PLUMBING GENERAL NOTES SYMBOLS AND ABBREVIATIONS
<br /> DESCRIPTION ABBR. SYMBOL
<br /> 22. FURNISH AND INSTALL HOSE BIBBS AND/OR WALL HYDRANTS 24"ABOVE FINISHED GRADE/FLOOR(UNLESS OTHERWISE NOTED)AND PROVIDE VACUUM pp O
<br /> 1. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE CODES AND GOVERNING AUTHORITIES. I.E.:2013 CALIFORNIA PLUMBING CODE. BREAKERS. GREASE PIPE BELOW GRADE GRS
<br /> --CRS- - 4_4 M ,�
<br /> 2. ALL SANITARY PIPING 2-112"OR LESS SHALL HAVE A 114"PER FOOT SLOPE.ALL SANITARY PIPING 3"OR LARGER SHALL HAVE A 118" PER FOOT SLOPE UNLESS 23, SEE ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS OF ROOF DRAINS,PLUMBING FIXTURE MOUNTING HEIGHTS AND DIMENSIONS, SANITARY PIPE BELOW GRADE SAN - -SAN- -
<br /> OTHERWISE NOTED ALL STORM WATER PIPING 2-112"OR LESS SHALL HAVE A 114"PER FOOT MINIMUM HORIZONTAL SLOPE.ALL STORM WATER PIPING 3" RAINWATER LEADER RWL RWL
<br /> OR LARGER
<br /> SHALL HAVE A 118"PER FOOT MINIMUM HORIZONTAL SLOPE UNLESS OTHERWISE INDICATED 24, CONTRACTOR SHALL VERIFY INVERT ELEVATIONS OF EXISTING SEWERS IN WHICH NEW SEWER LINES ARE TO BE CONNECTED PRIOR TO INSTALLATION.
<br /> � �
<br /> RAINWATER LEADER OVERFLOW RWLO RWLO o
<br /> 3. VALVES AND FITTINGS SHALL BE OF SAME SIZE OF PIPE ON WHICH THEY ARE LOCATED, UNLESS OTHERWISE INDICATED ON DRAWINGS. 25. CONTRACTOR SHALL INSTALL DIELECTRIC UNIONS AT CONNECTIONS OF DISSIMILAR METALS, STORM WATER BELOW ST - -ST- - �"
<br /> 4. INSTALL-WATER HAMMER SHOCK ARRESTORS AT EACH FIXTURE OR BATTERY OF FIXTURES WHERE REQUIRED,ARRESTORS SHALL BE FACTORY FABRICATED. 26. CONTRACTOR SHALL ROUGH-IN ALL WASTE AND SUPPLIES TO SPECIAL EQUIPMENT ACCORDING TO MANUFACTURER'S SHOP DRAWINGS AND MAKE FINAL FILTERED WATER FW FW
<br /> INSTALL ARRESTORS AND SIZE PER PLUMBING AND DRAINAGE INSTITUTE STANDARD P.Q.I.WH-201.ACCEPTABLE MANUFACTURERS JOSAM,WATTS AND SIOUX CONNECTIONS AS NOTED,ALL SUPPLIES SHALL BE VALVED. INSTALL VACUUM BREAKERS WHERE REQUIRED BY CODE. *- a
<br /> SOFT WATER SW SW
<br /> CHIEF.AIR CHAMBERS SMALL NOT BE CONS€DERED AN EQUAL TO WATER ARRESTORS AS SPECIFIED.
<br /> 27. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS(INCLUDING PIPE ROUTING AND EQUIPMENT LOCATIONS)TO ARCH ITECTIENGINEER FOR REVIEW PRIOR TO COLD WATER PIPE CW -
<br /> 5. CONTRACTOR!S RESPONSIBLE FOR MAINTAINING FIRE RATING AND WEATHERPROOFING INTEGRITY OF ALL PIPE PENETRATIONS. THE INSTALLATION OR PURCHASING OF ANY PIPING AND/OR EQUIPMENT.
<br /> HOT WATER PIPE(110-F) HW 110° F
<br /> 6. ALL WATER SUPPLY AND SANITARY LINES SHALL RUN AS CLOSE TO PLANS AS POSSIBLE WITH NO CHANGES IN SIZING. 28. PROVIDE REDUCED PRESSURE BACKFLOW PREVENTERS FOR DOMESTIC WATER SUPPLY CONNECTIONS AS REQUIRED BY CODE.
