My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
701
>
2300 - Underground Storage Tank Program
>
PR0231059
>
COMPLIANCE INFO_2013 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2023 4:26:58 PM
Creation date
11/16/2018 11:31:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2018
RECORD_ID
PR0231059
PE
2361
FACILITY_ID
FA0002512
FACILITY_NAME
GSG GAS & MART
STREET_NUMBER
701
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734311
CURRENT_STATUS
01
SITE_LOCATION
701 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
077 -.'a <br />,M. <br />UST SYSTEM RETROFIT OR REPAIR IT13 13 2017 <br />(Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br />ENVIHUNNI[_IJIAL <br />1. Site map enclosed? YES [I NO [ J DF-PAIII-NIEN i <br />2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br />person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br />Plan" is available on the jobsite as required by Title 8. <br />3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br />to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br />adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br />pages 4-8 as necessary for a timely plan review). <br />Pull wire from building to sensor location UDC 1/2 & 5/6 due to sensor out. <br />4. List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval): <br />EH230038 (revised 12-11-15) <br />
The URL can be used to link to this page
Your browser does not support the video tag.