Laserfiche WebLink
PcOEIVED <br /> SECONDARY LINE TESTING <br /> Test Method By: Manufacturer • Industry standard o Professional Engr o Other(see below) <br /> Test Method Uses: • Pressure vacuum o Hydrostatic o Other(see below) <br /> Measuring Equipment Used: Pressure Gauge (range 0 to 15 psig) <br /> -Description Line#1 Line#2 Line#3 <br /> Tank product Gasoline-87 Gasoline-91 Diesel <br /> Pipe manufacturer Ameron Ameron Ameron <br /> Pipe material FRP FRP FRP <br /> Primary pipe diameter (inches) 2 2 2 <br /> Secondary pipe diameter (inches) 3 3 3 <br /> Method of secondary pipe isolation Termination Boot Termination Boot Termination Boot <br /> Location of secondary pipe isolation STP/UDC STP/UDC STP/UDC <br /> Estimated length of piping run (feet) <br /> (include length of branch runs) <br /> Wait time for pressure to stabilize (hr:min) 0:10 0:10 0:10 <br /> Test start time 9:55 AM 10:05 AM 10:10 AM <br /> Initial pressure (psig) 5.0 5.0 5.0 <br /> Test end time 10:55 AM 11:05 AM 11:10 AM <br /> Final pressure(psig) 5.0 5.0 5.0 <br /> Test duration (hr:min) 1:00 1:00 1:00 <br /> Change in pressure (psig) 0.0 0.0 0.0 <br /> Pass/Fail threshold (psig) 0.5 0.5 0.5 <br /> TEST RESULT PASS PASS PASS <br /> Comments: <br /> 0 2017 Walton Engineering,Inc. <br />