My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
1331
>
2300 - Underground Storage Tank Program
>
PR0231332
>
COMPLIANCE INFO_2011 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2019 3:42:16 PM
Creation date
12/6/2018 9:19:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011 - 2018
RECORD_ID
PR0231332
PE
2361
FACILITY_ID
FA0003961
FACILITY_NAME
LODI MUNI SERVICE CENTER
STREET_NUMBER
1331
Direction
S
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03104050
CURRENT_STATUS
01
SITE_LOCATION
1331 S HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECE, - , -- <br /> SWRCB,January 2002 ii; Pg oV of <br /> 5. SECONDARY PIPE TESTING rti n, 1-NTAL <br /> Test Method Developed By: X Piping Manufacturer ❑Industry Standard ❑ProfessWnhl't% <br /> ❑Other(Spec) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1/10-15 Psi <br /> Piping Run#1 Piping Run#2 Piping Run#3 Piping Run# <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith <br /> Piping Diameter: 3" 3" 3" <br /> Length of Piping Run: Approx.42' Approx. 15' Approx.35' <br /> Product Stored: Regular 87 Master Regular 87 Siphon Diesel <br /> Method and location of Test boot at STP Test boot at Test boot at STP <br /> piping-run isolation: Piping Sump#1 Piping Sump#2 Piping Sump#3 <br /> Wait time between applying 5 Minutes 5 Minutes *See comments <br /> pressure and starting test: <br /> Test Start Time: 11:15 11:05 11:25 <br /> initial Reading(RI): 3 Psi 3 Psi 0 Psi <br /> Test End Time: 12:15 12:05 *See comments <br /> Final Reading(RF): 3 Psi 3 Psi 0 Psi <br /> Test Duration: 1 Hour 1 Hour *See comments <br /> Change in Reading(RF-R,): 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Threshold or No Loss in Psi No Loss in Psi No Loss in Psi <br /> Criteria: <br /> Test Result: Pass Pass Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> *Piping Run#3 Diesel will not build pressure due to a torn test boot at the UDC. Unable to change test boot due to <br /> UDC components blocking access to reach test boot. <br /> Recommend a repair contractor remove Healy Vacuum Pump and connected copper tubing to allow possible access. <br /> Recommend test boots on both Diesel and Regular 87 at UDC be change when access is made available. <br /> Note: Test boot for the Regular 87 Secondary Pipe at the UDC is still able to hold test pressure at this testing event. <br />
The URL can be used to link to this page
Your browser does not support the video tag.