<br /> HOT WATER PIPE(140°F) HW 140° F
<br /> 7. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL NECESSARY SUPPORTING DEVICES FOR FIXTURES 29, ALL BELOW GRADEISLAB COPPER PIPE SHALL BE PLACED WITHIN COPPER PIPE SLEEVE(10 MIL)POLYETHYLENE PLASTIC SLEEVING. EXTEND SLEEVINGHOT WATER RETURN HWR --- 0
<br /> ABOVE GRADEISLAB. $:1 Q
<br /> 8. CHANGES IN THE DIRECTION OF SANITARY AND STORM DRAINAGE PIPING SHALL NOT BE MADE WITH FITTINGS WHICH WELL CAUSE EXCESSIVE REDUCTION IN THE CONDENSATE PIPE C C a
<br /> VELOCITY OF FLOW OR CREATE ANY OTHER ADVERSE EFFECT. I.E.: USE OF SANITARY TEE IN A HORIZONTAL CONNECTION, USE OF A DOUBLE SANITARY TEE INA 30. CONTRACTOR SHALL REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS OF FLOOR DRAINS(IF ANY)LOCATED WITHIN TOILET ROOMS. VENT PIPE V
<br /> LU
<br /> VERTICAL STACK, USE OF SHORT RADIUS FITTINGS FOR BRANCH TO HOUSE DRAIN/OR STACK CONNECTION. �\
<br /> 31. PRESSURE REDUCING VALVES SHALL BE INSTALLED ON BRANCH LINES SERVING FIXTURES AND/OR EQUIPMENT WHEN THE PRESSURE IN THE LINE EXCEEDS CLEANOUT CO
<br /> 9, CONTRACTOR SHALL GIVE 24 HOURS NOTICE TO APPLICABLE UTILITY COMPANY PRIOR TO PERFORMING WORK INVOLVING UTILITIES. 80 P.S.I. ,
<br /> EXTERIOR CLEANOUT ECO �+ _
<br /> 10 WHERE SANITARY SEWER LINES CROSS UNDERGROUND WATER SUPPLY LINES THE INSTALLATION SHALL COMPLY WITH THE 2013 CALIFORNIA PLUMBING CODE. 32. ROUTE WATER LINES TIGHT TO STRUCTURE COORDINATE ROUTING TO AVOID CONFLICTS WITH OTHER DISCIPLINES. '~ CL
<br /> 11 ALL FLOOR DRAINS SHALL BE PROVIDED WITH A TRAP PRIMER VALVE AND FITTINGS UNLESS NOTED OTHERWISE. FLOOR CLEANOUT FCO n - .
<br /> 33. IF THE INTENT OF THE DRAWINGS AND/OR SPECIFICATIONS IS UNCLEAR OR HAS MORE THAN ONE INTERPRETATION, IT SHALT,BE BROUGHT TO THE
<br /> 12. THE PLUMBING CONTRACTOR MAY BE REQUIRED TO DROP PIPE OUTSIDE OF BUILDING TO REQUIRED DEPTH TO PROVIDE CONNECTION TO AREA DEVELOPMENT ATTENTION OF THE ARCH ITECTIENGiNEER IN WRITING BEFORE THE SUBMISSION OF BIDS.THE ARCH ITECTIENGINEER SHALL MAKE CORRECTIONS AND/OR VENT THRU ROOF VTR i V ❑
<br /> UTILITY STUB.ALL DROPS IN DEPTH SHALL BE MADE WITH THE USE OF 45°FITTINGS. PROVIDE EXPLANATION IN WRITING -1 Q
<br /> .
<br /> DIRECTION OF FLOW U
<br /> 13. ROUTE ALL PIPING CONCEALED ABOVE CEILINGS,WITHIN WALLS,OR IN CHASES. EXPOSED PIPING SHALL BE SLOPED AND PAINTED TO MATCH ARCHITECTURAL 34 PLANS AND SPECIFICATIONS ARE INTENDED AS A GENERAL DESCRIPTION OF THE WORK TO BE PERFORMED.ALL ITEMS NOT SPECIFICALLY MENTIONED OR CAP C
<br /> FINISHES. PIPING IN MECHANICAL ROOMS MAY BE EXPOSED. SHOWN, BUT NECESSARY FOR THE COMPLETION OF THE INSTALLATION, SHALL BE FURNISHED AND INSTALLED BY THIS CONTRACTOR THE CONTRACTOR U
<br /> SHALL ACQUAINT HIMSELF WITH THE MECHANICAL,ARCHITECTURAL,STRUCTURAL AND ELECTRICAL PLANS PRIOR TO SUBMITTING HIS FINAL BID. NO TEE UP
<br /> 14. SLEEVE AND FERE STOP PENETRATIONS OF RATED WALLS,FLOORS, CEILINGS,ETC., IN ACCORDANCE WITH THE 2013 CALIFORNIA PLUMBING CODE AND LOCAL ADDITIONAL COMPENSATION WILL BE ALLOWED DUE TO CONTRACTORS FAILURE TO FAMILIARIZE HIMSELF WITH THE PLANS.
