Laserfiche WebLink
5.403 Permits and Licenses Except as otherwise <br />provided, the Contractor shall procure all permits <br />and licenses, pay all charges and fees, and give all <br />notices necessary and incidental to the due and <br />lawful prosecution of the work. <br />5.404 Contractor's Licensin Laws Attention is <br />directed to the PrOvis_1_0_ns___0T Chapter 9 of Division <br />3 of the Business and Professions Code concerning <br />the licensing of contractors. <br />All hidders and contractor, shall hr licenced in <br />accordance with the laws of the State of California <br />and any bidder or contractor not so licensed is <br />subject to the penalties imposed by such laws. <br />5.405 Patents The' Contractor shall assume all <br />response ides arising from the use of patented <br />materials, equipment, devices or processes used on <br />or incorporated in the work. <br />5.406 Safety Provisions The Contractor shall <br />conform to the rules and regulations pertaining to <br />safety established by the California Division of <br />Industrial Safety. <br />5.407 Public Convenience and Safety The <br />Conti -actor shall so conduct the operation as to <br />cause the least possible obstruction and <br />inconvenience to public traffic. Unless other <br />vxI%fluff %lirrf. ora :l lI'll l.lnd In Ihr 1.I1r, fal <br />Provisions to be used as detours, oll trotfic shall <br />be permitted to pass through the work. <br />Residents along the road or street shall be provided <br />Passage as far as practicable. Convenient access to <br />driveways, houses and buildings along the road or <br />street shall be maintained and temporary crossing <br />shall be provided and maintained to good condition. <br />Not more than one cross or intersecting street or <br />road shall be closed at any one time without the <br />approval of the City Engineer. <br />The Contractor shall furnish, erect and maintain <br />such fences, barriers, lights, signs and flag <br />persons as are necessary to give adequate warning to <br />the public at all times that the road or street is <br />under construction and of any dangerous conditions <br />to be encountered as a result thereof, and shall <br />also erect and maintain such warning and directional <br />signs as may be furnished by the City. <br />Signs, lights, flags and other warning and safety <br />devices shall conform to the requirements set forth <br />in the current "Manual of Warning Signs, Lights and <br />Devices for Use in Performance of Work upon <br />Highways," issued by the State of California <br />Department of Transportation. Copies of this manual <br />are on file with the Public Works Department. <br />No material or equipment shall be stored where it <br />will interfere with the free and safe passage of <br />public traffic, and at the end of each day's work <br />and at other times when construction operations are <br />suspended for any reason, the Contractor shall <br />remove all equipment and other obstructions from <br />that portion of the roadway open for use by public <br />traffic. <br />Full compensation for doing the above-mentioned work <br />shall be included in the price paid for the various <br />contract items of work, and no additional <br />compensation will be allowed therefor. <br />5.4 <br />5.408 Pre,ervation of Property Due care shall be <br />exercised to avoid injury to existing improvements <br />or facilities, utility facilities, adjacent <br />property, and trees, shrubs and other plants that <br />are not to be removed. <br />Trees, shrubs and other plants that are not to be <br />removed, and pole lines, fences, signs, markers and <br />monuments, buildings and structures, and any other <br />above ground improvements or facilities and all <br />underground facilities shown on the plans or brought <br />to the Contractor's attention during the contract, <br />wiLhin or adjacent to the highway, shall be <br />protected from injury or damage; and if ordered by <br />the Engineer, the Contractor shall provide and <br />install suitable safeguards, approved by the <br />Engineer, to protect such objects from injury or <br />damage. Such objects injured or damaged by reason <br />of the Contractor's operations shall be replaced or <br />restored to a condition as good as when the <br />Contractor entered upon the work, or as good as <br />required by the specifications accompanying the <br />contract. The Engineer may make or cause to be made <br />such temporary repairs as are necessary to restore <br />to service any damaged facility. The cost of such <br />repairs shall be borne by the Contractor and may be <br />deducted from any moneys due or to become due to the <br />Contractor under the contract. 4 <br />Full compensation for furnishing all labor, <br />rnatnrfalc, tools, orinirment and inridental,, and for <br />doIny all Lhc wurh IoVuIVed In prulruLIng ui' <br />repairing property as specified in this section, <br />shall be considered as included in the prices paid <br />for the various contract items of work, and no <br />additional compensation will be allowed therefor. <br />5.409 Res onsibilit for Damage The City of <br />Lodi, the City Council, all officers and employees <br />or agent shall not be answerable or accountable in <br />any manner for any loss or damage that may happen to <br />the work or any part thereof; or for any material or <br />equipment used in performing the work; or for injury <br />or damage to any person or persons, either work <br />personnel or the public; for damage to adjoining <br />property from any cause whatsoever during the <br />progress of the work or any time before final <br />acceptance. <br />The Contractor shall indemnify and save harmless the <br />City of Lodi, the City Council, all officers and <br />employees or agent from any suits, claims or actions <br />brought by any person or persons for or on account <br />of any injuries or damages sustained or arising in <br />the construction of the work or in consequence <br />thereof. The City Council may retain as much of the <br />money due the Contractor as shall be considered <br />necessary until disposition has been made of such <br />suits or claims for damages as aforesaid. <br />5.410 Contractor's Responsibility for Work <br />Except as provided above, until t e orma <br />acceptance of the work by the City Council, the <br />Contractor shall have the charge and care thereof <br />and shall bear the risk of injury or damage to any <br />part thereof by the action of the elements or from <br />any other cause, whether arising from the execution <br />or from the nonexecution of the work. <br />The Contractor shall rebuild, repair, restore and <br />make good all injuries or damages to any portion of <br />the work occasioned by any of the above causes <br />before final acceptance and shall bear the expenses <br />