My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
1660
>
2900 - Site Mitigation Program
>
PR0503028
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2018 4:00:49 PM
Creation date
12/3/2018 3:58:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0503028
PE
2953
FACILITY_ID
FA0005654
FACILITY_NAME
ELISSAGARAY PROPERTY
STREET_NUMBER
1660
Direction
W
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25311028
CURRENT_STATUS
01
SITE_LOCATION
1660 W LINNE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
est CC `7 iMZ:d{f-91 W E SF P.12/19 <br /> %ww ti/ <br /> (5) If a self-contained suit is unavailable, do not continue to work until <br /> measured levels drop below the allowable limits_ <br /> (6) Document site conditions on daily work reports. <br /> ONSffE OgGANIMTION A It INATI <br /> The following personnel are OSHA 40-Hour Health and Safety trained and <br /> designated to carry out the stated job functions onsite: <br /> Project Team Leader. Curtis Payton <br /> Site Safety Offxvn Curtis Payton <br /> Site Safety Officer (Client): Mone <br /> Other Responsible Site Personnel (note job functionsl- <br /> Government Agency Reps: Mary Meays - San Joaquin County Dept. of <br /> Environmental Health <br /> Site Access Contr+al <br /> The individual responsible for coordinating access control is: <br /> SITE SA OFTI R <br /> All personnel entering or departing the site must log in and out. The <br /> following individual keeps the log: 5ITE S&EM QPTI <br /> Access; to the site will be controlled such that no unauthorized person enters <br /> within exclusion areas. Work zones will be designated by the site safety <br /> officer prior to the beginning of work each day or whenever changing site <br /> conditions require that work zone boundaries be altered, All onsite <br /> personnel will be notified of work zone boundaries at the pre-work health <br /> and safety meeting or verbally by the site safety officer whenever zone <br /> boundaries are changed. <br /> W-Q* Zeno <br /> The site safety zone layout and procedures should match the prescribed levels of <br /> personal protection. A discussion for the establishment of the safety zones and the <br /> procedures required for the various levels of personnel protection follows. These <br /> .011eS W1U be l>�►&td Vd if resFiratory protection i required during site activities or <br /> co v"M Effk ffitai Wt9 CVC BANK OF CMRC FSA PRQJ%VACY ma 3\14"PLAN <br /> Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.