<br /> CODES TO MAINTAIN RATINGS.REFER TO ARCHITECTURAL DRAWINGS FOR APPLICABLE UL STANDARDS AND LOCATIONS OF RATED WALLS, CEILINGS, FLOORS, ETC TEE DOWN
<br /> 35. THE CONTRACTOR SHALL BASE HIS PROPOSAL UPON THE EQUIPMENT AS SCHEDULED OR SPECIFIED, USING THE MANUFACTURERS AND EQUIPMENT
<br /> 15, ALL WATER PIPING INSTALLED IN EXTERIOR WALLS SHALL BE PLACED ON THE INTERIOR SIDE OF THE WALL.7HE WALL INSULATION SHALL BE PLACED ON THE SPECIFIED ON THE DRAWINGS. IF MORE THAN ONE MANUFACTURER IS SPECIFIED FOR ONE ITEM,ANY ONE OF THE MANUFACTURERS LISTED MAY BE USED ELBOW UP 0 -
<br /> EXTERIOR SIDE OF THE PIPE. IN THIS CONTRACTOR'S PROPOSAL IF THIS CONTRACTOR WISHES TO USE EQUIPMENT NOT SPECIFIED, HE MUST AT THE TIME OF BIDDING SUBMIT
<br /> SEPARATELY ON LETTERHEAD STATIONARY OF THE BIDDER,THE EQUIPMENT HE WOULD SUBSTITUTE AND THE COST TO BE ADDED OR TO BE DEDUCTED ELBOW DOWN G
<br /> 16. SEE RISER DIAGRAMS FOR BRANCH PIPING DETAILS AND SIZES NOT SHOWN ON PLANS. FROM HIS PROPOSAL. Q 3
<br /> REVISION REFERENCE -
<br /> 17. COLD AND HOT WATER PIPING SHALL BE COPPER WATER TUBE(ASTM B88)TYPE"L"WITH WROUGHT-COPPER(ASME B16.22),OR COPPER ALLOY(ASME B16.18) 36. THE CONTRACTOR IS EXPECTED TO ORDER ALL MATERIALS IN SUFFICIENT TIME TO AVOID DELAYING THE COMPLETION OF THE PROJECT. DELAY IN NEW CONNECTION TO EXISTING
<br /> FITTINGS AND 95TA LEAD-FREE SOLDER JOINTS(ASTM B32),DISINFECT WATER PIPING AFTER PRESSURE TEST. DISINFECTION PROCEDURE SHALL COMPLY WITH DELIVERY WILL NOT BE CONSIDERED A JUSTIFIABLE REASON FOR SUBMISSION OF SUBSTITUTE MATERIALS.
<br /> THE LOCAL HEALTH AUTHORITY,LOCAL WATER PURVEYOR,2013 CALIFORNIA PLUMBING CODE DISINFECTION OF POTABLE WATER SYSTEMS. IT
<br /> 37 DO NOT PENETRATE WALL FOOTINGS WITH PIPING,COORDINATE PENETRATION LOCATION WITH GENERAL CONTRACTOR. PIPE PENETRATING A BEARING GAS COCK
<br /> 18, SOIL,WASTE,VENT PIPING AND FITTINGS SHALL BE PVC:ASTM D2665 SCHEDULE 40.JOINTS SHALL BE SOLVENT CEMENT. PROVIDE CAST IRON PIPE AND FITTINGS WALL OR FOOTING MUST BE SLEEVED AND LOCATION APPROVED BY STRUCTURAL ENGINEER.
<br /> FOR SOIL,WASTE AND VENT PIPING LOCATED IN CEILING PLENUMS. SOLENOID SHUT OFF VALVE Q rn .
