My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006 - 2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
701
>
2300 - Underground Storage Tank Program
>
PR0231059
>
COMPLIANCE INFO 2006 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2019 3:50:24 PM
Creation date
11/16/2018 10:45:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2012
RECORD_ID
PR0231059
PE
2361
FACILITY_ID
FA0002512
FACILITY_NAME
GSG GAS & MART
STREET_NUMBER
701
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734311
CURRENT_STATUS
01
SITE_LOCATION
701 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
440
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK SYSTEM <br />DESIGNATED OPERATOR FACILITY EMPLOYEE TRAINING RECORD <br />For use by Unidocs Member Agencies or where approved by your Local Jurisdiction <br />Authority Cited: Title 23, Div. 3, Ch. 16 California Code of Regulations (CCR) <br />Facility Name: tor" f P-0--5, <br />Facility Site Address: .Z1 9:.. r h�,.i City: <br />Section 2715 of Title 23, California Code of Regulations, requires that Designated Underground Storage Tank Operators <br />provide training to facility employees who have responsibilities associated with the operation and/or maintenance of <br />underground storage tank (UST) systems. This training must be provided by July 1, 2005, and every 12 months thereafter. <br />ror tacllity employees hired atter Jury 1, LUUJ, the initial training must be provided within SU days of the date of hire. At <br />least one of the facility employees present during operating hours must have current training. This training must include, but <br />is not limited to, the following items as specified in 23 CCR Sections 2715(t)(1) and (2): <br />6 VperdllUn 01 LIIC UJ I Sy SLCIll ill Q (Manner C011SISLCII1, W Illi Me lacllny S 13CSL 1V1aIlagellielit Yractlues, <br />❑ The employee's role with regard to UST monitoring equipment as specified in the written UST Monitoring Plan; <br />The employee's role with regard to spills and overfills as specified in the written UST Response Plan; <br />It Name(s) of contact person(s) for emergencies and monitoring equipment alarms; <br />❑ For facilities that are not routinely staffed, facility employee responsibilities as specified in the training program <br />approved by the local UST regulatory agency. <br />23 CCR § 2715(t)(3) requires that a list of employees who have been trained by the Designated Underground Storage Tank <br />Operator(s) be maintained on-site, or off-site at a readily -available location if approved by the local agency, and provided to <br />the local agency upon request. Completion of this form will satisfy UST training record keeping requirements. The following <br />employees have been trained as required by 23 CCR Sections 2715(f)(1) and (2): <br />Facility Employee Name <br />Training Date <br />Hire Date' <br />Trainer Name <br />r%e,? Y <br />1 / <br />1 1 i <br />-:2 <br />1 <br />if hired after July 1, 2005. <br />Trainer must be a current Designated UST Operator for the facility at the time of training. <br />
The URL can be used to link to this page
Your browser does not support the video tag.