My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
13975
>
2300 - Underground Storage Tank Program
>
PR0231622
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:27 AM
Creation date
11/8/2018 10:26:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231622
PE
2351
FACILITY_ID
FA0000055
FACILITY_NAME
TESORO (SHELL) 68150 (WRR 6133)
STREET_NUMBER
13975
Direction
E
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
APN
01908014
CURRENT_STATUS
01
SITE_LOCATION
13975 E HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\E\HWY 88\13975\PR0231622\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
6/2/2014 6:52:07 PM
QuestysRecordID
90861
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(Page 1 of 2 <br /> [TYPE OF ACTION ❑ L NEW PLAN X 2.CHANGE OF INFORMATION 4951 <br /> PLAN TYPE X I.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. ,9a2 <br /> (Check one uem oNv) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(Sy <br /> 1. FACILITY INFORMATION <br /> FACILITY tp q(Agerry Ux Orllr9 <br /> BUSINESS NAME(Some as Facifiry Name or DBA) <br /> USA/Tesoro 68150 <br /> BUSINESS SITE ADDRESS 13975 E. Highway 88 °' ully <br /> Lockeford <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenancy and calibration of rwnitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> by the equ ent nmltufacnuers insmuaions,or annually,whichever is mwe cent.Such work must A tformed unwt noel _ _ _ <br /> ... __ _-�-_ _�'..q_ __P 1=?cCR§ss).zal°.xme.zap <br /> MONITORING EQUIPMENT IS SERVICED x I.ANNUALLY ❑ 99.OTHER(Specify): "951• <br /> 990.16 <br /> LII. MONITORING LOCATIONS <br /> r <br /> ITE PLOT PLANIMAP SUBMITTED WITH THIS PLAN X 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED ID CCa§2632.1 3+1 iV 1 <br /> V. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) 11d all <br /> UOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490.3 <br /> AUDIBLE AND VISUAL ALARMS.lel CCR§m32.261+) <br /> CONDARY CONTAINMENT IS: X a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d. TINDER VACUUMNEL MANUFACTURER: Gilbarco 190"7 MODEL q: EMC <br /> LEAK SENSOR MANUFACTURER Veeder Root 490.9 MODEL N(S): 794390.4$0 _°"a 10 <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SMLE WA TANK( ).(n CCR§2601 -6wl i <br /> PANEL MANUFACTURER: 490.1$- MODEL q: 490.13 <br /> IN-TANK PROBE MANUFACTURER: 440.1" MODEL q(S): 4951' <br /> LEAK TEST FREQUENCY: [Ia CONTINUOUS ❑ b.DAILYINIGHTLY ❑ c.WEEKLY 49516 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490.17 <br /> PROGRAMMED TESTS: _ ❑ a.0.1 gF:h_,_,_[I b.02,g.p.h. ❑ c.OTHER(Specify) +90.18. <br /> +90.19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION Itl cca 6w+6.H - - - 2222 - ave=2o- <br /> -- - <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING CM§164'1 TESTING PERIOD ❑ a.3fi HOURS ❑ b.60 HOURS +99.z1 <br /> ..---___ - ..-usaz23 <br /> 5.TANK INTEGRffY TESTING PER h cca§2611 Il _- -- - - w5n <br /> ____ _ TEST FREQUENCY,_ _ ❑_a._ANNUALLY ❑ b.BIENNIALLY L_L_Y ❑ a O"FHER(Specifv): 4""'34 <br /> .. +SQ25. - <br /> X 99.DTHER(specify): Tanks are monitored b Sacrificial Anodes. ;gam <br /> +90.27 <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br /> tow <br /> F <br /> ONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT W I IH AUDIBLE&VISUAL ALARMS. 49°22' <br /> a SECONDARY CONTAINMENT IS: X a DRY 490.29 <br /> 1 ❑ b.LIQUID FILLED ❑ C.PRESSURIZED ❑ d.UNDER VACUUM <br /> PANEL MANUFACTURER:Gllbarco 09''30 MODEL q: EMC 490.11 <br /> LEAK SENSOR MANUFACTURER: Veed@r ROOt °9°33 MODEL N(S): 794380-208 49an <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e..TURBINE)SHUTDOWN. X a.YES ❑ b.NO 490.1+ <br /> FAILUREANSCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. X a.YES ❑ b.NO +gals <br /> -_-..__MECHANICAL LME LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 49516 <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.(n CCRIM361 <br /> 49°17. MODELq(S): LD2000 (87), FX1V 490-3' <br /> MLLD MANUFACTURERS):Veperleas Red�eeles! <br /> - -LO- --- ----- <br /> 3.ELECTRONIC NE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.(23 CCRIM361 49o-19. <br /> ELLD MANUFACTURER(S): 490°0- MODEL N(S): 49541 <br /> PROGRAMMED M LME LEAK TEST: ❑ &MINIMUM MONTHLY 0.2 g,p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 49 2 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a YES ❑ b.NO 490.°1 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES [Ib.NO 190'4° <br /> 4.PIPE INTEGRITY TESTING. <br /> _ _. TEST FREQUENCY: ❑ aANNUALLY ❑ b.EVERY3 YEARS ❑ c.OTHER(Specify) 49 <br /> ___.. .. 1"7 <br /> S.VISUAL PIPE MONITORING. °was <br /> FREQUENCY: ❑ a DAILY ❑ b.WEEKLY ❑ C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED- 49°.49 <br /> __ ____-- _.. 6( __ -�AlbwaW nabibnnga(u vitl anvgmar esu«PoN�pnL 5(�I(I)__ <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.[M CCR§z61e(12636(03)] HSC J129190:'0w <br /> I + . <br /> El 7 NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 49as i <br /> ❑ 99.OTHER(Specify) <br /> tIPCF UST_D(122007)-ITE www,un§docs..org <br />
The URL can be used to link to this page
Your browser does not support the video tag.