My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
701
>
2300 - Underground Storage Tank Program
>
PR0231059
>
INSTALL 1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2019 8:14:42 AM
Creation date
11/14/2018 4:28:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1998
RECORD_ID
PR0231059
PE
2361
FACILITY_ID
FA0002512
FACILITY_NAME
GSG GAS & MART
STREET_NUMBER
701
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734311
CURRENT_STATUS
01
SITE_LOCATION
701 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 Piping system layout <br /> (cont'd.) <br /> Bell x male NPT adapter Dog leg(4 ft min) <br /> Single wall fiberglass <br /> _ Slope to tank vapor recovery line <br /> /e in/ft(min) <br /> ',,.�, Bell x male NPT adapter <br /> Never use metal swing joints. -A, ' <br /> Dog leg(4 ft min <br /> R Galvani elbow <br /> Fig.6-4.Use flexible connectors to Contained fiberglass \ <br /> connect fiberglass pipe to tanks,turbine product line Turbine pump <br /> outlets at tanks and to shear valves at Dogleg(4 ft min) <br /> dispensers.A 4-ft length of fiberglass <br /> pipe(dogleg)is allowable per Bell x male NPT adapte <br /> API Specification 1615 in lieu Galvanized elbow <br /> ofa flexible connector. <br /> Note:sump not shown <br /> Precise alignment and make-up <br /> The matched taper bell and spigot joint on the primary does not always result in a <br /> precise and predictable insertion depth.This variation results from: <br /> • Manufacturing tolerances in the bell <br /> • Differences in length of tapers prepared on the job site <br /> • Difference of insertion depth when dry fit and after adhesive has been applied. <br /> Flexible sump penetration fitting installation <br /> • Measure to the appropriate height for the center of the hole <br /> • Check the height from the ground making sure to allow for the desired slope for <br /> the piping in the station layout. <br /> • Mark the center <br /> • Measure and mark the center from side to side on the flat panel.For round sumps, <br /> see note below. <br /> • Using a 5-inch hole saw,cut a hole for the penetration fitting. <br /> Dualoy 3000/LCX Dualoy 3000/L <br /> termination tee <br /> Fig.6-5. Dualoy primary tee <br /> a)Typical sump penetration detail fora Termination 90'elbow <br /> system piped in parallel or at last sump of sleeve O O O <br /> a system piped in series. assembly <br /> with <br /> b)Typical sump penetration detail fora test port Termination <br /> system piped in series and utilizing test reducer <br /> termination tees.Allows pressure rating on secondary of 75 psi. P_'P <br /> c)Typical sump penetration detail forasystem piped in series and utilizingrubber termination test reducers. <br />
The URL can be used to link to this page
Your browser does not support the video tag.