Laserfiche WebLink
Dec 15 06 10: 36a JP Petroleum Service 916372"973 P. 3 <br /> A 12/15/2006 12:49 8329 92 AMERON CONFIDENT' PAGE 02 <br /> At% <br /> Fiberglass-Composite Pipe Division <br /> AWRON _ " <br /> INTERNATIONAL <br /> DUALOY° 3000 <br /> INSTALLATION PROCEDURES TRAINING <br /> CERTIFICATION OF COMPLETION <br /> Ameron International Fiberglass-Composite Pipe Division <br /> hereby certifies that <br /> Gabe Garcia <br /> �P Petroleum Service <br /> has completed training on the proper installation procedures for <br /> the Dualoy 3000 UL Listed fiberglass piping systems <br /> indicated below as manufactured by the <br /> Fiberglass-Composite Pipe Division of <br /> Ameron International Corporation. <br /> DUALOY 3000 <br /> ® iL ® J.Cx <br /> California <br /> Location of Training <br /> October 27, 2006 <br /> Date of Training <br /> B_ ill Robbins <br /> -----------... ------ - ---- - ----_ <br /> Issued By <br /> Certificate valid for three years from date of issue <br /> 9720 Cypresswood Drive, Houston, TX 77070 <br />