My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BROADWAY
>
1905
>
2900 - Site Mitigation Program
>
PR0518600
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2018 10:53:10 AM
Creation date
12/7/2018 10:30:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0518600
PE
2960
FACILITY_ID
FA0013996
FACILITY_NAME
CROP PRODUCTION SERVICES
STREET_NUMBER
1905
Direction
N
STREET_NAME
BROADWAY
City
STOCKTON
Zip
95205
APN
14315004
CURRENT_STATUS
01
SITE_LOCATION
1905 N BROADWAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
626
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. W. T. Nickerson 0 - 2 - • 31 October 2000 <br /> discharge option are also the disposal options that are most readily implemented. Either of these <br /> disposal options will require acceptance of the purge water by the respective authorities. <br /> The Work Plan is approved subject to the condition that proof of acceptance of the purge water be <br /> conveyed to Board staff. <br /> Thank you for incorporating a pilot test of groundwater treatment into the aquifer testing element. This <br /> is the most economically efficient time to assess whether air stripping and/or carbon adsorption is <br /> effective with the constituents of concern at this site, and also provides the data necessary to evaluate <br /> longer term groundwater disposal options. <br /> A report of the results of the aquifer testing work plan is due by 19 January 2001, which is about 90 <br /> days after UNOCAL obtained an access agreement, as proposed in Sierra-Pacific Group's 30 March <br /> 2000 Schedule for Completion of Aquifer Testing letter. <br /> If y, have any `uestions you may contact me at(916) 255-3080. <br /> AMY TE LL <br /> Site Cleanup Unit <br /> enclosure <br /> cc: Mr. Michael Infuma, San Joaquin County Public Health Services (without encl.) <br /> Mr. Jan Wagoner,UNOCAL West Sacramento (without encl.) <br /> Mr. Anthony Giglio, Stockton(without encl.) <br /> Mr. Eric Chase, Sierra-Pacific Group, El Dorado Hills (with encl.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.