My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2002 - 2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2575
>
2200 - Hazardous Waste Program
>
PR0514045
>
COMPLIANCE INFO 2002 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2019 2:43:09 PM
Creation date
12/6/2018 3:41:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002 - 2017
RECORD_ID
PR0514045
PE
2220
FACILITY_ID
FA0006439
FACILITY_NAME
COUNTRY CLUB MOBIL CIRCLE K
STREET_NUMBER
2575
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
2575 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPµ��!ry <br />004).•'.COG <br />2. ENVIR <br />ENTAL HEALTH PART <br />MENT <br />Donna K. Heran, R.E.H.S. SAN JOAQUIN COUNTY Program Coordinators <br />Director 600 East Main Street, Stockton, California 95202 Kasey L. Foley, R.E.H.S. <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Robert McClellon, R.E.H.S. <br />Web: www.sjgov.org/ehd Jeff Carruesco, R.E.H.S. <br />Linda Turkatte, R.E.H.S. <br />SITE HEALTH & SAFETY PLAN <br />PART-� -- <br />GENERAL SITE INFORMATION <br />1. Site Name: �M q C (, 6 7 (e <br />Address: L <br />Contact Person: <br />Phone #: (120 1'75-0X16,--7 <br />Proposed Date of investigation/inspection: /2c—/t <br />2. Description and brief narrative of inspection activity: <br />❑ New UST installation <br />❑ UAR Investigation <br />❑ Tank Closure in Place <br />❑ Tank/Pipe Repair <br />❑ Tank/Pipe Removal <br />❑ Re -excavation <br />❑ Sampling <br />❑ Boring / Monitoring Well installation <br />_[54Hazardous Waste inspection <br />❑ Tiered Permitting inspection <br />3. Specific Site Information: <br />Tank No.: <br />Tank Capacity: <br />Tank Content: <br />Tank Age: <br />Other: <br />4. Type of Operation:_tn=7&, I - , —( <br />5. Release History: <br />Evidence of leaks / soil contamination: ❑ YES ❑ NO <br />Documented Groundwater contamination: ❑ YES ❑ NO <br />Background and description of any previous investigation or incidence: <br />6. Potential Health & Safety Physical Concerns: (✓ all that apply & describe) <br />❑ Heat or Cold Stress: °F (high ambient temp.) <br />❑ Noise Sources: <br />❑ Oxygen Deficiency: <br />❑ Excavation (falls, trips, slipping, cave-ins): <br />dandling and Transfer of a Hazardous Substance (fire, explosions, etc.): <br />❑ Confined space entry (explosions): <br />❑ Heavy equipment (physical injury & trauma resulting from moving <br />equipment): <br />❑ Other (specify): <br />Anticipated Biological Hazards: <br />❑ Snakes ❑ Insects ❑ Rodents ❑ Poisonous Plants <br />❑ Other/Unknown (specify): <br />8. Narrative (provide all information which could impact Health and Safety, <br />e.g., power lines, integrity of dikes, terrain, etc.): <br />EH 23081 (12/6/2010) <br />EVALUATION OF POTENTIAL HAZARDS <br />Chemicals Hazards <br />❑ Carcinogens:_ <br />❑ Corrosives: <br />❑ Dusts: <br />❑ Explosives: <br />❑ Flammables: <br />❑ Inorganic Gases: <br />❑ Metals: <br />❑Oxidizers: <br />❑ PCBs: <br />❑ other: <br />PART III <br />REQUIRED PERSONAL PROTECTIVE EQUIPMENT <br />I . Monitoring Equipment (Note: Monitoring instruments must be used for all <br />operations unless appropriate rationale or restrictions are provided): <br />❑ Combustible Gas/Oxygen Meter <br />❑ Detector Tubes (specify): <br />❑ Photo ionization Detector <br />❑ Organic Vapor Analyzer <br />❑ Other (specify): <br />❑ None (see below) <br />If monitoring instruments are not used, rationale or activity/area restrictions: <br />2. Personal Protective Equipment <br />Level of Protection: ❑ A ❑ B ❑ C ® D <br />® Hard Hat <br />® Safety Glasses/Goggles <br />® Steel toed/shank shoes or boots <br />❑ Flame retardant coveralls <br />® Hearing protection <br />❑ Tyvek <br />❑ Respirator: ❑ APR ❑ SCBA <br />A/P Cartridge: <br />® Safety vest <br />❑ Two-way communication <br />❑ Other (specify): <br />PART IV <br />PLAN APPROVAL <br />Plan Prepares(-� Date: <br />Plan Approved by: _ Qu Date: 1 ` <br />
The URL can be used to link to this page
Your browser does not support the video tag.