My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
701
>
2300 - Underground Storage Tank Program
>
PR0231059
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2023 2:50:23 PM
Creation date
11/14/2018 4:50:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231059
PE
2361
FACILITY_ID
FA0002512
FACILITY_NAME
GSG GAS & MART
STREET_NUMBER
701
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734311
CURRENT_STATUS
01
SITE_LOCATION
701 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FERED PROGRAM CONSOLIDATED Fed <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN - (Pagate 1 of 2 <br />TYPE OF ACTION ❑ 1. NEW PLAN ❑ 2. CHANGE OF INFORMATION 490-1 <br />PLAN TYPE ❑ 1. MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2 <br />(Check one item only) ❑ 2. THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br />I. FACILITY INFORMATION <br />FACILITY ID # (Agency Use Only) <br />I d <br />1, <br />BUSINESS NAME (Same as Facility Name or DBA) 3. <br />Super Center Mart <br />BUSINESS SITE ADDRESS 103. <br />CITY 104. <br />701 E. Charter Way <br />Stockton 95206 <br />II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br />Testing, preventive maintenance, and calibration of monitoring equipment (e.g., sensors, probes, line leak detectors, etc.) must be performed at the frequency specified <br />by the equipment manufacturers' instructions, or annually, whichever is more frequent. Such work must be performed by qualified personnel. 1 3 CCR §2632, 2634, 2638, 2641) <br />- <br />MONITORING EQUIPMENT IS SERVICED ® 1. ANNUALLY [199.OTHER(Specify)_ 490-3a. <br />Q � 490-3b. <br />III. MONITORING LOCATIONS <br />❑ 1. NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ® 2. SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 CCR §2632, 2634) 4904, <br />IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) ("eck all <br />that <br />1. CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT VAULT(S) 490-5. <br />WITH AUDIBLE AND VISUAL ALARMS. [23 CCR §2632,2634) <br />SECONDARY CONTAINMENT IS: ❑ a. DRY ® b. LIQUID FILLED ❑ c. PRESSURIZED ❑ d. UNDER VACUUM 49" - <br />PANEL MANUFACTURER: Veeder Root 490.7. MODEL #: TLS350& 490.8. <br />LEAK SENSOR MANUFACTURER: Veeder Root 490.9. MODEL #(s): 794380-304 490-10. <br />2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE WALL TANK(S). [23 ccR §2643) 490-11. <br />PANEL MANUFACTURER: 490-12. MODEL #: 490-13. <br />IN -TANK PROBE MANUFACTURER: 49414. MODEL #(S): 490-15. <br />LEAK TEST FREQUENCY: ® a CONTINUOUS ❑ b. DAILY/NIGHTLY ❑ c. WEEKLY 490-16. <br />❑ d. MONTHLY ❑ e. OTHER (Specify): 490-17. <br />PROGRAMMED TESTS: ❑ a. 0.1 h. ® b. 0.2 h. ❑ c. OTHER (Specify): 49x18' <br />g•P• g•P• (P fY)� a90-19. <br />❑ 3. MONTHLY STATISTICAL INVENTORY RECONCILIATION [23 ccR §2646.11 490-20. <br />..... <br />❑ 4. WEEKLY MANUAL TANK GAUGING (MTG) [23 CCR §26451 TESTING PERIOD: [Ia. 36 HOURS [I b. 60 HOURS 49202. <br />® 5. TANK INTEGRITY TESTING PER [23 CCR §2643.11 490-23' <br />TEST FRE UENCY: ® a. ANNUALLY ❑ b. BIENNIALLY ❑ c. OTHERS ci 490-24. <br />Q ( � fy): 490-2s. <br />99. OTHER (Specify): --- - --- - _ 490-26. <br />❑ 490.27. <br />V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHODS) heck all <br />that apply) <br />® 1. CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S) AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE & VISUAL ALARMS. 490-28. <br />[23 CC SECONDARY CONTAINMENT IS: ❑ a. DRY ® b. LIQUID FILLED ❑ c. PRESSURIZED ❑ d. UNDER VACUUM 490-29. <br />PANEL MANUFACTURER: Veeder Root 490-30. MODEL #: TLS350 490-31. <br />LEAK SENSOR MANUFACTURER: Veeder Root 490.32. MODEL #(S): 794380-208 490'33' <br />PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN. ® a YES ❑ b. NO 490-34. <br />FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a. YES ❑ b. NO 490-31. <br />2. MECHANICAL LINE LEAK DETECTOR (M LLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF 490.36. <br />PRODUCT FLOW WHEN A LEAK IS DETECTED. [23 CCR§26361 <br />MLLD MANUFACTURER(S): Red Jacket 490-37. MODEL #(S): 490-38. <br />❑ 3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS. [23 CCR§2636] 490-39. <br />490-40. MODEL #(S): 490-41. <br />ELLD MANUFACTURER(S): 1 <br />PROGRAMMED IN LINE LEAK TEST: ❑ a. MINIMUM MONTHLY 0.2 g.p.h. ❑ b. MINIMUM ANNUAL 0.1 g.p.h. 49042. <br />ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ®a. YES ❑ b. NO 49043. <br />ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a. YES ❑ b. NO 49044 <br />® 4. PIPE INTEGRITY TESTING. 490-0-5. <br />0-46 <br />TEST FREQUENCY: ® a. ANNUALLY ❑ b. EVERY 3 YEARS [I c. OTHER (Specify) 490497 <br />❑ 5. VISUAL PIPE MONITORING. 49048. <br />FREQUENCY: ❑ a. DAILY ❑ b. WEEKLY ❑ c. MIN. MONTHLY & EACH TIME SYSTEM OPERATED* 490-49. <br />* Allowed for monitoring of unburied emergency generator fuel piping only per HSC §25281.5(bx3) <br />❑ 6. SUCTION PIPING MEETS EXEMPTION CRITERIA. [23 CCR §2636(ax3)] 490-50. <br />❑ 7. NO REGULATED PIPING PER HEALTH AND SAFETY CODE, DMSION 20, CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490-51. <br />❑ 99. OTHER (Specify) 49-0-53 s2. <br />53 . <br />UPCF UST -D (122007) -1/3 www.unidoes.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.