Laserfiche WebLink
PUBLIC HEALTH SERVICES <br />SAN JOAQ(JIN COUNTY <br />JOGI KHANNA N[D., �[P.H. <br />Healih Officer <br />P.O. Box 2009 • (1601 East Hazelton Avenue) • Stockton. California 95201 oq i Fa-a`'�P <br />(209) 468-3400 <br />MEMO <br />DATE: November 29, 1993 <br />TO: Leonard Crisp, Crisp Petroleum <br />433 N. Atwood <br />Visalia, CA 93279 <br />(209) 734-6381 <br />(209) 931-1828 in Stockton <br />FROM: L. T. Briggs, Senior R.E.H.S. <br />San Joaquin County PHS—EHD <br />P.O. Box 2009 <br />Stockton, CA 95201 <br />RE: 701 E. Charter Way, Stockton <br />Installation Plan <br />I. The Installation plan is incomplete. The Installation plan lacks the following <br />items: <br />A. Provide precise drawings showing proper installation of tank, piping, and <br />sump details. Enclosed drawings are inadequate. <br />B. Provide brochures and manufacturers instructions for tank, piping and <br />monitoring equipment. <br />C. Provide precise drawings of piping run to dispenser and show the <br />termination of piping under the dispenser. <br />D. Provide information about piping system ie. pressure or suction, dual <br />wall, any check valves? <br />E. Provide information about the overfill protection and installation. <br />Manual monitoring is no longer acceptable on new installations. <br />F. Provide information of responsible billing party for time spent on <br />installation in excess of 8 hours. <br />G. Provide a Monitoring and Response plan. To include all information on <br />enclosed handout. <br />H. Demonstrate financial responsibility (see handout). <br />I. Fill out new A and B forms for site and tank. <br />ENCLOSURES: <br />1. Monitoring and Response plan requirements. <br />2. Financial responsibility for petroleum underground storage tanks. <br />3. Regional Water Quality Control Board forms A, B, and C. <br />A Division of San Joaquin County Health fare Services 0 <br />