<br /> 38. REFER TO PLANS FOR VENT THRU ROOF(VTR)PIPE SIZES AND LOCATIONS, LOCATE VTR A MIN. 10'HORIZONTAL FROM ANY BUILDING OPENING OR FRESH CHECK VALVE N N
<br /> 19. PROVIDE CLEANOUTS FOR SANITARY AND STORM PIPING AT BASE OF EACH VERTICAL STACK,AT EACH CHANGE OF DIRECTION OF HORIZONTAL PIPE RUNS AND AT AIR INTAKE.EXTEND VTR 12"ABOVE ROOF SURFACE. IF 10'DISTANCE CANNOT BE ACHIEVED LOCATE VTR Z ABOVE ADJACENT TOP OF FRESH AIR INTAKE OR t � CO
<br /> 100 FOOT INTERVALS OF HORIZONTAL RUNS FOR SANITARY AND STORM PIPING. BUILDING OPENINGS PROVIDE 1"FIBERGLASS INSULATION WITH ALL-SERVECE JACKET ON VENT PIPE INSIDE BUILDING WITHIN 6'OF VTR LOCATION.VERIFY FLOOR DRAIN �C - Q �
<br /> FLASHING AND COUNTERFLASHING AND COORDINATE INSTALLATION WITH ROOFING CONTRACTOR.
<br /> LU
<br /> 20, PROVIDE ACCESS PANELS TO VALVES WITHIN CHASES OR ABOVE NON-ACCESSIBLE CEILINGS. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING TYPES. FLOOR SINK
<br /> 39, COORDINATION' CONTRACTOR SHALL COORDINATE ITS CONSTRUCTION OPERATIONS WITH THOSE OF OTHER CONTRACTORS AND ENTITIES TO ENSURE Q �p C)
<br /> 21. SITE UTILITY CONNECTIONS SHOWN ON CIVIL DRAWINGS.ALL SERVICES SHOWN ON THIS SET OF PLANS TERMINATE 5-0"FROM BUILDING, UNLESS SHOWN EFFICIENT AND ORDERLY INSTALLATION OF EACH PART OF THE WORK.CONTRACTOR SHALL COORDINATE ITS OPERATIONS WITH OTHER CONTRACTORS SHUT-OFF VALVE --;�4-- -
<br /> OTHERWISE ON DRAWINGS. OPERATIONS,THAT DEPEND ON EACH OTHER FOR PROPER INSTALLATION,CONNECTION AND OPERATION. 75
<br /> s w 0O
<br /> w �..�..� �p Z
<br /> :�E Ll._ F-- ¢
<br /> *SOME SYMBOLS SHOWN MAY NOT PERTAIN TO THIS PROJECT a to
<br /> - z
<br /> ruJ
<br /> o W rn a7 J
<br /> V!
<br /> U +�
<br /> 2014 SUBMITTALS AND SUBSTITUTIONS FIXTURE SPECIFICATIONS SEISMIC RESTRAINT NOTE v
<br /> ALL PLUMBING EQUIPMENT AND HVAC EQUIPMENT SHALL BE SECURED 4
<br /> 1. CONTRACTOR SHALL SUBMIT THE ITEMS LISTED IN THE PLUMBING FIXTURE SCHEDULE FOR REVIEW PRIOR TO ORDERING AND PIPE SIZE TO STRUCTURE PER ASHRAE"GUIDELINES FOR SEISMIC RESTRAINTS"
<br /> INSTALLATION. TAG FIXTURE MANUFACTURER MODEL# DESCRIPTION OF MECHANICAL SYSTEMS AND PLUMBING PIPING SYSTEMS E
<br /> CW HW SAN VENT CONTRACTOR TO FOLLOW STATE CODE REQUIREMENTS FOR SEISMIC 0
<br /> 2. PROCESSING TIME:ALLOW 1.0 WORKING DAYS FOR REVIEW OF EACH SUBMITTAL.ALLOW ADDITIONAL TME IF COORDINATION WITH
<br /> 12"X 12"X 6"DEEP,CAST IRON BODY WITH WHITE ACID RESISTING PORCELAIN ENAMEL INTERIOR,ALUMINUM RESTRAINTS AND/OR LATEST SMACNA GUIDELINES WHERE APPLICABLE. N ([5
<br /> SUBSEQUENT SUBMITTALS 15 REQUIRED. ENGINEER WILL ADVISE CONTRACTOR WHEN A SUBMITTAL BEING PROCESSED MUST BE FS-1 FLOOR SINK JONESPEC FD-2375-NH2 3" 2" ANTI-SPLASH INTERIOR BOTTOM DOME STRAfNER AND NICKEL BRONZE TOP. FURNISH WITH SPLIT HALF-GRATE, ISOLATE ALL EQUIPMENT FROM STRUCTURE WITH APPROVED TYPE
