My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
1331
>
2300 - Underground Storage Tank Program
>
PR0231332
>
COMPLIANCE INFO_2011 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2019 3:42:16 PM
Creation date
12/6/2018 9:19:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011 - 2018
RECORD_ID
PR0231332
PE
2361
FACILITY_ID
FA0003961
FACILITY_NAME
LODI MUNI SERVICE CENTER
STREET_NUMBER
1331
Direction
S
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03104050
CURRENT_STATUS
01
SITE_LOCATION
1331 S HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> SWRCB,January 2002 HiaX3 204 <br /> Secondary Containment Testing Report Form ENVIRONMENTAL <br /> This form is intended for use by contractors performing periodic testing of UST secondary containment systems. C>p4tFj)?ARTkAENT <br /> appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and <br /> printouts from tests(f applicable),should be provided to the facility owner/operator for submittal to the local regulatory agency. <br /> 1. FACILITY INFORMATION <br /> Facility Name: City of Lodi/Lodi Corporation Yard Date of Testing: October 24,2017 <br /> Facility Address: 1331 South Ham Lane,Lodi,Ca.95241 <br /> Facility Contact: Randy Laney I Phone: (209)333-6830 <br /> Date Local Agency Was Notified of Testing: 9/12/2017 <br /> Name of Local Agency Inspector(fpresent during testing): <br /> 2. TESTING CONTRACTOR INFORMATION <br /> Company Name: Afford-a-test <br /> Technician Conducting Test: Benjamin F.Duncan Jr./ICC#5246802-UT <br /> Credentials: X CSLB Licensed Contractor X SWRCB Licensed Tank Tester <br /> License Type: A License Number: CSLB Lic.4341375/SWRCB Lic. 490-1120 <br /> Manufacturer Tr <br /> aiming <br /> Manufacturer Component(s) Date Training Expires <br /> Caldwell Systems Piping Sumps/UDC July 5,2020 <br /> 3. SUMMARY OF TEST RESULTS <br /> Component Pass Fail Not Repairs Component Pass Fail Not Repairs <br /> Tested Made Tested Made <br /> Annular Tank#1 X ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Annular Tank#2 X ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Annular Tank#3 X ❑ ❑ ❑ ❑ ❑ ❑ 1 ❑ <br /> Secondary Pipe#1 X ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Secondary Pipe#2 X ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Secondary Pipe#3 ❑ X ❑ ❑ ❑ ❑ ❑ ❑ <br /> Piping Sump #1 X ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Piping Sump#2 ❑ X ❑ ❑ ❑ ❑ ❑ ❑ <br /> Piping Sump#3 X ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Dispenser Sump#1&2 ❑ ❑ X ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ El <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> If hydrostatic testing was performed,describe what was done with the water after completion of tests: <br /> Test Fluid Supplied and recovered for reuse. <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> To the best of my knowledge,the facts stated in this document are accurate and in full compliance with legal requirements <br /> Technician's Signature: �` �� Date: October 24,2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.