Laserfiche WebLink
Site: _ (o ^ <br />DYNAMIC BACK PRESSURE TEST DATA (BLOCKAGE) Date. n4 / 03/ <br />NOZZLE 20 CFH 60 CFH 100 CFH PAS /FAIL NOZZLE 20 CFH 60 CFH 100 CFH PASS/FAIL <br />(.15" Water) (.45" Water) (.95" Water) <br />(.t5" Water) (.45" Water) (.95" Water) <br />Blockage Tester Integrity• I <br />U <br />7-7 <br />0 It W.C. @ 5 minutes <br />LIQUID REMOVAL CHECK <br />v <br />00, <br />D /—mt <br />D / ml D/ _ml <br />D/ ml D/ ml D/ ml <br />D/ ml D/ ml D /—ml <br />D / <br />ml D / ml D/ —ml <br />D/ ml D/ ml D/—ml <br />D/—ml <br />ell <br />— <br />D/ ml D/ ml <br />D/ ml — <br />D/ ml D/ ml <br />D/ <br />ml ml <br />�c� <br />ll <br />/ <br />07 <br />7 G <br />JWhi Hose <br />Hoses U� �) v,'; <br />Dro <br />Parts: None P <br />Nozzles�i-��� �/ Breakaw s <br />PV Valves <br />Others: <br />Blockage Tester Integrity• I <br />**See Long <br />Form Test Report for. Wet Failure Testing <br />0 It W.C. @ 5 minutes <br />LIQUID REMOVAL CHECK <br />D / ml <br />D/ m► D/—ml _ <br />D /—mt <br />D / ml D/ _ml <br />D/ ml D/ ml D/ ml <br />D/ ml D/ ml D /—ml <br />D / <br />ml D / ml D/ —ml <br />D/ ml D/ ml D/—ml <br />D/—ml <br />D/ ml <br />D/ D/_ml <br />— <br />D/ ml D/ ml <br />D/ ml — <br />D/ ml D/ ml <br />D/ <br />ml ml <br />_ Job Complete Repairs Done to Pass Test: <br />Not Complete Repairs Still Needed: <br />TubeOrings <br />Fill Adaptor Gaskets <br />JWhi Hose <br />Hoses U� �) v,'; <br />Dro <br />Parts: None P <br />Nozzles�i-��� �/ Breakaw s <br />PV Valves <br />Others: <br />