<br /> DELAYED FOR COORDINATION. DOUBLE FLANGES AND WEEP HOLES. VIBRATION ISOLATOR MOUNTS. -
<br /> 3. SUBMITTALS:PLACE A PERMANENT LABEL OR TITLE BLOCK ON EACH SUBMITTAL ITEM FOR IDENTIFICATION. INDICATE NAME OF FIRM CAST IRON BODY WITH POLISHED NICKEL BRONZE TOP, NON-SKID DIAMOND TREAD SET FLUSH WITH THE FLOOR. L 0
<br /> OR ENTITY THAT PREPARED EACH SUBMITTAL ON LABEL OR TITLE BLOCK. PROVIDE A SPACE BESIDE TITLE BLOCK TO RECORD FCO FLOOR CLEANOUT JR SMITH 4023 4" PROVIDE FLASHING FLANGE WHEN USED WITH WATERPROOFING. z
<br /> CONTRACTOR'S REVIEWAND APPROVAL MARKINGS AND ACTION TAKEN BY ENGINEER, INCLUDE THE FOLLOWING
<br /> INFORMATION FOR PROCESSING AND RECORDING ACTION TAKEN: 20 DFU, SURE-VENT AIR ADMITTANCE VALVE WITH 1-'/,"X 2"PVC SCHEDULE 40 ADAPTER, INSTALL PER COORDINATION NOTE - 0
<br /> A. PROJECT NAME. AAV AIR ADMITTANCE OATEY 39016 MANUFACTURERS REQUIREMENTS. CONTRACTOR TO REFER TO"LOAD KING'KIOSK DESIGN DRAWINGS
<br /> B. DATE. VALVE INCLUDED WITHIN THIS SET OF DOCUMENTS FOR ADDITIONAL CONTRACT (3)
<br /> C, NAME OF ENGINEER. SCOPE REQUIREMENTS.
<br /> D. NAME OF CONTRACTOR. ELECTRIC WATER 19GAL.ASME RATED GLASS LINED STEEL TANK,ANODE ROD AND FOAM INSULATION BETWEEN OUTER STEEL o U� LU �
<br /> E. NAME OF SUBCONTRACTOR. WH-1 HEATER BRADFORD WHITE L 120L3 3 3/4" JACKET. INCOLOY SHEATHED IMMERSION TYPE HEATING ELEMENTS, (2)5.0 KW,208V,3PH.,SET OUTLET TEMP. E r n
<br /> F. NAME OF SUPPLIER. ACCORDING TO STARBUCKS REQUIREMENT, c U U) V
<br /> G. NAME OF MANUFACTURER,
<br /> H. DRAWING NUMBER AND DETAIL REFERENCES,AS APPROPRIATE. NOTE:
<br /> PLUMBING SCOPE O _ co
<br /> i. LOCATION WHERE PRODUCT IS TO BE INSTALLED,AS APPROPRIATE.
<br /> F WORK: m
<br /> 1 HOT WATER AND DRAIN PIPES EXPOSED UNDER SINKS SHALL BE INSULATED OR OTHERWISE CONFIGURED SO AS TO PROTECT AGAINST CONTACT j Q
<br /> 4. SUBMIT ELECTRONIC SUBMITTALS VIA EMAIL AS PDF ELECTRONIC FILES. THERE SHALL BE NO SHARP OR ABRASIVE SURFACES UNDER SINKS.
<br /> • HAVE STUB-UPS AND DRAINS COMPLETED PRIOR TO ARRIVAL OF KIOSK AND ¢ w U w
<br /> 2. FAUCET CONTROLS AND OPERATING MECHANISMS SHALL BE OPERABLE WITH ONE HAND AND SHALL NOT REQUIRE TIGHT GRASPING,PINCHING OR CORRECTLY LOCATED PER DRAWING LAYOUT z 0
<br /> r U¢
<br /> 5. PAPER SUBMITTALS:SUBMIT THREE PAPER COPIES OF EACH SUBMITTAL UNLESS OTHER WISE INDICATED.ENGINEER WILL TWISTING OF THE WRIST.THE FORCE REQUIRED TO ACTIVATE CONTROLS SHALL NOT BE GREATER THAN 5 LB. FT. • RUN WATER SUPPLY LINES THROUGHOUT KIOSK PER THE DRAWING LAYOUT. - Uj
<br /> RETURN TWO COPIES.
