Laserfiche WebLink
1 1.8 2 3 3.2 3.4 3.6 4 4.2 Tir <br /> 5.9 6 7 7.8 8 8.5 9 9.2 9.9 10 11 <br /> x x <br /> I I <br /> I I <br /> TM <br /> G _ � ❑ � I I ❑ SAFEWAY <br /> EXISTING <br /> STAMP <br /> PRODUCE iB21D <br /> PREP EXISTING EXISTING <br /> w I I MEAT CUT & I I FISH <br /> B21 WRAP ROOM 626 I COOLER A18B <br /> o I <br /> - 0700 - - - - - - - o - EXISTING <br /> EXISTING EXISTING MEAT '718 <br /> w <br /> PRODUCE J (E) I I I GROCERY I COOLER �A A I I w A18B v a <br /> I <br /> COOLER B21D B21D J I (E) J�(E) J (E) FREEZER A16 0 w 0 w I () w �a4 '� � I <br /> w B25 625 EXISTING B25 A16 &(E) <br /> A16 A18A A18A A18A 0 - B26 0 U, 826 o 626 0 � O � <br /> B21 DAIRY B25 (E) I J ( ) J (E) J (E) J ( ) J / G B-5 B22C B-6 (�22C1 `�� <br /> I COOLER IJ I Bz6 I I ate% O <br /> D-12 D-1 D-2 D-3 � N DELI-6 DELI-7 " �� DELI-8 - N " - - (N) - (N) � S-1 i� B-1 -�� B-2 g-3 <br /> B22D B21 B B21 B 821 B 'IT E(N) 621A Ts( ) R(N) Ts( ) 821 Ts (N) TS( ) R") A19 TS( ) TS TS O � SM-1 SF-1 (N) / , � <br /> _O O O O O ® ❑ ( A ®B21 E �( Q ® Q A19Ag Q 11®IA19A, r, A19D A19D E(N) TS R� M (8226 B22B B22B � J <br /> (E) (E) (E) (E) B21A (N) 18'-1" (N) (N) N Al 9A (N) (N) (N) (E) (E) A19E (N) Al 9E (E) (E) (E) C . LLJ <br /> A19A 8'-0 9 1 00 <br /> I 13'-5" I op O <br /> R29 R29 m N <br /> R29 <br /> LIJ <br /> (E) A10 A10 Al2 Al2 �1 o\A1 wCD <br /> ------- Q 827 DI-9 m w -------------------------------------------- -------- Z <br /> A10 Al2 `� A14 l - <br /> O' �1 N DI-10 B27 o DT-1 DT-2 DT-3 ¢ w p DT-9 DT-10 DT-11 ¢ Iw ~p DT-17 __i- - - DT-18 DT_19 �Q w I N <br /> o w - -- - - - - - - -- - w - - - - - - - -- - - - w - - - - <br /> `- - - O DT-7 DT-6 DT-5 �- �M- DT-15 DT-14 DT-13 � �- �� DT-23 DT-22 DT-21 0 �" (f) <br /> R28 (E) Q A15 <br /> ----- ----------- ----- J 0 <br /> R28 (A (E) (E) A11 (E) A13/ (E) (E) A13 (E) (All5 (E) (E) CA"I5j(E) <br /> �� � <br /> I <br /> B24A (E) (E) (E) (E) (E) <br /> (R) Al A6 A2 A20A DELI-1 A20 DELI-2 <br /> R) T E(R> B24A IC-1 f$F-11 FF-1 <br /> °° (R) P-1 I I �� I <br /> 2'-10" <br /> N EXISTING Azoc <br /> N ¢ c Q J Q SERVICE DELI ���� 6'-4" <br /> m w FREEZER A17A w A17A w O <br /> _ O <br /> o z Z 00 <br /> I w I EXISTING I - Z� N 9'-5" � �Q <br /> - - <br /> R29 Q LL Q LL SERVICE DELI Q ? 7'-6" N o W <br /> 2'-s° w J_ LL COOLER <br /> � A20C U w A20T <br /> N A20D <br /> m @248 m m U ¢ <br /> N m A6 M N z_ ❑• w <br /> ILL <br /> IU_ I I z <br /> z ZQ ® J <br /> W � <br /> o Y - � z N <br /> z R29 0 _ O � w cv ~ .