My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006 - 2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
1331
>
2300 - Underground Storage Tank Program
>
PR0231332
>
COMPLIANCE INFO 2006 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2019 4:07:20 PM
Creation date
12/5/2018 9:18:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2010
RECORD_ID
PR0231332
PE
2361
FACILITY_ID
FA0003961
FACILITY_NAME
LODI MUNI SERVICE CENTER
STREET_NUMBER
1331
Direction
S
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03104050
CURRENT_STATUS
01
SITE_LOCATION
1331 S HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARB Approved IOM—Healy Phase 11 EVR System—VR-201-A(Breakaway—8701 VV) Page 27 <br /> Healy Model 8701W Breakaway <br /> �5 <br /> O <br /> HEALY STALE II VAPOR RECOVERY (HEft END <br /> PART NO.0701VV BREAKAWAY(HOSE BREAK) (?i5E ADDAA PTOR) <br /> AS@EWLY d IN4TALLATiON INE MCTIONS 9 <br /> e <br /> 0 The Healy Breakaway is delivered loosely assembled.Handle 0—rings -- <br /> carefully to avoid dropping and/or losing the precision parts. install as - -- 4 <br /> shown <br /> ■ Failure to remove the Shear screw(Item 1)as described in _ <br /> Step 1 below could result in fracturing or shearing of the screw <br /> The Shear screw wffl require replacement if damaged. <br /> ■ Be sure to assemble parts in the exact sequence as shown below. <br /> ■ Be sure to lubricate all o-rings and quad seals where indicated. <br /> Use of ordinary motor oil is sufficient. PIGTAIL ;: <br /> ■ Do not use threod-seeling compounds on straight threads. <br /> ASCEMBLY INSTRUCT11048 4 <br /> (refer to diagram at right) <br /> STRAIGHT <br /> 1.Remove the Shear Screw(Item 1) and the packing materials_ _ THREAD <br /> Separate the halves of the breakawoy assembly,retaining the 6 <br /> loose Internal valves.(Items 2 do 3)and the spring(item 13) <br /> Imide the upper half. 5 <br /> 2.Select the pigtail,(whip hose)assembly. Lubricate the quad t <br /> and o-ring seals(Items 4, 5.8,do straight thread, Item 8). <br /> Assemble the pigtail to the input half of the Breakaway(Item 7) 14 <br /> being sure that the larger end of the conical spring is centered Quad rings <br /> in the groove on the white valve.Tighten hose to Breakaway at Install as 2 <br /> 35 foot pounds.Be sure the vapor tube fitting slides easily Into sheen <br /> Item 2 before final tightening. <br /> 7 <br /> 3.Select the delivery hose,lubricate the a—ring(Item 4),the quad <br /> seal(Item 5)and straight thread(Item 6). Assemble the end with <br /> the quad seal to the output half of the Breakaway(Item 10), BREAKAWAY <br /> install the secondary hose and tighten to 35 foot pounds.Be aura t2 <br /> the vapor tube fitting elides easily into item 3 before final tightening. ALIGNMENT <br /> PIN <br /> 4.Carefully fit both halves of the Breakoway together.Utlizing t l <br /> the alignment pin,fully compress both halves and insert the -- , <br /> Shear Screw(Item 1)and hand tighten. Final tighten to 20 ; c=a SPARE <br /> Inch pounds.Toole should not be necessary to Initially start 10 <br /> the screws. <br /> 11 <br /> 11 2 1 1-117 1 tno 1,11MEns OFFM <br /> to t 1.mot-n- SM,xwex 706 <br /> 13$4 <br /> 112 t ' 0-MU-i <br /> 2 -sa o-traPrenoa1 saw.mono <br /> Quad rings r <br /> s s 1-02 o- PR�aI 7 an inctall as 6 <br /> 7 t calm-748 seer,oWKNO k aAs *74al shown <br /> a 2 rq5 rtrwa <br /> 5 4. 4013 auw-ww 514W I 4 <br /> 4 4 I-= 0-R!Iri"MMM 95747HOSE <br /> 2 i MM-740 VALV(I)SM 14 s.0 100761-718 aM".SOL <br /> ROA 112 ow ONO Na. OEPOWnIO1 PN <br /> LIST OF ILA TENK <br /> PRODUCT-TO NO22LE4FNO <br /> Healy Systems, Inc. Website: http:/twww.healysystems.com <br /> 18 Hampshire Drive Email: sales@healysystems.com <br /> Hudson, New Hampshire 03051 USA Telephone:603.882.2472 <br /> ARB Approved Installation, Operation and Maintenance Manual (April 8, 2005) Fax: 603.882.5189 <br /> Healy Systems, Inc —the innovative leader in Stage til vapor recovery equipment <br />
The URL can be used to link to this page
Your browser does not support the video tag.