Laserfiche WebLink
YEEOE T <br /> iIN STATNN N CS (I <br /> nn <br /> 03 U <br /> 1:z�r <br /> THE KEY TO CALIFORNIA COMPLIANCE <br /> Veeder-Roots California Air Resources Product Components <br /> .? Board(CRB)certified in-Station •Assist Vapor Flow 'Meter-Designed to � <br /> Diagnostics(ISD)system provides the <br /> most accurate vapor recovery detection withstand the harsh vapor recovery <br /> available in the industry. enlironment found in systems-with vapor - R <br /> vacuum pumps.It protides ISD with the - <br /> ;r Veeder-Roots ISD system continuously of vapor recovered during vehicle TLS-360 <br /> f monitors the vapor recovery equipment, rcfitelirig for continuous vapor collection <br /> rpt maintains test records,pro-,ides test monitoring <br /> reports,and generates warnings or •Balance Flog;- Meter -Designed for use <br /> a -trnis fo-dono--ing equipment failure. Vapor Flow Meter <br /> b P in pressure sensitive balance systems to �-w-- �- <br /> maintain accuracy and minimize false <br /> The Veeder-Foot ISD system can be alarms.It provides ISD with the volume of <br /> added to any TLS-350 console.This vapor recovered during vehicle refueling for <br /> ,kr,Y <br /> provides you with a cost effective cnntin?ous.-apor collection monitoring <br /> solution Kith the Veeder--Root clualii�° <br /> •Vapor Pressure Sensor -Provides LSD v;ith. <br /> ;r and support that you expect. P <br /> tank ullage pressure for rapor containment <br /> leakage and overpressure illonitoring <br /> The Most Installed ISD Solution <br /> Starting Septetllber 2010,ISD is •ISD Software Enhancement Module <br /> required on all gasoline dispensing (SEM)- mocks the ISD softc�are in the <br /> TLS-350 to provide continuous vapor <br /> facilities-pith an annual throughput.tyrFer rec(A-cn morttoring <br /> 600,000 tilons. ---Wftl °`s—st44S4nsor°' <br /> •NVMEM 2 Board -ProN des memor r a <br /> ! 4 <br /> °17eLher assist or balance vapor �.Sl�4rtStvil Sic cS=<1r4'�,�r fSD report storag2 <br /> recovery,over 901io of California JAN 1 t'..318 <br /> customers have selected`ceder-Root's <br /> ISD system, Neu stations select the Benefits of the Veeder-Root ISD System <br /> Veeder-Root.balance ISD solution due t Exceeds Compliance Requirements Co�t;k�c`�`tQ°'���iti" , .L 112ALTH <br /> h simpler nozzle alarm requirements. ` <br /> •CURB certified i0th all approved • ISD(DEft=e-;bi AdtlL�=t ly <br /> Veeder-Roots ISD is the only certified hang'-tag hardware,pixniding California TLS-350 console.levera&ng existing <br /> solution that supports all vapor customers v kh the most options TI-S-3150 equipment <br /> processor configuranons and all cerohed •Ma dentes site uptime using Single •Minin-tizes,initial equipment and <br /> vapor recovery riozzles. Dispenser Shutdown func,onality installation costs <br /> Flexible shutdotvn solutions allows •g-?e3,dble E�,D solulden certified vii£0 •iSD Sensors can shin—re.trung conduit <br /> customers to�l-toose betvaeen STP 'v`apor Processor confijT trat cgs i;4_til other,;eedet hit ctt intrinsically <br /> shutdov n.single Cicenser s futdcvn C:r •C�&rvC�:eC+to ifeet��ISD safe�5)se'n3_rs <br /> use both configurations. requ--r e c i by CP C)t • 1 p i; t r:, r t=bl lI <br /> u�' Wit, as d��e:. 5it-il'l_._2.a11c.,svYi. _n_'ril_7a.t e'h1`_l1�. <br /> Llcludina at least a 95%prolbibihtv, _`5, ensc <br /> ers <br /> zaiiure detection vchdle opa acing ax no m+yre <br /> ' t, r i •.;sr4e�iSpei Ski'vr STIP Shutdown% ryr;Sl'.^k''L tT:c'1,i faese e^�ai?ils <br /> • 3�--Vek`s tion avai.aCle <br /> • <br /> r- -r s ionic-Mg 1-de t des Ia CCS t. <br /> 'apor-recovery equipment ciunng Warrar_ty •lieeder l of%xrari:al2t`R,.r one year from <br /> pei:%dsMieliolt;.,2,Pensive nlarld EI tes g -tate of installation ter all n?Fvv ISD <br /> — a� components <br />