My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2017 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
749
>
2300 - Underground Storage Tank Program
>
PR0231060
>
COMPLIANCE INFO_2017 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:48 PM
Creation date
11/8/2018 10:25:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2017 - 2018
RECORD_ID
PR0231060
PE
2361
FACILITY_ID
FA0003870
FACILITY_NAME
SRH FOOD & GAS
STREET_NUMBER
749
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734309
CURRENT_STATUS
01
SITE_LOCATION
749 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\D\DR MARTIN LUTHER KING JR\749\PR0231060\COMPLIANCE INFO 2017 -PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2017 -PRESENT
QuestysRecordDate
3/28/2018 9:47:28 PM
QuestysRecordID
3839032
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FILE CRE " <br /> UST SYSTEM RETROFIT OR REPAIR ' <br /> (Submit minimum of 3 sets of plans R applications as originals will be retained by E,R) y 8 2017 <br /> 1. Site map enclosed? YES[] NO[] <br /> Y M TF.I_HEALTH <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufa copy i each <br /> person installing or testing any component that is repaired or replaced. Ensure a co of thR'S'a ealth a ety <br /> Plan"is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements..If repairing a component, describe how this will be done. (If <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> Replace 407 sensor with 409 sensor on the 87 grade <br /> 4. List of equipment to be used (Attach manufacturers specification sheets showing third-party approval): <br /> (1)WR 749380-409 Interstitial Sensor For Double-wall Fiberglass Tanks <br /> EH230038(revised 12-11.15) 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.