My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2057
>
2200 - Hazardous Waste Program
>
PR0521728
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2021 2:17:40 PM
Creation date
12/7/2018 9:20:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0521728
PE
2220
FACILITY_ID
FA0003735
FACILITY_NAME
QUICK N EASY MART
STREET_NUMBER
2057
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16515309
CURRENT_STATUS
01
SITE_LOCATION
2057 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
pPp,urN � <br /> r. ENVIRO ENTAL HEALTH DOPARTMENT <br /> •C4�%FO-R a�P SAN JOAQUIN COUNTY Program Coordinators <br /> Donna K.Heran,R.E.H.S. <br /> Director 600 East Main Street, Stockton, California 95202 Kasey L. Foley, R.E.H.S. <br /> Telephone:(209)468-3420 Fax:(209)468-3433 Robert McClellon,R.E.H.S. <br /> Jeff Carruesco,R.E.H.S. <br /> Web:www.sjgov.org/ehd Linda Turkatte,R.E.H.S. <br /> SITE HEALTH& SAFETY PLAN <br /> PART I PART II <br /> GENERAL SITE INFORMATION EVALUATION OF POTENTIAL HAZARDS <br /> 1. Site Name: LC. I. Chemicals Hazards <br /> Address: -S • _ ElCarcinogens: <br /> Contact Pers n: ❑Corrosives: <br /> Phone#: 9) dt ❑Dusts: <br /> Proposed Date of investigation/inspection: I ❑Explosives: <br /> �4Flammables: 4C mi` lie <br /> 2. Description and brief narrative of inspection activity: ❑ Inorganic Gases: <br /> ❑New UST installation ❑UAR Investigation ❑Metals: <br /> ❑Tank Closure in Place ❑Tank/Pipe Repair ❑Oxidizers: <br /> ❑Tank/Pipe Removal ❑ Re-excavation ❑PCBs: <br /> ❑Sampling ❑Boring/Monitoring Well installation ❑Other: <br /> Hazardous Waste inspection ❑Tiered Permitting inspection <br /> PART III <br /> 3. Specific Site Information: REQUIRED PERSONAL PROTECTIVE EQUIPMENT <br /> Tank No.: Tank Capacity: 1. Monitoring Equipment(Note:Monitoring instruments must be used for all <br /> Tank Content: Tank Age: operations unless appropriate rationale or restrictions are provided): <br /> Other: ❑Combustible Gas/Oxygen Meter <br /> ❑ Detector Tubes(specify): <br /> 4. Type of Operation: Photo❑Photo ionization Detector <br /> ❑Gr;anic Vapor Analyzer <br /> 5. Release History: ❑Other(specify): <br /> Evidence of leaks/soil contamination: ❑YES ❑NO None(see below) <br /> Documented Groundwater contamination: ❑YES ❑NO If monitoring instruments are not used,rationale or activity/area restrictions: <br /> Background and description of any previous investigation or incidence: <br /> 2. Personal Protective Equipment <br /> 6. Potential Health&Safety Physical Concerns:(✓all that apply&describe) Level of Protection: ❑A ❑B ❑C ® D <br /> ❑Heat or Cold Stress: °F(high ambient temp.) ®Hard Hat <br /> ❑Noise Sources: ®Safety Glasses/Goggles <br /> ❑Oxygen Deficiency: ®Steel toed/shank shoes or boots <br /> Excavation(falls,trips,slipping,cave-ins): ❑Flame retardant coveralls <br /> andling and Transfer of a Hazardous Substance(fire,explosions,etc.): ®Hearing protection <br /> ❑Tyvek <br /> ❑Confined space entry(explosions): ❑ Respirator: ❑APR ❑SCBA <br /> Xeavy equipment(physical injury&trauma resulting from moving A/P Cartridge: <br /> uipment): Z Safety vest Q <br /> ❑Other(specify): Two-way communication ? V( '�-` <br /> ❑Other(specify): <br /> 7. Anticipated Biological Hazards: <br /> Snakes XInsects ❑Rodents ❑Poisonous Plants PART IV <br /> ❑Other/Unknown(specify): PLAN APPROVAL <br /> 8. Narrative(provide all information which could impact Health and Safety, Plan Prepared Date: <br /> e.g.,power lines,integrity of dikes,terrain,etc.): <br /> 5Q�2 <br /> Plan Approved by: Date: L <br /> EH 23081 (12/16/2011) <br />
The URL can be used to link to this page
Your browser does not support the video tag.