<br /> 3. CONTROLS FOR SERVICE WATER HEATING SYSTEMS SHALL LIMIT THE OUTLET TEMPERATURE AT PUBLIC LAVATORIES TO 110°F. (TITLE 24, PART 6, • AFTER THE ROIFILTRATION SYSTEM HAS BEEN INSTALLED THE PLUMBER WILL 0 CI� ° w
<br /> CHAPTER 2, SECTION 113).THE WATER HEATER THERMOSTAT MAY NOT BE USED FOR COMPLIANCE WITH THIS CODE SECTION (CPC 421.2 ENERGY NEED TO RUN WATER LINES TO THE EQUIPMENT THAT REQUIRES ROIFILTERED U)
<br /> 6. COLLECT SUBMITTAL DATE INFORMATION INTO A SINGLE SUBMITTAL FOR EACH.ELEMENT OF CONSTRUCTION AND TYPE OF STANDARDS 110(C)3. WATER PER THE DRAWINGS.A DRAIN LINE WILL NEED TO BE MADE AVAILABLE E
<br /> PRODUCT OR EQUIPMENT. MARK EACH COPY OF EACH SUBMITTAL TO SHOW WHICH PRODUCTS AND OPTIONS ARE APPLICABLE, 4. PLUMBkNG FIXTURES ARE FOR REFERENCE ONLY. SELECTION OF PLUMBING FIXTURES WITH REGARD TO MANUFACTURER,TYPE AND MODEL SHALL FOR THE ESPRESSO MACH{NE. LOAD KING WILL COORDINATE WITH BUNN THE
<br /> BE SUBJECT TO ARCH APPROVAL. INSTALLATION OF THE ESPRESSO MACHINE.THE BUNN TECH WILL ATTACH
<br /> INCLUDE THE FOLLOWING INFORMATION,AS APPLICABLE: o
<br /> A.MANUFACTURER'S CATALOG CUTS. 5. WATER HEATER PROVIDED BY SAFEWAY AND INSTALLED BY CONTRACTOR, COORDINATE CAPACITY,LOCATION AND ELECTRICAL REQUIREMENTS THE WATER LINE TO THE MASTRENA THAT THE PLUMBER MADE AVAILABLE
<br /> WITH"LOAD KING"DESIGN DOCUMENTS FOUND WITHIN THIS SET. AND TEST.
<br /> B. MANUFACTURER'S PRODUCT SPECIFICATIONS. •
<br /> C, STATEMENT OF COMPLIANCE WITH SPECIFIED REFERENCED STANDARDS. INSTALL FAUCET FOR UTILITY SINK,METERING FAUCET, /NST-HOT AND 12"
<br /> D.NOTATION OF COORDINATION REQUIREMENTS, COLD WATER GLASS FILLER AT BLENDER RINSE SINK. m `�
<br /> E.WIRING DIAGRAMS SHOWING FACTORY-INSTALLED WIRING. • COMPLETE DRAIN LINES FOR SINKS, DROP-IN ICE BIN, ICE MACHINE AND
<br /> CNI
<br /> MASTRENA(ESPRESSO MACHINE). _ o
<br /> F. PRINTED PERFORMANCE CURVES. • CONTRACTOR TO INSTALL ALL PLUMBING LINES AND CONDUIT AT LEAST SIX
<br /> G.OPERATIONAL RANGE DIAGRAMS.
<br /> H.CLEARANCES REQUIRED TO OTHER CONSTRUCTION, IF NOT INDICATED ON ACCOMPANYING SHOP DRAWINGS. INCHES OFF FLOOR AND 112"AWAY FROM ANY WALLS.WHERE REQUIREMENT
<br /> IS NOT POSSIBLE, PIPING AND CONDUIT SHALL BE FURRED IN OR ENCASED IN
<br /> CLEANOUT AND ACCESS DRAIN FROM 9
<br /> 7. CONTRACTOR SHALL REVIEW EACH SUBMITTAL AND CHECK FOR COORDINATION WITH OTHER WORK OF THE CONTRACT AND FOR COVER.TOP OF COVER TO FIXTURE AN APPROVED SEALED ENCLOSURE.
