My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOAQUIN
>
640
>
2900 - Site Mitigation Program
>
PR0518459
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2018 4:16:23 PM
Creation date
12/6/2018 4:13:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0518459
PE
2950
FACILITY_ID
FA0013913
FACILITY_NAME
HERITAGE SQUARE
STREET_NUMBER
640
Direction
N
STREET_NAME
SAN JOAQUIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13916110
CURRENT_STATUS
01
SITE_LOCATION
640 N SAN JOAQUIN ST
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase 11 Environmental Site <br /> Assessment Work Plan <br /> Heritage Square <br /> Page 5 <br /> TABLE 2 Laboratory Analytical Methods <br /> CONSTITUENT METHOD DETECTION LIMIT <br /> Soil <br /> BTEX,MTBE 8020 5.0µg/kg <br /> TEP1i-K,D,M0 8015m 1.0 mg/kg(K,D) 10.0 mg/kg(MO) <br /> Groundwater <br /> BTEX.MTBE 8020 0.5 ug/1 <br /> TEPH-K,D,MO 8015m 5.0 gg/l(K,D)50.0µg/1(MO) <br /> 4.0 HEALTH AND SAFETY PLAN <br /> :Prior to commencement of fieldwork, a tailgate safety meeting will be held and a site-specific Health and <br /> Safety Plan will be discussed with, and presented to, all field personnel for their signatures. <br /> 5.0 REPORTING <br /> Condor will prepare a Report of Findings to be submitted to the Warwicks and Stockton Unified. The <br /> report will include a discussion of the field and laboratory procedures used to conduct the investigation, a <br /> discussion and presentation of the analytical results and subsurface lithology, and recommendations. <br /> 6.0 PROJECT SCHEDULE <br /> Upon approval of this Work Plan by the PHS/EHD and notification by the property owner to proceed, the <br /> field portion of the investigation can be completed within approximately one week. The turn-around time <br /> for laboratory analyses is approximately two weeks. A report can be submitted within two weeks of <br /> receipt of the laboratory analytical results. If you need additional information or have any questions, <br /> please call us at(209)234-0518. <br /> Respectfully submitted, <br /> CONDOR EARTH TECHNOLOGIES, INC. ®� <br /> Lee R Morse ' David K. Wood <br /> Staff Geologist California Registered Geologist 96532 <br /> Reviewed by: <br /> ivision Manager <br /> P:U572D.Heritrge Square Genprnbe%Fav Assessment Work Plan.doc <br /> CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.