My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CAMBRIDGE
>
16470
>
2300 - Underground Storage Tank Program
>
PR0231532
>
INSTALL_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2021 10:24:33 AM
Creation date
11/8/2018 10:24:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0231532
PE
2351
FACILITY_ID
FA0000185
FACILITY_NAME
CITY GAS & LIQUOR
STREET_NUMBER
16470
STREET_NAME
CAMBRIDGE
STREET_TYPE
ST
City
LATHROP
Zip
95330
APN
19643032
CURRENT_STATUS
01
SITE_LOCATION
16470 CAMBRIDGE ST
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS3\C\CAMBRIDGE\16470\PR0231532\INSTALL 2018.PDF
QuestysFileName
INSTALL 2018
QuestysRecordDate
7/2/2018 8:57:03 PM
QuestysRecordID
3932889
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br />(3 <br />12 <br />5.4.11. Close valve to annular space. <br />5.4.12. Open valves to vent all compartments <br />(maintain 5 psig on annular space) <br />(see Figure 5-6). <br />Figure 5-6 <br />Valve Open Valve Open Valve Open <br />Fiqure 5-7 <br />5.4.13. Monitor the pressure for 30 minutes for any <br />loss in pressure from the initial reading which <br />may indicate a leak. <br />5.4.14. While under pressure, cover tank outer <br />surface, including fittings and manway(s), <br />with soap solution and inspect. <br />5.4.15. After completing air test, release pressure. <br />5.4.16. Remove all gauges, valves, and hose o <br />assemblies. N <br />5.4.17. Replace and tighten fitting plug(s). c <br />5.4.18. Replace the plastic vent plug in the open. <br />z <br />fittings. cr <br />5.5. Testing Double -Wall Tank(s) <br />With Liquid Filled Annular Space <br />(Hydrostatically Monitored) <br />• <br />Never pressurize a wet annular space. Doing so may <br />damage the tank or cause tank failure. <br />5.5.1. This tank has a hydrostatic monitoring <br />system that includes a green monitoring <br />fluid pre-installed between the tank walls. <br />5.5.2. In the unlikely event of a tank leak, this <br />monitoring fluid will leave a green trace on the <br />tank. <br />5.5.3. If monitoring fluid is found on the tank inner <br />or outer surface during any test, discontinue <br />the installation and immediately contact <br />Containment Solutions Field Services. <br />5.5.4. Comply with the requirements of Section 4. <br />5.5.5. With tank in upright position, remove the <br />4" vented plug from the reservoir fitting. <br />5.5.6. Add only enough monitoring fluid to cover <br />the rib inside the reservoir. Do not overfill <br />past the rib at this time (see Figure 5-7). Final <br />monitoring fluid levels will be set later in the <br />installation process. <br />10 <br />5.5.7. Reinstall vented reservoir plug to ensure <br />annular space is vented at all times. <br />5.5.8. Remove enough tank fitting plugs to see <br />inside the primary tank. <br />5.5.9. With a light, look inside for any monitoring <br />fluid. <br />5.5.10. Replace and tighten fitting plug(s). <br />5.5.11. Connect"Tank Test Manifold"to a primary tank <br />fitting. <br />5.5.12. Connect the pressure source to the "Tank Test <br />Manifold." <br />5.5.13. Pressurize primary tank to 5 psig maximum <br />V (3 psig for 12'tanks) (see Figure 5-8). <br />,Z Figure 5-8 <br />Air Supply <br />Primary Tank Fitting Vented Reservoir <br />Fluid <br />5 psig <br />(3 psig for 12'tanks) <br />Primary Tank <br />5.5.14. Close valve on "Tank Test Manifold" Disconnect <br />the air supply line. <br />5.5.15. Monitor the pressure for 30 minutes for any <br />loss in pressure from the initial reading which <br />may indicate a leak. <br />5.5.16. While under pressure, cover fittings and <br />manway(s) with soap solution and inspect. <br />5.5.17. After completing air test, release pressure. <br />5.5.18. Remove all gauges, valves, and hose <br />assemblies. <br />5.5.19. Replace and tighten fitting plug(s). <br />5.5.20. Replace the plastic vent plugs in the open <br />fittings. <br />5.6. Testing Double -Wall Compartment <br />Tank(s) With Double -Wall Bulkheads <br />(Hydrostatically Monitored) <br />• <br />Never pressurize a wet annular space. Doing so may <br />damage the primary tank or cause tank failure. <br />
The URL can be used to link to this page
Your browser does not support the video tag.