques and operations training on the <br /> designated system. <br /> Wireless 2 <br /> • Tall Tank <br /> VR Vapor Products Certification: Contractors holding a certification with the following designations are <br /> approved to perform installation checkout, startup, programming,system tests, troubleshooting,service techniques <br /> ' and operations training on the designated system. <br /> a PMC— Pressure Management Control <br /> • Wireless—/PMC Wireless <br /> • A current Veeder-Root Technician Certification is a prerequisite for the VR Vapor Products course. <br /> Warranty Registrations may only be submitted by selected Distributors. <br /> ' Related Documents <br /> 331940-101 Descriptive Sys Document IECEx TLS-350 &TLS-350R d `.. <br /> 331940-105 Descriptive Sys Document IECEx- RF System JAN ) L�1$ <br /> 577013-964 TLS RF Wireless 2 System (W2) Installation and Maintenance Guide <br /> 577013-578 TLS Monitoring Systems Contractor's Site Preparation GuideE�,¢�d;'? L Hr=¢ LTH <br /> �..�6'T <br />
The URL can be used to link to this page
Your browser does not support the video tag.