Laserfiche WebLink
MOUNT AT VIEWPORT <br /> PRESSURIZED LEAK DETECTOR EXTERNAL SIPHON CHECK VALVE 36" MULTIPORT MANHOLE HYDROSTATIC MONITORING GRA <br /> VEEDER-ROOT3 WAY SERVICE BALL VAVLEw/ LIQUID-TIGHT FILL BOX VEEDER-ROOT Architects <br /> I I - I I DRAIN HANDLE ACTIVATOR FOR <br /> STANDARD TURBINE PUMP 4" TOP SEAL ADAPTOR SUMP SHIELD FIVE GALLON MINIMUM FILL BUCKET. <br /> SLOPE PIPING ® HYDROSTATIC MONITORING q <br /> �1/8"/FT TO TANK DUAL WEATHERPROOF JUNCTION VEEDER-ROOT SLOPE CONCRETE DOWN 1-1/2" <br /> BOXDS w/ CORD GRIP WIRING SHROUD C BUCKETS WITH FROM MANHOLES, TYPICAL. Associates, encENTRIES IDOUBLE WALL INTERSTITIAL TERMINATION SHROUD CLAMPS a _ ■ <br /> ¢ DOUBLE WALL SUMP INTERSTITIAL <br /> 4" NIPPLE I t` TERMINATION. <br /> --- ��/ 2" VENT LINE w/ 3" - - - — — — — — - - - - - - - - - - — — — — — _ _ _ — - - - P.O. Box 9082 <br /> 2" FLEX CONNECTOR i� ��� ��/ SECONDARY PIPING _ _ = _ _� _ = _ _ � — � — — — — � — — — — - � — — — — � — — — — � — — ~ — — — <br /> Stockton, CA 95208-1082 <br /> LIQUID SENSING PROBE �/ EY PER NFPA 1 DOUBLE WALL SUMP PEA GRAVEL <br /> DOUBLE WALL SUMP OPENING THROUGH 4-300# COUPLING 4" SCHEDULE 40 GALVANIZED Phoney 12091609-6801 <br /> 1 SECONDARY WALL. RISER PRIMED AND WRAPPED. Email, GRA22875ogmall.com <br /> PENETRATION BOOT I 11 I 2 FIBERGLASS PRODUCT CONTAINMENT SUMP REDUCER j I I FILL TUB UM <br /> STANK & OPENINGS PIPING w/ 3" SECONDARY <br /> _ _ THREEWAY VALVE AND LIQUID _ <br /> 3" SECONDARY CONTAINMENT I I FLOAT SENSOR FOR TANK I _ PIPING. (SLOPE 1/8"/FT I I Architecture ♦ Consulting <br /> HYDROSTATIC MONITOR <br /> INTERSTICE BACK TO TANK) I I 1 <br /> 1 I 2" OR 3" FLEX CONNECTOR I I <br /> (OMIT ON DIESEL TANK) SMITH PENETRATION , FIBERGLASS CONTAINMENT III I cJE� AIR? <br /> 3" FIBERGLASS VAPOR RECOVERY I -- DOUBLE WALL SUMP <br /> LINE w/ 4" SECONDARY PIPING 2" FIBERGLASS _-----___ I -- TANK FITTING I I SUMP SENSOR VEEDER- �G � <br /> FIBERGLASS <br /> SLOPE TO LOWEST GRADE TANK // ------ I I " <br /> (OMIT ON DIESEL TANK). REFER /�/� �/ VAPOR PIPING w/ 4" COLLAR, TYP OF 6 ? RODRIGUEZ <br /> I I ROOT v GEORGE A <br /> TO PIPING PLAN FOR ACTUAL VENT PIPING w/ 3"--1VA <br /> CONFIGURATION AND SIZE. i�i� iii SECONDARY PIPING I SECONDARY PIPING - - - - -- - - - - - - --- <br /> - — — — -- — — --- -- ---- — ---- — — ---- --- — --- — — LEVEL__.. RNo. C2287 <br /> MAY <br /> U59 <br /> EXTRACTOR ASSEMBLY FOR � �� <br /> 2" PRODUCT LINE i i VAPOR RETURN (OMIT ON VENT kN LINE 9 <br /> DIESEL TANK) VAC FITTING IP R <br /> SUB PUMP i I TEST PORT /� <br /> �� TEST