Laserfiche WebLink
-2- <br /> 2. Inoperative vapor pumps, as determined by the ARB Approved Installation, <br /> Operation and Maintenance Manual, constitute a defect. <br /> 3. For unihose dispensers, any modifications or repairs to the nozzle, hanging <br /> hardware or vacuum pump done to bring one fuel grade V/L into compliance at <br /> a fueling point invalidates the results of any previous fuel grade(s) tested before <br /> the alteration. All fuel grades at that fueling point shall be tested again to verify <br /> compliance. <br /> Inverted Coaxial Hoses <br /> 1. The maximum length of the hose assembly, including hose adaptor, whip hose, <br /> breakaway, flow limiter (optional) and inverted coaxial hose, measured at the base <br /> of the nozzle, shall be no more than twenty (20) feet. <br /> 2. Any hose configuration is allowed. <br /> Breakaway Couplings <br /> 1. Testing is required after reconnecting the breakaway to ensure proper operation <br /> and no observed leaks. The procedure for reconnecting breakaway and fueling <br /> point testing after a drive-off, referenced in Section 1.4 of Healy Systems <br /> Scheduled Maintenance, shall be conducted to verify that breakaway, hose and <br /> nozzle are operating properly after a drive-off. <br /> Flow Limiters <br /> 1. Flow limiter is mandatory when the flow rate is greater than 10.0 gallons per minute <br /> to comply with U.S. EPA requirement. <br /> Clean Air Separator Pressure Management System <br /> 1. The Clean Air Separator(CAS) is a passive gasoline storage tank ullage <br /> pressure management system, with no electrical requirements. The Clean Air <br /> Separator vapor integrity shall be evaluated using the test procedure outlined in <br /> Exhibit 4 of this Executive Order. <br /> a. A Clean Air Separator that fails the leak decay test outlined in <br /> Exhibit 4 shall be considered a defect. <br /> b. Unless there is maintenance or testing being conducted on <br /> the Clean Air Separator, the four ball valves shall be locked <br /> in the positions shown in Figure 2113-2 or 2B-2H for normal <br /> Clean Air Separator operation. Figure 213-2 applies to vertical <br /> CAS installations and Figure 213-21-1 applies to horizontal CAS <br /> installations. A Clean Air Separator that is not in the proper <br /> operating configuration shall be considered a defect. <br /> Healy Systems, Inc. Phase 11 EVR System, Exhibit 2-VR-201-H <br />