Laserfiche WebLink
1 <br />►J <br />M0 <br />STI—P3 CORROSION MONITORING STATION <br />(TERMINATE ANODE CABLES IN BOX) <br />NOTES: <br />1. Additional anodes for future <br />use. Do not connect anode <br />cables to monitoring terminals. <br />2. Provide the following additional <br />anodes at each tank: <br />TANK 230 W. Elm Street <br />2,000 gal. tank - 2 anodes <br />12,000 gal. tank - 5 anodes <br />1331 S. Ham Lane <br />2 - 2,000 gal. tank - 2 anodes ea. <br />5,000 gal. tank - 4 anodes <br />10,000 gal. tank - 6 anodes <br />INSTALL 2x2x60' —20+ PREPACKED MAGNESIUM ANODE <br />(INSTALL ANODE VERTICAL OR HORIZONTAL) <br />WITH 5—GALLONS WATER BEFORE BACKFILLING <br />WITH NATIVE SOIL ONLY <br />TYPICAL ANODE INSTALLATION <br />