Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer ❑Industry Standard X Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Spec) <br /> W <br /> quipment Used:Caldwell Level Change Indicator Equipment Resolution: .002 <br /> Sump# 1 Sump#2 Sump#3 Sump# <br /> Sump Diameter: 42" 42" 46"Hexagon <br /> Sump Depth: 40" 41" 41 ''/:" <br /> Sump Material: Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 16" 10" 21 ''/z" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 10" 10" 18" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry Dry Dry <br /> Portion of Sump Tested' Water Line 18" Water Line 13" Water Level 23 '/:" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both X Yes ❑No ❑NA X Yes ❑No ❑NA X Yes ❑No [INA <br /> product and water)?. <br /> Turbine shutdown response time Not Alarmed Not Alarmed Not Alarmed <br /> Is system programmed for fail-safe X Yes ❑No ❑NA X Yes ❑No ❑NA X Yes ❑No ❑NA <br /> shutdown?* <br /> Was fail-safe verified to be Yes X No ❑NA Yes X No ❑NA Yes X No ❑NA <br /> operational?* <br /> Wait time between applying water <br /> 5 Minutes 5 Minutes 5 Minutes <br /> and starting test: <br /> Test Start Time: 8:30 8:35 8:40 <br /> Initial Reading(111): .001 .001 .001 <br /> Test End Time: 9:00 9:05 9:10 <br /> Final Reading(RF): .001 .001 .001 <br /> Test Duration: 30 Minutes 30 Minutes 30 Minutes <br /> Change in Reading(RF-Ri): 0 0 0 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes .005/30 Minutes .005130 Minutes <br /> Test Result: X Pass ❑Fail X Pass ❑Fail X Pass ❑Fail ❑ Pass []Fail <br /> Was sensor removed for testing? X Yes ❑No ❑NA X Yes E No ❑NA X Yes ❑No ❑NA []Yes ❑No NA <br /> Was sensor properly replaced and X Yes ❑No ❑NA X Yes ❑No ❑NA X Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> verified functional after testing? <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to an of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />