Laserfiche WebLink
S WRCB,January 2002 Page of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer ❑ Industry Standard X Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Caldwell Systems Equipment Resolution: .005/30 min <br /> Sump# 1 Sump# Sump# Sump# <br /> Sump Diameter: 42" <br /> Sump Depth: 42" <br /> Sump Material: Fiberglass <br /> Height from Tank Top to Top of 21" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 1811 <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry <br /> Portion of Sump Tested' 2"above Highest piping penetration <br /> Does turbine shut down when <br /> sump sensor detects liquid(both x Yes ❑No ❑N A ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> product and water)?` <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe x Yes ❑No ElNA 11Yes ❑No ❑NA ElYes ❑No 11NA ❑Yes ❑No ❑NA <br /> shutdown? <br /> Was fail-sfail-safe verified to be <br /> operational?` ❑Yes x No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ElNA ❑Yes ❑No ❑NA <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5 min 5 min 5 min 5 min <br /> test: <br /> Test Start Time: 9:10 <br /> Initial Reading(RI): .00" .00" .00" .00" <br /> Test End Time: 9:40 <br /> Final Reading(RF): .00 <br /> Test Duration: 30 min 30 min 30 min 30 min <br /> Change in Reading(RF-RO: .00 <br /> Pass/Fail Threshold or Criteria: .005/30 min .005/30 min .005/30min .005/30 min <br /> Test Result: x Pas ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? x Yes ❑No ❑NA x Yes ❑No ❑NA x Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and x Ye ❑No ❑NA x Yes ❑No ❑NA x Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> verified functional after testin ? <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to a�of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />