Laserfiche WebLink
WRITTEN MONITORING AND RESPONSE PLAN <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAMThe program are <br /> This monitoring program must be kept at the <br /> holtocation at all times.must notify Environmental Hetalth Department ion on this t(209)468-3420 <br /> conditions of the operating permit.Thep arocedures,unless required to obtain approval or a permit before making <br /> within 30 days of any changes to the monitor <br /> the change.Required by CCR 2632(d)and 2641 (h). <br /> �c y DATES `J <br /> FACILITY NAME <br /> FACILITY ADDRESS <br /> !�:. C� <br /> 1.Name(s)and Title(s) of the people responsible for performing the monitoring and/or maintenance <br /> W <br /> 2.Describe the frequency of performing the monitoring for: L 0 7r*l l <br /> ER7L)/ PIPING � <br /> TANKS_/ <br /> 3.Describe the location(s)of where the monitoring will be performed. ie: location of sensors <br /> 4.Describe the following equipment for each underground storage <br /> Name and Model of Monitoring Panel <br /> 11,16, . -r<— <br /> Name and Model of Line Leak Detectors , <br /> Name and Model of Annular Sensors <br /> Name and Model of Piping Sensors <br /> i <br /> Name and Model of Dispenser Sensors <br /> Type of overfill prevention <br /> NoD <br /> 5.Do the Turbm <br /> e Sensors and Dispenser Pan Sensors shut down the turbine? Yes% No❑ <br /> Does the turbine shut down if a sensor is disconnected? Yes No❑ <br /> Does the turbine shut down iPhe monitoring panel loses power? <br /> 6.How will the alarm history and subsequent maintenance be recorded? ECS <br /> /OA <br /> f <br /> ment must be performed at least once every 12 months. <br /> 7.Maintenance of the monitoring equip equipment What month will <br /> Describe the preventive maintenance schedule and recording for the monitoring � <br /> annual monitoring certification be erforc�ned in? c1 U <br /> _ <br /> Note:For new installations the secondary containment moist be <br /> ust tested 6 months after003llation.All secondary containment systems <br /> mbe tested once every 36 months with initial testing performed before January <br /> for the operation of UST system,including piping,and the monitoring <br /> 8.Describe the training necessary P d ' —C1p <br /> equipment. d�r� <br /> I:\Unit III\USTmonitoringplan.doc <br /> 5/30/2002 <br />