Laserfiche WebLink
San Joaquin County <br /> Environmental Health Department DIRECTOR <br /> �' Donna Heran, REHS <br /> r. 600 East Main Street <br /> v¢i < PROGRAM COORDINATORS <br /> Stockton, California 95202-3029 Robert McClellon, REHS <br /> Jeff Carruesco, REHS, RDI <br /> Kasey Foley,REHS <br /> Website: www. )468 3420 d Linda Turkatle, REHS <br /> Phone: (209)468-3420 <br /> Fax: (209) 464-0138 <br /> October 7, 2011 <br /> ATTN: BRIAN HOLTZ <br /> HT VISION CONSTRUCTION <br /> 3202 WEST MARCH LANE <br /> STOCKTON, CA 95219 <br /> RE PROPOSED: CAMEO CLUB CASINO-BAR ADDITION <br /> 552 WEST BENJAMIN HOLT DRIVE <br /> STOCKTON, CA 95207 <br /> Dear Mr. Holtz: <br /> This letter indicates San Joaquin County Environmental Health Department (EHD) approval of <br /> drawings submitted for the proposed CAMEO CLUB CASINO-BAR ADDITION, subject to the <br /> following condition(s): <br /> 1. The handwashing sink shall be separated from the ice bin by a metal splash guard. <br /> Splash guard shall be at least six (6) inches in height from back edge to front edge <br /> [CRFC § 113953]. <br /> The EHD must be kept informed of the construction progress. A final inspection must be <br /> performed, operating permit fees paid, and approval to operate granted prior to opening for <br /> business. All equipment must be installed and thorough cleaning completed prior to the final <br /> inspection. Inspections must be scheduled at least 48 hours in advance. Charges for <br /> additional inspections, re-inspections and/or consultations may be assessed at the EHD hourly <br /> rate of $125 per hour. <br /> Any item(s) inadvertently overlooked in the plan check process, which is not in compliance with <br /> applicable State laws, and/or city or county ordinance codes, shall be constructed or <br /> reconstructed upon request of the EHD. Inferior workmanship, equipment, or materials will not <br /> be accepted for the construction or operation of a food facility. Any variance from the <br /> requirements outlined in this letter will require written approval from the EHD. Approval of the <br /> submitted plans shall become null and void if the work authorized is not commenced within 180 <br /> days from the date of approval, or the work authorized by such plans is abandoned. <br />