My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUTO CENTER
>
2979
>
2200 - Hazardous Waste Program
>
PR0514070
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2021 8:30:13 AM
Creation date
11/26/2018 3:04:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0514070
PE
2227
FACILITY_ID
FA0009868
FACILITY_NAME
STOCKTON HYUNDAI
STREET_NUMBER
2979
STREET_NAME
AUTO CENTER
STREET_TYPE
CIR
City
Stockton
Zip
95212
CURRENT_STATUS
01
SITE_LOCATION
2979 AUTO CENTER CIR
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fm:KNH 10:1`w: can you please Fax (1"wAb93433) 19:1tt1 10/0b/lb Ll V9 10-11 <br />. ....,,k.. ...............,,-........-.. 1 Corp ration <br />jil Prevention Co iance <br />......._....� , <br />P.O. Box 1289 ........ Waterford, CA 95386 Telephone: (209) 969-4851 <br />Email: spccorprcr),hotmail.conj <br />Website: www.,Tcplan.com OCT 05 <br />2017 <br />Certified Assessment Form (PE) for AST Sestets <br />Assessor: Spill Prevention Compliance Corporation Onsite Assessor: Todd McWhorter ENVERONMENT,4 <br />P.O. Box 1289 Telephone: (209) 969-0851 1 EPA,?-rhIER;T <br />Waterford, CA 95386 email: specorpCZhotmail.com <br />------------------------------------------------------------------------ —---------------------------------- ----------- ------- <br />Client: Stockton Hvundai Contact Person: Andy McCue, Service Manager <br />Address: 2979 Auto Center Cir. 2nd Contact- <br />City/State/Zip; Stockton, CA 95212 —Date of Test: 9-22-1.5 <br />Assessment Data- Waste Oil AST —a <br />1 • AST Configuration & age of AST Horizontal AST Single wall steel/approx.15 yrs. old ( estimate ) <br />la. Useful Life Remaining of AST Apgrogimately 15 years of remaining life (Subsection k1410) <br />2. AST Primary vessel construction (describe) 570_gals/Waste Oil/IJL# 402905 /UL142-Container/ Made to UL_ <br />142 construction standard -at least .123in. steel thickness per UL Std.- <br />3. <br />td-3. AST piping (describe) 1 in. galvanized and painted piping from Gram Hus!S j 1.040 Pump to 2 in opening <br />w/fittigg. from pump for supply to top of AST. <br />4. Internal/External pump description external Graco Husky 1040 pump w/2 solenoid 12v_olt-10-200psi-- <br />External pump., which pumas waste oil from service areas (see pic) <br />5. AST' drawing (provided/drawn: source) , (see attached) <br />6. Design Standard (AS1Vl:E, UL, etc.) UL 142 -Cylindrical Single Wail Steel /Mfr: ACE Tank <br />7. AST foundation (describe) concrete berm sub -floor, Base of AST under UL 142 adequate to withstand the <br />load of a full tank -Tank is anchored to floor <br />8. AST anchoring (seismic zone/floatation risk) AST is anchored to the floor slab with 3/8 in. diameter <br />expansion anchors into the concrete berm floor._ Stockton is in a. round -shaking) seismic relion,_but _the _AST <br />is unlikely to move outside the room in an event nor pose a risk of flotation in such an event. The AST is <br />situated in secured lubricants room. <br />9. AST will withstand frost -heave XX Yes N,,) AST sits in concrete cinder block berm <br />10. AST prcviouslyrclocatei? _Yrs XX No <br />11. AST Corrosion Protection Tank is completely covered in paint without evidence of corrosion. Tants has <br />no specific corrosion protection beyond the paint No part of the AST touches the ground. The base of the <br />AST is steel, raising the AST 1 inch above the floor. There is no evidence of corrosion taking place, however <br />there is debris beneath AST which should be removed. Tank's construction ina arias is carbon steel. <br />12. AST Spill Prevention Equipment AST has product is placed into AST via pumping from external Graco <br />Husky Pump. Product generally not handled outside of its intended containers. Product removal occurs via <br />punnyinz out thru a 2 pluzzed opening in top of AST <br />13. Overfill Protection: AST sits in concrete bean with a Sentry product level alaan� in the herrn. This alaran <br />was tested and found to be operating The sound was minimal. and indicative that the batteries in the Alarm <br />should be changed. AST has Krueger level gauge to indicate product levels in AST. <br />
The URL can be used to link to this page
Your browser does not support the video tag.