My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
701
>
2300 - Underground Storage Tank Program
>
PR0231059
>
INSTALL 1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2019 8:14:42 AM
Creation date
11/14/2018 4:28:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1998
RECORD_ID
PR0231059
PE
2361
FACILITY_ID
FA0002512
FACILITY_NAME
GSG GAS & MART
STREET_NUMBER
701
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734311
CURRENT_STATUS
01
SITE_LOCATION
701 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FPOM : CUPTESY' OIL CO PHONE NO. 209 6322160 Feb. 02 1998 09:35AM P2 <br /> 333 PbnXen Hood <br /> NodbOrook,lllinoi5 60062-2096 <br /> (847) ZT7_4WO <br /> FAXNo (847) Z72_8129 <br /> MCI Mad No. 254-33+13 <br /> UeL Underwriters laboratories lac_® TR1�rNn. �S(>7$�Z4di <br /> Rum 11, 1997 `• <br /> `1W)i�� <br /> Oo01k�t� <br /> ast 1� <br /> Amcron Fiberglass Pipe Systems <br /> Mr.Joie Folkers <br /> 1004 Atncmrt Rd <br /> FO Box 878 <br /> Burkbumcu TX 76354 <br /> Our ReferCncc: File No. MH9162 and MH15596 Project No.96NK26359 <br /> Subject., Coaxial Pipe and Fittings <br /> Dear Mr. Folkers: <br /> This is regarding the tests we have recently completed on your Dualoy®3000/LCX piping. <br /> The pipe has been detertuiucd to comply with all of the rvquiremonts of the UL971 Standard fvr Non- <br /> Metallic Piping for petroleum prvducts,alcohols and alcohol-gasoline mixtWW. <br /> The fittings have been determined to comply with all of the UL971 requirements for petroleum products, <br /> alcohols acid alcohol-gasoline mixtures except the following: <br /> Ile 0-rings used to seal the secondary contain sent portion of the fittings have aot been not been tcstcd <br /> for use with No.2 Fuel Oil. <br /> The pipe and fittings bavc met the UL971 requ4vmen13 for the containmont system to be rated to 75 psi. <br /> Should yvu have any questions or cormmcntb concerning the above iuformativn,please contact us. <br /> Very truly yo: Reviewed by: <br /> DOUGLAS G. SCHWARTZ(Ext.42947) WAYNE DOYERSBERGER(Ext.42086) <br /> Engineer Engineering Group Leader <br /> Engineering Services,416B Engineering Services,416E <br /> A not-Im-pror6 or;aru=on <br /> dedicated to public sdtety.and <br /> C"Mifted 10 gvality ceMte <br />
The URL can be used to link to this page
Your browser does not support the video tag.