My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
14000
>
2300 - Underground Storage Tank Program
>
PR0231631
>
COMPLIANCE INFO_2016-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:33 AM
Creation date
11/8/2018 10:26:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2018
RECORD_ID
PR0231631
PE
2361
FACILITY_ID
FA0000091
STREET_NUMBER
14000
Direction
E
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
CURRENT_STATUS
01
SITE_LOCATION
14000 E HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\E\HWY 88\14000\PR0231631\COMPLIANCE INFO 2016- PRESENT .PDF
QuestysFileName
COMPLIANCE INFO 2016- PRESENT
QuestysRecordDate
5/18/2017 8:47:48 PM
QuestysRecordID
3387540
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PcOEIVED <br /> SECONDARY LINE TESTING <br /> Test Method By: Manufacturer • Industry standard o Professional Engr o Other(see below) <br /> Test Method Uses: • Pressure vacuum o Hydrostatic o Other(see below) <br /> Measuring Equipment Used: Pressure Gauge (range 0 to 15 psig) <br /> -Description Line#1 Line#2 Line#3 <br /> Tank product Gasoline-87 Gasoline-91 Diesel <br /> Pipe manufacturer Ameron Ameron Ameron <br /> Pipe material FRP FRP FRP <br /> Primary pipe diameter (inches) 2 2 2 <br /> Secondary pipe diameter (inches) 3 3 3 <br /> Method of secondary pipe isolation Termination Boot Termination Boot Termination Boot <br /> Location of secondary pipe isolation STP/UDC STP/UDC STP/UDC <br /> Estimated length of piping run (feet) <br /> (include length of branch runs) <br /> Wait time for pressure to stabilize (hr:min) 0:10 0:10 0:10 <br /> Test start time 9:55 AM 10:05 AM 10:10 AM <br /> Initial pressure (psig) 5.0 5.0 5.0 <br /> Test end time 10:55 AM 11:05 AM 11:10 AM <br /> Final pressure(psig) 5.0 5.0 5.0 <br /> Test duration (hr:min) 1:00 1:00 1:00 <br /> Change in pressure (psig) 0.0 0.0 0.0 <br /> Pass/Fail threshold (psig) 0.5 0.5 0.5 <br /> TEST RESULT PASS PASS PASS <br /> Comments: <br /> 0 2017 Walton Engineering,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.