Laserfiche WebLink
UPSYSTEM RETROFIT OR REAR <br /> (Submit minimum of 2 sets of plans&applications as originals will be retained by EHD) <br /> 1_ Site map enclosed YESIX NO[] <br /> 2. Manufacturer's spec sheets attached for all equipment to be installed YES 4NO[J <br /> 3. Description of work to be completed (If adding piping, UDC's, or other UST equipment, or performing tank top upgrade, <br /> use the UST Installation Application pages 4-8 as necessary for a timely plan review): <br /> _EVR Phase TT Update See Attached <br /> 4. Description of equipment to be used(Attach drawings/blueprints as necessary): <br /> See Attached, <br /> 5. All equipment is State certified or approved. YES RkNO[J <br /> 6. Decontamination Procedures: <br /> a. Will piping be decontaminated prior to removal? YES[] NO[] <br /> b. Identify contractor performing decontamination: <br /> Name Phone( ) <br /> Address City Zip <br /> c. Describe method to be used for decontamination: <br /> d. Describe how rinsate material will be stored onsite prior to manifesting offsite: <br /> e. Rinsate Hauler and permitted Treatment, Storage&Disposal Facility: <br /> Hauler Name Phone(_) Hauler Reg# <br /> Address ity Zip <br /> Permitted Disposal Site <br /> 7. a. Describe the method that will be utilized to purge and/or inert Uhe piping: <br /> b. Piping Hauler: <br /> Name Phone( <br /> Address City Zip <br /> Hauler Registration#(if hauled as hazardous) <br /> c. Piping Disposal Site: <br /> Name Phone( <br /> Address City Zip <br /> EPA ID#(if transported to a permitt SD facility) <br /> & Is the sampling firm an indepe nt third party from the contractor? YES[] NO[] <br /> 9. Describe, in detail, how th soil and/or water sample(s)beneath the piping or dispenser will be obtained: <br /> 10. Handling of ex ated soil(Contaminated Soil Hazardous Waste Hauler): <br /> Name Hauler Registration# Phone( <br /> Address City Zip <br /> b) If it is not to be hauled, describe what will be done with it: <br /> 2 <br />