Laserfiche WebLink
OCT-25-2007 17:53 CITY OF LODI 209 333 6710 P.07 <br /> UNDERGROU# STORAGE TANK MON, -)RING PLAN <br /> For use by Unidocs Member Agencies or where approved by your Local Jurisdiction <br /> Authority Cited. Title 23 CCR, Sections 2632(d)(1), 2634(d)(2), and 2641(h) <br /> TYPE OF ACTION [j1.NEW PLAN ® 2.CHANGE OF INFORMATION Mol, <br /> PIAN TYPE ISI MONITORING IS IDENTICAL.FOR ALL USTs AT THIS FACILITY. � <br /> (Check one item only) [I THIS PLAN COVERS ONLY THE FOLLOk'ING UST SY STEXI(S): - <br /> L FACRX]rY INFORMATION <br /> FACILITY ID#(Agency Use Only) -FACILITY NAME City of Lodi, Municipal Service Center <br /> FACILITY SITE ADDRESS 1331 S. Ham Lane CITY Lodi, CA. 95242 Mos <br /> 11 EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> State law requires that testing,preventive maintenance,and calibtarion of monitoring equipment(e.g_,sensors,probes,line leak detectors,etc.)be performed in "06 <br /> accordance with the equipment manufactums'instructions,or annually,whichever is more frequent. Such work must be performod by qualified personnel. <br /> MONITORING EQUIPMENT IS SERVICED 0 L ANNUALLY El99.OTHER(Specify): M07 <br /> ICL MONPTORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(Le.,location of each sensor, <br /> lime Irak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form,Hazardous Materials Business Plan Tm ,cm)which shows all requi ed information,include it with this plan. <br /> IV. TANK MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) Mlo. <br /> ® 1,CONTINUOUS ELECTRONIC MONITORING OF TANK.ANNULAR(INTERSTITIAL)SPACES)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM Mu. <br /> PANEL MANUFACTURER: Veedef-Root Mlz MODEL#- TLS 35Q Kn3. <br /> LEAK SENSOR MANUFACTURER: Veeder-R00t M14. MODEL#(S): 420 Mrs <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINULE WALL TANKS) <br /> PANEL MANUFACTURER: 416' MODEL#: MIT <br /> IN TANK PROBE MANUFACTURER: MIR. MODEL#(S): t(14, <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY M20 <br /> ❑ d,MONTHLY ❑ e.OTHER(Specify): MEI. <br /> PROGRAMMED TESTS: ❑ a.0.1 gp.b. ❑ b.0.2 g.p.h. ❑ a OTHER(Specify): Harz tun. <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR 42646.1 mu. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR¢2645 <br /> TESTING PERIOD: ❑ a 36 HOURS ❑ b.60 HOURS tits. <br /> ❑ 5.RMGRTTY TESTING PER 23 CCR§2643.1 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): MM. d¢T. <br /> ❑ 6.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY Tump�a9mcy��,1) <br /> ❑ 99.OTHPR(3 ecify): <br /> V. PIPE MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) 1`V0 <br /> ® 1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(SyrRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: ® a-DRY L] b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM M31. <br /> PANEL MANUFACTURER Veeder-Root W1 MODEL#. TW 359 M33. <br /> LEAK SENSOR MANUFACTURER: Veeder-R of m4- MODEL#(S): 208 mss' <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(Le.,TURBINE)SHUTDOWN? M a.YES ❑ b.NO M36. <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ® a.YES 0 b_NO M'T' <br /> ® 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFP <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED <br /> SILLD MANUFACTURER(s):U- Petro: Vaporless Mantl. Inc. UMD "°R MODEL#(S): STP-MLD f2; 99 LD2000 9. <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 Sp-h.LEAK TESTS <br /> ELLD MANUFACTURER: Moo" MODEL#; W41, <br /> PROGRAMMED LINE INTEGRn Y TEST'S: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.ph. M41 <br /> WILL ELLD DE'=ION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO tom. <br /> WILL 13LLD FAILORFJDISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO Ma.' <br /> [14.INTEGRITY TESTING <br /> TEST FREQUENCY: [3a.ANNUALLY [3b.EVERY 3 YEARS [I c.OTHER(Specify) Mos. M46 <br /> ❑ 5.V1SrT 41.MONITORING DONE: ❑ a.DAILY ❑ b,WEEKLY# ❑ c.MIN.MONTHLY&EACHTIME SYSTEM OPERATED" M47. <br /> ' K"icy Wco�a '',allowed for momlomW of imlxmed ffHwVDcy jRnatbr finl 0 0"S Holy VW 113C 1=2Z1.50Xj) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(a)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> k48, <br /> ❑ <br /> 99.OTHER(S cifv) <br />