My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1988
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
1331
>
2300 - Underground Storage Tank Program
>
PR0231332
>
INSTALL 1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2019 4:03:04 PM
Creation date
12/4/2018 10:49:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1988
RECORD_ID
PR0231332
PE
2361
FACILITY_ID
FA0003961
FACILITY_NAME
LODI MUNI SERVICE CENTER
STREET_NUMBER
1331
Direction
S
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03104050
CURRENT_STATUS
01
SITE_LOCATION
1331 S HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Finishing: After steel troweling, the concrete surfaces shall <br />be given a fine hair broom finish. Brooming on sidewalk shall be <br />transverse to the length of curb. <br />All exposed concrete surfaces shall be finished unless <br />otherwise directed by the Engineer. <br />Score marks and weakened plane joints shall be located as <br />shown on the plans and as directed by the Engineer. <br />Cure: Concrete cure shall be accomplished by either the water, <br />pigmented curing compound or waterproof membrane method and shall <br />conform to the provisions in Section 90-7 "Curing Concrete" of the <br />Standard Specifications. White pigmented curing compound shall <br />not be used on exposed surfaces. <br />6-150 TANK INSTALLATION DETAILS <br />6-150.01 General: The Contractor shall install the City <br />furnished tanks including piping and removal of existing tanks in <br />accordance with Steel Tank Institute recommended procedures, the <br />rules and regulations of the State of California and San Joaquin <br />Local Health District, City of Lodi Building and Fire Codes, and <br />these Special Provisions. <br />6-150.02 Additional Cathodic Protection Anodes: The Contractor <br />shall furnish and install additional cathodic protection anodes as <br />shown in Appendix A. <br />Anode lead wires shall be installed to the cathodic protection <br />test station supplied with the tank with sufficient slack for <br />future connection to the test leads. <br />Multiple anodes shall be installed at equal distances alongside <br />the tank as approved by the Engineer. <br />6.11 <br />TANVr,/TYTw n9m <br />
The URL can be used to link to this page
Your browser does not support the video tag.