My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1988
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
1331
>
2300 - Underground Storage Tank Program
>
PR0231332
>
INSTALL 1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2019 4:03:04 PM
Creation date
12/4/2018 10:49:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1988
RECORD_ID
PR0231332
PE
2361
FACILITY_ID
FA0003961
FACILITY_NAME
LODI MUNI SERVICE CENTER
STREET_NUMBER
1331
Direction
S
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03104050
CURRENT_STATUS
01
SITE_LOCATION
1331 S HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 6 of 13 <br />F. SETTING: Set tanks on prepared bed with a slope downward toward the fill end of the <br />tank. A slope of 3" difference between the two extreme openings of the tank is <br />ind <br />wlower The acceptable remote range of slope is 4" maximum and 2" minimum with the fill <br />pump end of the tank. Tanks that exceed the acceptable slope <br />or that slope downward to the remote pump end are improperly set and must be reset. <br />G. INSTAT=0N WITH APPROVED MATERIALS: place a 12" lift of backfill evenly around the <br />tanks. Push backfill completely underneath the tank and tinder the end caps. This is <br />the most important part of the backfill process. Procedure can be done frcan bank or <br />adjacent tank top. If a man will be in the hole to "work" the backfill, hole must bE- <br />shored or side sloped as prescribed by current OSHA regulations. <br />1. Place second 12" lift or backfill evenly around the tanks. Again, repeat the <br />"working" of backfill along sides under the end caps. Add backfill evenly <br />around the tanks up to the tops of the tanks. <br />2. Backfill to subgrade after piping and testing is completed. <br />6-150.09 TESTIM OF TANKS <br />(Notify Owner's Representative, who MUST observe all tests, at least 24 hours in <br />of any tests.) <br />A. <br />The Contractor is responsible for all labor, material and equipment necessary to <br />conduct the following tests: <br />Pre -Installation Pressure Test, Air <br />After -Installation Pressure Test, Air or Hydrostatic <br />Internal Measurements <br />1. <br />ASTABLE "SOAPS": "Soaping" the tank and fittings during the test is to be <br />done using a small garden -type hand -pressurized spray unit. The test soap sha <br />be a high foaming "soap" that bubbles easily if in contact with an air leak in <br />the tank, but won't bubble due to dispensing from the pressure applicator. <br />Acceptable soaps are: <br />"Seam Test Concentrate" <br />"Amway Loc High Soap" <br />1'#7006 Southbed Leak Detector" <br />•• • •- K •nea•. • r <br />1. <br />PRIMARY (INNER) TANK TEST: Tighten all tank fittings. Locate a pressure gaug <br />in the vent/n-cnitor fitting in the secondary (outer) tank. Locate a second <br />pressure gauge at a fitting in the manway and connect the air pressure hose to <br />this same fitting. Pressurize the primary (inner) tank to a minimum. 4 psi, <br />maximum 5 psi. Monitor the pressure gauges a minimum of 1/2 hour. <br />2. SECONDARY (OCrM) TANK TEST: Leave the pressure on the primary tank. Using a <br />flexible air hose manifold, connect the air pressure hose frathe primary tank <br />to the secondary tank. This manifold hose should be connected to the <br />vent/monitor fitting that does not contain the air pressure gauge. Close the <br />valve to the primary tank and disconnect the air supply. Pressurize the <br />se mndary tank by opening the valve in the manifold system. Soap the entire <br />tank and all fittings. <br />6.17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.