<br /> COMPLIANCE WITH THE CONTRACT DOCUMENTS. NOTE CORRECTIONS AND FIELD DIMENSIONS. MARK WITH APPROVAL STAMP BE FLUSH WITOP OF FLOOR FLOOR SINK K
<br /> BEFORE SUBMITTING TO ENGINEER. APPROVAL STAMP:STAMP SHALL STATE THAT SUBMITTAL HAS BEEN REVIEWED,CHECKED, FLOOR SINK TO BE
<br /> AND APPROVED FOR COMPLIANCE WITH THE CONTRACT DOCUMENTS AND INITIALED AND DATED BY CONTRACTOR, FLOOR LINE RAISED 2 INCHES
<br /> I ABOVE FLOOR AND DRAWING INDEX
<br /> MAKE MARKS TO INDICATE CORRECTIONS OR REVISIONS REQUIRED,AND RETURN IT. M M GROUTED LEVEL.
<br /> 8. ENGINEER WILL REVIEW EACH SUBMITTAL, E ,
<br /> ENGINEER WILL STAMP EACH SUBMITTAL WITH AN ACTION STAMP AND WILL MARK STAMP APPROPRIATELY TO INDICATE ACTION. rrm. . rrE 2 6 I SHEET TITLE
<br /> •- �.a.-�A.-.- - wwe.e.e.e.-..mm.__ =
<br /> 9. ENGINEER WILL NOT REVIEW SUBMITTALS THAT DO NOT BEAR CONTRACTOR'S APPROVAL STAMP AND INITIALS AND WILL RETURN - - PO Plumbing General Information N
<br /> THEM WITHOUT ACTION. INCOMPLETE SUBMITTALS ARE UNACCEPTABLE,WILL BE CONSIDERED NONRESPONSIVE,AND WILL BE �118"C.I. BEND P1 Sanitary,Waste and Domestic Water Plans
<br /> RETURNED FOR RESUBMITTAL WITHOUT REVIEW. SUBMITTALS NOT REQUIRED BY THE CONTRACT DOCUMENTS MAY NOT BE c
<br /> REVIEWED AND MAY BE.DISCARDED P2 Load King Package
<br /> 10, SUBSTITUTIONS BALANCE OF PIPING SAME ___.......N•...-.-.-.-.-_-_ ________. P3 Load King Package
<br /> A. SUBSTITUTION OFFERS OWNER A SUBSTANTIAL ADVANTAGE IN COST,TIME,ENERGY CONSERVATION,OR OTHER AS CLEANOUT TO GRADE P4 Load King Package
<br /> w
<br /> CONSIDERATIONS. 3"WASTE PIPE u,
<br /> B.SUBSTITUTION DOES NOT REQUIRE EXTENSIVE REVISIONS TO THE CONTRACT DOCUMENTS, CONTRACTOR SHALLC0MINIMUM)
<br /> COMPENSATE ENGINEER FOR ANY REDESIGN AND EVALUATION SERVICES INCLUDING CHANGES REQUIRED BY �
<br /> (
<br /> o �
<br /> AUTHORITY HAVING JURISDICTION. o
<br /> C.SUBSTITUTION WILL NOT ADVERSELY AFFECT CONSTRUCTION SCHEDULE.
<br /> D.SUBSTITUTION HAS RECEIVED NECESSARY APPROVALS OF AUTHORITIES HAVING JURISDICTION.
<br /> i?
<br /> E. SUBSTITUTION HAS BEEN COORDINATED WITH OTHER PORTIONS OF THE WORK.
<br /> F.SUBSTITUTION PROVIDES SPECIFIED WARRANTY.
<br /> G. SUBSTITUTION HAS BEEN COORDINATED WITH OTHER PORTIONS OF THE a WORK,AND IS ACCEPTABLE TO ALL �
<br /> GONTRAGTQRSlNV°LVED. Floor Cleanout Detail Typical Floor Sink Detail a
<br /> H.CONTRACTOR SHALL ASSUME ANY ADDITIONAL CONSTRUCTION COSTS AS A RESULT OF THE SUBSTITUTION. 1
<br /> 2 `�
<br /> Scale:None Scale: None o � w o � a
<br /> 0 r ¢ w
<br /> o p 0 U
<br /> PO
<br /> �.
<br />
|