Laserfiche WebLink
F. In-Tank Gauging / SIR Equipr 1t: ,Check this box if tank ging is used only for inventory control. <br /> ❑ Check this box if no tanK gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to pei-form leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* I Were all items on the equipment manufacturer's maintenance checklist completed? <br /> " In the Section H, below, describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> �omplete the following checklist: I <br /> Yes ❑ No* I For equipment start-up or annual equipm t ertification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all Thal apple) Simulated leak rate g.p.h.; ❑ 0.1 g.p.h ; ❑ 0.2 g.p.h. <br /> ]" Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes ❑ No* Was the testing apparatus properly calibrated? <br /> )-Yes ❑ No* For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br /> .ISN/A <br /> I Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> I�N/A or disconnected? <br /> ! Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> CSN/A malfunctions or fails a test? <br /> Yes ❑ Np* For electronic LLDs, have all accessible wiring connections been visually inspected? <br /> D'N/A <br /> Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H, below, describe how and when these deficiencies were or will be corrected. <br /> Comments: <br />