Laserfiche WebLink
SWIZCB,January 2002 Page of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ❑Industry Standard X Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Caldwell Systems Equipment Resolution: .005/30 min <br /> INK9,011"6 Sump# 1 Sump#2 Sump#3 Sump# <br /> Sump Diameter: 40" 40" 35" 35" <br /> Sump Depth: 30" 30" 27" 27" <br /> Sump Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 15" 10" 16" 12" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 10" 7" 22" 27" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry Dry Dry Dry <br /> Portion of Sump Tested' 2"above Highest Piping Penetration <br /> Does turbine shut down when <br /> sump sensor detects liquid(both x Yes ❑No ❑NA x Yes ❑No ❑NA x Yes ❑No ❑NA x Yes ❑No ❑NA <br /> product and water)?; <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe x Yes ❑No ❑NA x Yes ❑No ❑NA x Yes ❑No ❑NA x Yes ❑No ❑NA <br /> shutdown? <br /> Was fail-safe verified to be <br /> El Yesx No ❑NA ❑Yes x No ❑NA ❑Yes x No El NA ❑Yes x No ❑NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5 Min 5 Min 5 Min 5 Min <br /> test: <br /> Test Start Time: 9:50 9:35 11:30 1:15 <br /> Initial Reading(111): .00 .00 .00 .00 <br /> Test End Time: 10:20 10:05 12:00 1:45 <br /> Final Reading(RF): .00 .00 .00 .00 <br /> Test Duration: 30 Min 30 Min 30 Min 30 Min <br /> Change in Reading(RF-R,): .00 .00 .00 .00 <br /> Pass/Fail Threshold or Criteria: .005/30 Min .005/30 Min .005/30 Min .005/30 Min <br /> Test Result: x Pass ❑Fail x Pass ❑Fail x Pass ❑Fail x Pass ❑Fail <br /> Was sensor removed for testing? x Yes ❑No ❑NA x Yes ❑No ❑NA x Yes ❑No ❑NA x Yes ❑No ❑NA <br /> Was sensor properly replaced and <br /> verified functional after testing? x Yes ❑No ❑NA x Yes ❑No ❑NA x Yes ❑No [INA x Yes ❑No ❑NA <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*) is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />