Laserfiche WebLink
mw <br />Monitoring System Certification <br />Site Address) L 1 . <br />UST Monitoring Site Plan <br />701 E. CHARTER WAY <br />ENVIRONKA&�irbRE °T <br />. .......................... <br />KEY <br />DEPARTMENT............................ <br />I <br />ANNULAR <br />............................ <br />F=FILLS <br />. . . . . . . . . . . . . . . . . . . . . . <br />. . . <br />T = TURBINE <br />............... ............ I . I . . . . . . . . <br />. . . <br />P=PROBE <br />E....... ............. ............ <br />V=VAPOR <br />. . . . . . . . . . . . . . . . . I I . . . . . . . . . <br />. . . <br />X = SUMP SENSOR <br />. <br />■ N . . . . . . . . . <br />. . . <br />L = Leak Detector <br />M = Manway <br />B = Brine Sensor <br />I = Smart Sensor <br />.................................... ............ <br />S = STP <br />. . . <br />. . . . . . . . . . . . . . . . <br />. <br />C = Floats & Chains <br />t <br />2 <br />E=E Stop <br />3 4 7 8 <br />3>U <br />QQ .VENTS. . . . . . <br />C <br />H <br />A <br />R <br />T <br />E <br />R <br />W <br />A <br />Y <br />Date map was drawn: <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System Certification. On your site plan, <br />show the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank <br />annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in -tank liquid level <br />probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br />Monitoring System Certification Page 4 of 4 2/21/07 <br />