My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
701
>
2300 - Underground Storage Tank Program
>
PR0231059
>
INSTALL 1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2019 8:14:42 AM
Creation date
11/14/2018 4:28:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1998
RECORD_ID
PR0231059
PE
2361
FACILITY_ID
FA0002512
FACILITY_NAME
GSG GAS & MART
STREET_NUMBER
701
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734311
CURRENT_STATUS
01
SITE_LOCATION
701 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Three complete sets of plans (include manufacturer's specification sheets for proposed equipment to be installed <br /> 2. Plans drawn to scale in non-erasable print. <br /> 3. / Plot plan to show location of tanks and all associated piping. <br /> 4. Striker plates or drop tube-mounted bottom protectors illustrated below all accessible openings. <br /> 5. L Tank cross-sectional diagram. <br /> 6. Detail of tank, associated piping, excavation and cover. <br /> 7. Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, Chapter 16 <br /> Article 3, Section 2631 (b) & 26351 <br /> 8. Verification of product compatibility with the tank(s), piping, monitoring <br /> device(s), epoxy or silicone glues, etc. <br /> 9. ✓ Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br /> 10. At the installation site, prior to installation, a tightness test shall be performed on both primary (1°) and <br /> / secondary (20) containment systems before covering. [Section 2635 (a) (3) & (4)] <br /> 11. J Tank integrity test required upon completion of installation with tank in operating condition. Test results to <br /> submitted directly to PHS-EHD from the testing company or owner of facility. [Health & Safety Code, Division 21 <br /> Chapter 6.7, Section 25291 (h)] <br /> 12. TANK COMPOSITION <br /> TANK # # # # # # <br /> CAPACITY1 OmO 6 4B D <br /> fAODTAN o <br /> MANUFACTURER N! LDlni <br /> COMPOSITION -519&CLAD CL <br /> MODEL 64,.%V) <br /> G5-13 <br /> PRODUCT Udo)ins- a 0L N`iJ <br /> CORROSION PROTECTION FRP f <br /> U.L. LISTED <br /> COMPATIBILITY WITH 100% /�S <br /> METHANOL <br /> 13. TANK(s) TO BE INSTALLED <br /> A. Steel-ctad with fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br /> coatings or coverings. <br /> V1 <br /> / (1) Tested at the installation site using an electric resistance holiday detector. <br /> 1/ (2) Vacuum applied to interstitial space. <br /> 6. Fiberglass <br /> (1) Installation instructions require an air test and soap bubble test prior to instatlatio <br /> (2) Vacuum applied to interstitial space. <br /> (3) Hydrostatic annular (primary tank pressure test). <br /> C. Non-c[ad steel tank [Section 2635 (a) (2) (A)T <br /> _ (1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washe <br /> etc.). <br /> _ (2) Field installed cathodic protection systems designed and certified as adequate by a <br /> corrosion specialist. <br /> (3) Impressed current systems to be inspected no less than every 60 days. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.