Laserfiche WebLink
11-'aonocring System Ccrtific:itiou <br /> Site Address: <br /> ---- Date of"I•esling/Servicing: <br /> T In-Tank Gauging / SIR Equipment: <br /> XJ Check this box if tank gauging is used only for inventory control. <br /> CJCheck this box if no tank gauging or SIR equipment is installed. <br /> TJlis section must be completed if in-tank gauging equipment is used to perform IcA detection monitoring. <br /> Complete the following checklist: <br /> -O Yes Cl No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> C] Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> k7 Yes ❑ No* Was accuracy of system product level readings tested? <br /> 0 Yes ❑ No* Was accuracy of system water level readings tested? <br /> ,Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H, below, describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No* For equipment start-up or annual equipment C ttification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak rate:-el 3 g.p•h,; ❑ p.1 9-p-h ; ❑ 0.2 g.p.h. <br /> ❑ Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑ Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑ No* For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ o* For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br /> N/A <br /> ❑ Yes ❑ dao* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> N/A or disconnected? <br /> Yes ❑ Afo* For electronic LLDs, does file turbine automatically shut off if any portion of the monitoring system <br /> N/A malfunctions or fails a test? <br /> 7 Yes ❑ o* For electronic LLDs, have all accessible wirinb connections been visually inspected? <br /> ,01 N/A <br /> Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H, below, describe now and when these deficiencies were or wil! be corrected. <br /> I. Comments: <br />