My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1986 - 2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
701
>
2300 - Underground Storage Tank Program
>
PR0231059
>
COMPLIANCE INFO 1986 - 2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2019 2:21:04 PM
Creation date
11/15/2018 4:19:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986 - 2005
RECORD_ID
PR0231059
PE
2361
FACILITY_ID
FA0002512
FACILITY_NAME
GSG GAS & MART
STREET_NUMBER
701
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734311
CURRENT_STATUS
01
SITE_LOCATION
701 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4REDJACKET <br />STATEMENT OF THIRD PARTY CERTIFICATION <br />The following listed Red Jacket equipment has been Third Party tested and certified per the <br />appropriate EPA test protocols. <br />To assist owners and operators with the maintenance of records in accordance with EPA <br />regulation 280.45, Red Jacket has copies of the below listed Third Party Evaluations <br />available. <br />To obtain copies of a particular report, just call 1-800-952-8348 and request the Evaluation No. <br />associated with the evaluation you require. <br />Red Jacw Equipment <br />Evaluation No, <br />- DescAptic'n of Evaluatlon <br />FX1. FX2, FX1 V and <br />E 13 <br />Ev aluanon of the Red Jackal I -X 1 FX2, FX IV and FX2V <br />,FX2V <br />Line Lea[ Detectors for Hrx,rly Monitoring on Rigid Pipelines <br />I <br />E 14 Addendum <br />Evaluation of the Red Jacket FX I,FX2, FX1 V and FX2V <br />i <br />Line Leak Detectors (installed in the Big Flo) for Hourly Testing on Bulk Lines Containing Unleaded Gasoline <br />E 16' <br />Evaluation of the Red Jacket FX1, FX2, FX IV and FX2V <br />Lire Leak Detectors for Hourly Monitoring on Flexible Pipelines <br />FX 10. FX20. FXI DV and <br />E 14 <br />Evakiaaol of the Red Jacket FX1D. FX20, FX1DV and FX20V Lire Leak Detectors (Installed in the Big Flo) for Hourly <br />FX20V <br />Testing on Bulk Lines Containing Diesel Fuel <br />XLP <br />E 2 <br />XLP Line Leek Detector for Hourly Monitoring <br />E 12 <br />XLPL., e Leak Defector lot Hourly Monitoring <br />on Flexible Pipelines <br />Big Flo / Diaphragm <br />E 17 <br />XLD Une Leak Detector lot Hourly Monitoring <br />Lite Leak Detector <br />OLDS Sensor <br />E B <br />Red Jackal Optical Ligufd Discrimination Sensor <br />PPM 4000 <br />E 3 <br />PPM 4000 and ALM 9000 <br />Automatic Line Leak Detectors for Hourly Monitoring <br />E 4 <br />PPM 4000 and ALM 9000 <br />Automatic Une Leak Detectors for Line Tghlness Testing <br />E 5 <br />PPM 4000 and FILM 9000 <br />Automatic Une Leak Detectors for Monthly Monitoring <br />E 15 <br />Automatic Une Leak Defector for Hourly, Monthly and <br />Line Tightness Testing <br />FLM 5000/5001 <br />E 6 <br />FLM 5000/5001 and 9000 <br />Automatic Tank Gauging Systems for Monthly Monitoring <br />E 7 <br />RLM 5000/5001 and 9000 <br />Automatic Tank Gauging Systems <br />for Annual Tank Tightness Testing <br />RLM 9000 <br />E 3P <br />P114000 and RLM 9000 <br />Automatic Line Leak Detectors for Hourly Monitoring <br />E 4 <br />PPM 4000 and RLM 9000 <br />Automatic Line Leak Detectors lot Line Tightness Testing <br />E 5PPM <br />4000 and RLM 9000 <br />Automatic Line Leak Daloclors for Monthly Monitoring <br />E i 5 <br />Automatic Line Leak Deleclot lot hourly, Monthly and <br />Une Tightness Tasting <br />E 6 <br />RLM 5000/5001 and 9000 <br />Automatic Tank Gauging Systems for Monthly Monitoring <br />- <br />E. <br />RLhL-J xvS0n1 —9000. <br />Automatic Tank Gauging Systems <br />for Annual Tank Tightness Testing <br />I ST 1400118001140111801 <br />E 9 <br />ST Series Automatic Product Level <br />Monitoring Systems <br />E t0 <br />ST Series Tank Monitoring Systems (Annual) <br />E 11 <br />ST Series Tank Monitoring Systems <br />lot Conunuous Leak Detection <br />ST 1401 Lift 801 L <br />E 9 <br />ST Series Automatic Product Level -" <br />Monitoring Systems <br />E 10 <br />ST Series Tank Monitonng Systems (Annual) <br />E 11 <br />ST Series Tank Monitoring Systems <br />lot Continuous Leak Defection <br />E 15 <br />Automatic Line Leak Detector for Hourly, Monthly and <br />Line Tightness Testing <br />E 16 <br />Evaluation of the Red Jacket FX1/FX2; FXtV/FX2V Line Leak Detectors for Hourly Monitoring on Flexible Pipelines. <br />E 17 <br />Evaluation of the Red Jacket Big-Flo/Disphragm Une Leak Detector or Hourly Monitoring in Gasoline. <br />E !B <br />Evaluation of the Red Jacket Electronics Leak Detection Sensors. <br />E 19 <br />Evaluation of the Red Jackal PPM4000, RLM 000, RLM10,000, ST1401L d ST1801L on EnviodNx Flexible Pipelines lot <br />.2 a 1 Tests. <br />E 2C <br />Large Tank Certification of Red Jacket ST Series. FMS. ATG A LLM Series. Shut Down Test Only <br />f, REDJACKETt <br />by H VEEDER-ROOT <br />125 Powder Forest Drive • Simsbury, CT 06070 042-099-1 Rev. C <br />Tel: (860) 651-2700 • Fax: (860) 651-2719 <br />
The URL can be used to link to this page
Your browser does not support the video tag.