PORT <br /> F 11R VAC SENSOR HOUSING I� I LEVEL 'A" <br /> r� SEMBLY BRACKETED TO RISER VE TION 'NOT SHOWN FOR I I z <br /> NOTE <br /> * PIPES MUST EXIT PERPENDICULAR TO SUMP WALL SUMP SENSOR VEEDER-ROOT CLARIFY, SEE OTHER DETAILS I I <br /> * NEVER COVER UNUSED BUNGS w/ PIPE OR CONDUIT. I I These drawings are property of GRA Architects & Associates, Inc., and <br /> OPENING THROUGH SECONDARY I are not to ba reproduced, changed, copied, or reused without the <br /> I not <br /> written consent of GRA Architects & Associates, Inc. <br /> WALL: (DRAIN PORT) <br /> DOUBLE WALL TANK <br /> SUMP PLAN GASOLINE OR <br /> DIESEL TANK ,6 VACUUM SENSOR ASSEMBLY VAPOR & FILL DETAIL ,$ Consultant <br /> SCALE: N.T.S. A-2.2 80 3 211 SCALE: 3/4" = 1 '-0" A-2.2 210 SCALE: 3/4" = 1' 0" A 2.2 <br /> NOTES: <br /> 1. PERPENDICULAR PENETRATIONS OF CONTAINMENT SUMPS PREFERRED. <br /> 20" MAXIMUM ALLOWABLE PENETRATION ANGLE. <br /> 2. USE SUMP PENETRATION BOOTS AT ALL PENETRATIONS OF SUMP. <br /> 3. ALL JUNCTION BOXES ARE TO BE PLACED WITHIN 12" OF THE TOP <br /> OF SUMP. pt <br /> 3'-0" DIAMETER MANHOLE ANNULAR SPACE MONITOR Project For <br /> LIQUID SENSING PROBE <br /> REBAR AT SUB PUMP V-4 TRUCKVAPOR RECOVERY <br /> FOR WE7 TANK HOLE: 12" THICK SLAB � � Interstate A Enterprises <br /> WITH #4 TANK O 24" OC EACH WAY. SUB PUMP 1 6470 Cambridge Drive <br /> NOTE: _ Lathrop, CA 95330 <br /> CONCRETE SHALL EXTEND A MINIMUM EXTRACTOR ASSEBMLY FOR FILL CAP AND '31-0110 12"0 MANHOLE <br /> ODES 0" BEYOND ETANKS (SEE SITE PLAN I CAPVAPO(OMTTONNDIESEL TANK)AND 4" PIPE ADAPTER MANHOLEI Phone: (209)647-4273 <br /> FOR ACTUAL TANK SLAB SIZES.) VAP R AP ND ADAPTER <br /> 1'-2" 1 '12" SLOPE CONCRETE DOWN MULTIPORT WATER SHROUD HYDROSTATIC <br /> 2'-0" 1" FROM MANHOLES, TYPICAL. BUCKETS TANK <br /> MINIMUM I REBAR AT MANHOLES I FRP TOP HAT <br /> — - _ - - _ — = <br /> HYDROSTATIC CYLINDER /\\/\ <br /> W o FIBERGLASS PUMP 0 <br /> o \//\//\//\/ City Gas & Liquor <br /> o = CONTAINMENT SUMP <br /> \\ \\ \\ \ r _ _ _ o --� I r //\//\//\, New Gas Dispensing <br /> I I HYDROSTATIC <br /> 1 —PRODUCT LINE I I I CYLINDER \ \\ \\ � <br /> // // // Island & Canopy <br /> DISPENSER SKIN q /� <br /> o w VENT LINE SLOPE 1/8"/FT BACK TO TANK. 16470 Cambridge Drive <br /> 3" VAPOR PIPING I I SECONDARY \\ \\ \\ Lathrop, CA 95330 <br /> - I I - TEST PORT /\/\/ p <br /> MALE ADAPTER <br /> READED <br /> 3" COUPLING 1 . 