Laserfiche WebLink
1, 1W A AML <br />IRW UNDERGROUND STORAGE TANK <br />RESPONSE PLAN - PAGE 1 (One form per aeility) <br />TYPE OF ACTION ❑ 1. NEW PLAN El 2. CHANGE OF INFORMATION Ulu 1Z01 <br />I. FACILITY INFORMATION ENVIKOKIENT HEALTH <br />FACILITY ID # (Agency Use Only) <br />BU SS NAME (Same as FACILITY NAME) Roz. <br />' - T <br />BUSINESS SITE ADDRESS R03. <br />CITY R04. <br />ESn <br />l oG CT ,r/ <br />II. SPILL CONTROL AND CLEANUP METHODS <br />"This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br />Business Plan. <br />➢ If safe to do so, facility personnel will take immediate measures to control or stop any release (e.g., activate pump shut-off, etc.) and, if necessary, safely remove <br />remaining hazardous material from the UST system. <br />➢ Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br />contain the hazardous material, but not greater than 30 calendar days, or sooner if required by the local agency. Recovered hazardous materials, unless still suitable <br />for their intended use, will be managed as hazardous waste. <br />Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br />effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR §66262.11 finds that <br />it is non -hazardous. Used absorbent material, reusable or waste, will be stored in a properly labeled and sealed container. Waste material shall be disposed <br />appropriately. <br />➢ Facility personnel will determine whether any water removed from secondary containment systems, or from clean-up activity, has been in contact with any <br />hazardous material. If the water is contaminated, it will be managed as hazardous waste unless a waste determination in accordance with 22 CCR §66262.11 finds <br />that it is non -hazardous. If the water has a petroleum sheen (i.e., rainbow colors), it is contaminated. A thick floating petroleum layer may not necessarily display <br />rainbow colors. Water (hazardous or non -hazardous) from sumps, spill containers, etc. will not be disposed to storm water systems. <br />➢ We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br />1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br />2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br />3. Hazardous material, other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br />released product/waste, and the added material or resulting material from such a combination is not compatible with secondary containment. <br />III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br />PERIODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br />equipment is inspected at least monthly, and after each use, supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br />EQUIPMENT NOT PERMANENTLY ON-SITE, BUT AVAILABLE FOR USE IF NEEDED: (Complete only ifapplicable) <br />EQUIPMENT <br />LOCATION <br />AVAILARHATY <br />C�->jllL, n RIO. <br />�J� � <br />Rzo. <br />Rao. <br />R31. <br />R21. <br />R31. <br />R12. <br />R22 <br />R32. <br />R13. <br />R23. <br />R33. <br />R14. <br />R24. <br />R34. <br />R15. <br />R25. <br />R35. <br />IV. RESPONSIBLE PERSONS <br />THE FOLLOWING PERSON(S) IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br />NAME Roo. <br />TITLE R50. <br />LQ <br />NAMER41. <br />TITLE R51. <br />44_1 <br />(d Z22 <br />NAME R42 <br />TITLE R52. <br />NAME R43.J_j;ffjE <br />R53. <br />V. MONITORING INDICATORS <br />IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE, STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br />❑ Additional system testing or data collection 19 Inspection by qualified persons ❑ Recalibration of equipment <br />Other: <br />R60. <br />UST Response Plan (3/2008) -1/3 <br />