Laserfiche WebLink
IFIED PROGRAM CONSOLIDATEDM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN - (Page I of 2) JUN 2 7 2013 <br /> TYPE OF ACTION ❑ 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION X40-i <br /> PLAN TYPE ❑ 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. ENVIReNMENTAL°-2 <br /> (Check one item only) El2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): HEALTH DEPARTMENT <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) <br /> BUSINESS NAME(Same as Facility Name or DBA) <br /> 'rR A <br /> BUSINESS SITE ADDRESS 103. CIT104 <br /> `7o L• VPz - '1-1AR-rw L)r14 rz R K" V R MW I YKa 6 k I-VAI - <br /> H. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> by the equipment manufacturers'instructions or annually,whichever is more frequent.Such work must be performed by qualified personnel. 23 CCR 263 2634,2638 2641 <br /> EQUIPMENT IS SERVICED � 1.ANNUALLY ❑ 99.OTHER490-3a. <br /> MONITORING E <br /> Q (Specify): 490-3b. <br /> III. MONITORING LOCATIONS <br /> ❑ 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN R 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 CCR§2632,2634] 490-4, <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (deck all <br /> ❑ 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5. <br /> WITH AUDIBLE AND VISUAL ALARMS.[23 CCR§2632,26341 <br /> SECONDARY CONTAINMENT IS: "_a.DRY T❑ b.LIQUID FILLED ❑ c.PRESSURIZED El d.UNDER VACUUM 490-6. <br /> PANEL MANUFACTURER: ��F_T)5R I�.DOT 490-7. MODEL#: TLS v 490-8. <br /> LEAK SENSOR MANUFACTURER: 490-9. MODEL#(S : " 7.ago-lo <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).[23 CCR§26431 r 490-11 <br /> PANEL MANUFACTURER: 490-12. MODEL#: 49°-13. <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): 490-15. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17. <br /> PROGRAMMED TESTS: ❑ a.0.1 h. Rr b.0.2 h. ❑ c.OTHERS ci 490-18. <br /> _ ••--•----......-............................................-._. _.__..-.g.p.h. g.p.h. fy)._ 490-19. <br /> .. .__..............___ <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION[23 CCR§2646.11 <br /> _ -�................ ___..__ �-__.............. --_ <br /> .......... .__......._.. _.. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)[23 CCR§26451 TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS49 <br /> _ 0-22. <br /> 5.TANK INTEGRITY TESTING PER[23 CCR§2643.11 490-23. <br /> TEST FREQUENCY: X a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER490-24. <br /> (Specify): 490-2s. <br /> ❑ 99.OTHER(Specify): 490-26. <br /> 490-27. <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) Check a" <br /> 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490-28. <br /> [23§16363 SECONDARY CONTAINMENT IS: X a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED 1 ❑ d.UNDER VACUUM 490-29. <br /> V <br /> PANEL MANUFACTURER: E E D F R R D D'T 490-30. MODEL#: T L S' ?s-0 490-31. <br /> LEAK SENSOR MANUFACTURER: 490-32. MODEL#(S): " 2_09 490-33. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ❑ a.YES U b.NO 49434. <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN._ ❑ a.YES ❑ b.NO 490-35. <br /> K <br /> _- MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 490-36. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.[23 CCR§2636] <br /> MLLD MANUFACTURER(S): R�� �G Ked" 490-37. MODEL#(S): F x 1,/ 490-38. <br /> . <br /> _.-....._.......---•--.._.............. <br /> 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.[23 CCR§26361 490-39. <br /> ELLD MANUFACTURER(S): 490-40. MODEL#(S): 490.41. <br /> PROGRAMMED IN LINE LEAK TEST: a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 491-42. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. a.YES ❑ b.NO 49143, <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. a.YES ❑ b.NO 491-44- <br /> .... <br /> _ .._ ..._.__...._................._-_............... _ _ _ ..._._.._.._ _ .. _.___._........_.. --.....-_-----_...-......._.....__._..........._.._._.....-..-. <br /> PIPE INTEGRITY TESTING. 490-45. <br /> TEST FREQUENCY: a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 490 490-46. <br /> 6 <br /> .VISUAL PIPE MONITORING. 490-48. <br /> FREQUENCY: a.DAILY ❑ b.WEEKLY ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 490-49. <br /> .............. _•Allowed for monitoring of unburied emerge q,,&eneratorkq.pjpj9A ons HSC-X25281 SM3�•-_••- <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.[23 CCR§2636(ax3)1 ago so. <br /> __ __ __._........-..___..... __.._ .._.......---....__............................... <br /> -- -- <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490-51. <br /> -- _99.OTHER(Specify) 490-52. <br /> 490-53. <br />