0 I I \\� FLANGE w/ 1" NPT <br /> SHELL SECONDARY. I I \� \ \ VAPOR FLOW SENSOR THREADED INLET Sheet Contents <br /> TEST PORT I \ INLET SCREEN <br /> TEST Boor <br /> 1 �� 18" MIN. 1" SHORT NIPPLE TANK NOTES/DETAILS <br /> CABLE TO <br /> j LIQUID SENSING z. NOTE: <br /> SHALL NOT TRANSFER ANY j 11 JUNCTION BOX <br /> / PROBE WEIGHT OR LOAD TO THE TANK SUMP. I I FLAPPER VALVE; 1 STABILIZER <br /> I A.T.G. : BRING PEA :GRAVEL UP: TO THE TOPHAr. : I ISI (SET A7 95%) 1 PEA GRAVEL ASSEMBLY <br /> ENSURE THAT THE TANK PAD IS ISOLATED I I I OUTLET 0—RING <br /> FROM THE SUMP PER MANUFACTURER'S: I I BACKFILL <br /> I 1 WRITTEN INSTALLATION INSTRUCTIONS. I I I FLANGE w/ 1" NPT <br /> 1 L THREADED OUTLET <br /> II <br /> 1 U:NLE� DED: III- DRQP ;TUBE <br /> 1:2,000 : GA LON TANK z a <br /> � VAPOR SHEAR VALVE <br /> DRAWING STATUS DATE <br /> DEFLECTOR: x jIJ DEFLECTOR PLATE <br /> PLATE TYP.; TYPICAL i <br /> PLAN REVIEW N0. 1 09-25-17 <br /> 20 <br /> ISD VAPOR FLOW SENSOR <br /> SCALE: N.T.S. A-2.2 PLAN REVIEW NO. 2 10-23-17 <br /> MIN. BED TANK TO BE SET DEAD LEVEL PLAN REVIEW NO. 3 10-23-17 <br /> /\//\//\//\//\//\//\//\//\//\//\//\//\//\Y. <br /> //\//\//\//\//\//\//\//\//\//��/ HEALTH DPMT REVIEW 1 4 12-05-17 <br /> //\\//\\/\\ \ \\//\\//\\// /\\// GENERAL NOTES <br /> Ni \i��\ \i/\\ \\i\\i�\i��%% i��% \i�\i�\i�\i�\ \ `\�\� <br /> HEALTH DPMT REVIEW 2 A 03-21 -18 <br /> NOTE: i\�/\\//\//\//\\�/\ / \ \\��\/�� / 1. FULL SYSTEMS PRECISION TANK AND LINE TESTING TO BE <br /> \\/\\ ARRANGED TO BE ARRANGED BY CONTRACTOR (NOTIFY RESUBMITTED 06-12-18 <br /> ALL PIPING SHALL SLOPE A MINIMUM CONTRACTOR'S REPRESENTATIVE 2 WEEKS IN ADVANCE). <br /> 1 /8"/FT BACK TOWARDS TANK. 2. DISPENSER SUMP AND TURBINE SUMPS, FILL SUMPS ARE <br /> BUILDING PERMIT NO.: 201.3-0975 <br /> TO BE TESTED AS FOLLOWS: <br /> a. DISPENSER SUMPS OR UDC'S, TURBINE SUMPS AND FILL DRAWN BY: NEO KLAYBO <br /> SUMPS MUST BE TESTEED PER MANUFACTURERS <br /> INSTRUCTIONS. CHECKED BY: GRA <br /> 3. PIPING: AFTER PRESSURE TESTS ARE COMPLETED ON ALL <br /> TYPICAL <br /> THE LINES, PRESSURE MAY BE REDUCED TO A MINIMUM SCALE: AS NOTED <br /> 1 PICAL TANK ELEVATION AND SECTION 19 AS HA PSI AND MUST BE MAINTAINED UNTIL ALL CONCRETE/ <br /> ASPHALT SURFACES HAVE BEEN COMPLETED. PROJECT NO.: CGL-21706078 <br /> SCALE: 1/2" = 1'-0" A-2.2 4. ALL VENT, VAPOR AND PRODUCT PIPING TO BE A.O. <br /> SMITH (RED THREAD) INSTALL PER MANUFACTURER'S SPEC. SHEET: <br /> 5. TANKS SHALL BE INSTALLED PER THE MANUFACTURER'S A = 2 . 2 <br /> SPECIFICATIONS. <br /> 6' ALL PIPING, COUPLINGS, SEALANTS, OR RELATED <br /> PIPING SHALL BE COMPATIBLE WITH EACH OTHER AND THE <br /> PRODUCT THAT THEY SHALL CONVEY. <br />