Laserfiche WebLink
Moniler*rgSystem Certification <br /> Site Address: <br /> Date of'festing/Servicing: <br /> F. In-Tank Gauging/SIREquipment: <br /> ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑'Clreck this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perforin leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H, below, describe hOw and when tl_ese deficiencies were or wiii be corrected. <br /> G. Line Leak Detectors (LLD): &.1-c—Ileck this box if LLDs are not installed. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLDdsystem <br /> ❑ N/A (Check all that apply) Simulated leak rate: ❑ 3 g.p.h.; ❑ 0.1 g.p.h ; ❑ 0.2 g.p.h. <br /> ❑ Yes Cl No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑ Yes ❑ No* Was tl�e testing apparatus properly calibrated? <br /> ❑ Yes ❑ No* For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> O Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring syste <br /> ❑ N/A or disconnected? <br /> 7 Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monito <br /> ❑ N/A malfunctions or fails a test? <br /> Yes ❑ No* For electronic LLDs, have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> ] Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist.completed? <br /> In the Section H, below, describe how and when these deficiencies were or will be corrected. <br /> L Comments: <br />