Laserfiche WebLink
iv onitcring System Certification <br />Site Address: 71,1 ri 1� �2 -� Ely ? a Date orTesting/Servicing: <br />Ij <br />F. In -Tank Gauging / SIR Equipment: C�1'Check this box if tank gau(ling is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gaufling equipment is used to perform leaf: detection monitoring. <br />Comnlete the following checklist: <br />❑ <br />Yes <br />❑ <br />No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ <br />Yes <br />❑ <br />No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ <br />Yes <br />❑ <br />No* <br />Was accuracy of system product level readings tested? <br />❑ <br />Yes <br />❑ <br />No* <br />Was accuracy of system water level readings tested? <br />❑ <br />Yes <br />❑ <br />No* <br />Were all probes reinstalled properly? <br />❑ <br />Yes <br />❑ <br />No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />Comnlete the following checklist: <br />Yes <br />❑ No* <br />For equipment start-up or annual equipment ceer fication, was a leak simulated to verify LLD performance? <br />❑ N/A <br />(Check all that appl)) Simulated leak rate: El3 g.p.h.; ❑ 0.1 g.p.h ; ❑ 0.2 g.p.h. <br />❑ Ye <br />No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Yes <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />❑ Yes <br />ElNo* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ N/A <br />❑ Yes <br />❑l <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />�Na* <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />U--N'/A <br />or disconnected? <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br />Ur/N/A <br />malfunctions or fails a test? <br />❑ Yes <br />❑NN <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />Cd" N/A <br />ET�Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, descrioe now and when tnese oenciencies were or win oe correcteu. <br />H. Comments: C <br />Page 3 of 3 05/00 <br />