My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
13975
>
2300 - Underground Storage Tank Program
>
PR0231622
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:27 AM
Creation date
11/8/2018 10:26:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231622
PE
2351
FACILITY_ID
FA0000055
FACILITY_NAME
TESORO (SHELL) 68150 (WRR 6133)
STREET_NUMBER
13975
Direction
E
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
APN
01908014
CURRENT_STATUS
01
SITE_LOCATION
13975 E HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\E\HWY 88\13975\PR0231622\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
6/2/2014 6:52:07 PM
QuestysRecordID
90861
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1[F[ED PROGRAM CONSOLIDATED FC <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- Pae 1 of 2 <br /> TYPE OF ACTION ❑ I.NEW PLAN X 2.CHANGE OF INFORMATION 49at <br /> PLAN TYPE X 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): 4942 <br /> i <br /> I. FACILITY INFORMATION <br /> FACILITY ID g(Agency U-Only/ <br /> BUSINESS NAME(Some ar Facility Nmne DDBA) 3 <br /> Shelu l esoro 68150 <br /> EusINESs SITE ADDRess 13975 E. Highway 88 101 CITY <br /> Lockeford to <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be rformtd a<the teen <br /> b ibe equipment manufacturers'instructions,or annual) ,whichever is more SQCCIfItd <br /> _. _.Y _ fieguent Such work must be perforated by qualified personnN, n cca ;w34.2634 wail <br /> MONITORING EQUIPMENT IS SERVICED x I.ANNUALLY ❑ 99.OTHER S 490.14 <br /> ( Petr'): . <br /> III. MONITORING LOCATIONS 490.36 <br /> ❑ 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN X 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED I21 CCR 1w32,26341 49PJ <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) ;hw k°ll <br /> X L CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 499,s <br /> WITH AUDIBLE AND VISUAL ALARMS.in ccR gm];2x341 <br /> SECONDARY CONTAINMENT IS: X a DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 49 <br /> PANEL MANUFACTURER: GllbaMo 490.7. MODEL g: EMC 490-3 <br /> LEAK SENSOR MANUFACTURER: Veed@f ROot 490A MODEL 0(S): 794390-420 440'10 <br /> U 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR S W ITANK(s),(n ccR;2613) <br /> PANEL MANUFACTURER: 490.12, MODEL M: 490.13, <br /> IN-TANK PROBE MANUFACTURER: 49x14 MODEL 0(S): 49415 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490'16 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490.17 <br /> PROGRAMMED TESTS: ❑ a 0.1 h. ❑ b.02 .h. ❑ c.OTHER(Sped 446'13 <br /> 4) <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(n ccit 1166.q X490.20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)In CCR 126451 TESTING PERIOD: ❑ a 36 HOURS ❑ b.60 HOURS o-2i 21. <br /> ❑ 5.Tw4 <br /> ANK INTEGRITY TESTING PER(n ccn 1349 <br /> .tl 0-22 <br /> TEST FREQUENCY: _ ❑ a ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 414 <br /> X 99.OTHER(specify): Tanks are monitored by Sacrificial Anodes. 490.26 <br /> 49 27 <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) rchec B <br /> X 1.CONTt awly) <br /> INUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 4942s <br /> gw"61 SECONDARY CONTAINMENT IS: X a DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM <br /> PANEL MANUFACTURER:Gilbarco 490.39. MODEL k: EMC 49x31 <br /> LEAK SENSOR MANUFACTURER: Veeder Root 490.32. MODEL 0(S): 794380-20B 490-13 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN, X a YES ❑ b.NO 49x14 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. X a YES ❑ b.NO 490.35. <br /> X L. MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF + 36 <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.In ccxlwwl <br /> 490'37 MODEL 0(S): LD2000(87,01889% 490.39 <br /> MELD MANUFACTURER(S): r FX1V S8 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(FLED)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.In CCRIM361 490.19 <br /> ELLD MANUFACTURER(S): 49040 MODEL 0(S): 490-11 <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 490.42. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a YES ❑ b.NO 490.41 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a YES ❑ b.NO 499M <br /> ❑ 4.PIPE INTEGRITY TESTING. -.__..-- 49x5 <br /> TEST FREQUENCY: ❑ a ANNUALLY Cl b.EVERY 3 YEARS ❑ C.OTHER(Specify) 49 .1 <br /> 6 '16 <br /> ,190 <br /> ❑ 5.VISUAL PIPE MONITORING. 49x43 <br /> FREQUENCY: ❑ a DAILY ❑ b.WEEKLY ❑ C.NUN.MONTHLY&EACH TIME SYSTEM OPERATED- 49449 <br /> •Albwd kr mon'eorilR Nunbv ed amerBaav __«6tl <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA,1n ttTe 1mvPISS adr W HSC nt. ]36(rR])I 49o-so <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM 49451 <br /> ❑ <br /> 99.OTHER(Specify) 490.52. <br /> 49x53 <br /> UPCF UST-D(128007)-!/8 vrww.aeldxa.prf <br />
The URL can be used to link to this page
Your browser does not support the video tag.