� o - 0 <br /> Qw} \ � � Z � W <br /> CL B236 �° °❑�d D U N Ir <br /> N <br /> VF -� M I - O� I I I 000 <br /> m N L? U <br /> ILLW <br /> m SC Z 10 m W W LL A2 w z W <br /> Z w w FF-4 E NOTE: <br /> m RCC TO FIELD VERIFY ALL E U) U) <br /> m (N) m I _ O I DRAINS. PROVIDE ALL LA80R I p 9'-6" O <br /> Z m p O J_ NEW DRAINS AS REQUIRED w 6-11 N - <br /> ¢ w AND MATERIALS TO INSTALL c/) O <br /> O z N UNDER (N)OR(R)CASES. Lu 5'-8" i� <br /> ¢ U � � 00 m <br /> I I(N7) CV <br /> m w A20D E(N) • A20F <br /> a L? Z I I NOTE: I w DI�Nm <br /> Q w w w O ALL UNUSED REFRIGERATION <br /> �m 17'-5" v ¢ PIPING, CASES, COILS, HANGERS, <br /> NZ Ts(")D1_6 EXISTING <br /> 16' i ®m SUPPORTS, CONDENSERS, <br /> `" REFRIG. RACKS AND ANY N BAKERY <br /> ASSOCIATED REFRIGERATION A20F (N) COOLER 2OM s <br /> Z m o Q;; li � EQUIPMENT NOT USED AFTER <br /> O_! LL THE REMODEL IS THE L <br /> RESPONSIBILITY OF THE RC TO Lm <br /> Q ® M a l N U ti w M I �� DISCONNECT AND REMOVE. I k-a m <br /> - - - - - - - 14-6 <br /> a URN <br /> � w w NOTE: <br /> EXISTING <br /> w w o CONTROL VALVES ALL LEAK ON & <br /> Amt) <br /> Z li EQUIPMENT SHOWN ON 9 8 Q o FREEZER <br /> v A17B w �UO w I R2.1 & R7.2. I I 9' ISSUE&REVISIONS <br /> R13 - 00 m =O N NO. DATE: DESA <br /> \� - <br /> Z F z (TYP) 632 m o a LL w ® w <br /> t `�' o ¢ LL R09 <br /> i A17B ❑ <br /> ® a m U ¢ Q UNDER SLAB �� U �V �� 14'-0" (TYP) <br /> O O REFRIGERATION PIPE 12'-2" U� A30 <br /> I I TRENCHING SHOWN ON I I <br /> ow w R2.1 ILL �V 1ir� �, a� <br /> co <br /> m o A20L b 2� <br /> z m Q N �� � ��n/ -1 ( (_ Ln <br /> co CO <br /> i <br /> i <br /> O <br /> O SC P-7 B24C LL Q I I A20G o A20N o c_ <br /> O O w O R28 _ R28 <br /> U Q o O- / 17' 7 <br /> CL (N) (E J_ EXISTING A201 _� ��oo <br /> LL CHINA <br /> � 9'-0., � w w A20J A20J A20H 0 � �o <br /> COOLER <br /> Lo <br /> (::�) w I I I <br /> CQ� ¢ 22'-7" N <br /> EXISTING � � � ,� � �- <br /> FLORAL _ <br /> COOLER CA19)HIC-9�� o� <br /> �A5� � PZ-NPZ-2J (E) (�C) <br /> � <br /> LL E(N)O LJ- <br /> (� R N <br /> v _ (E) A20 (N) Ago (N) 20 <br /> A19H w <br /> 14'-1" 19'-5" R29 <br /> U (N) (N) (N) � <br /> (N) B33 833 '� • z M N 49'-2" - 33'-7" <br /> Ts BEV-1 EV-2 TS O T5 (M BEV- ? m co c? <br /> SC SC 0 r 45'-5" <br /> ---� <br /> N • V • <br /> Z Z Z <br /> >w N CV m N <br /> (E) (N) w o o c° <br /> co B33 m �-- - m <br /> M <br /> m R28 z Z z <br /> O'M0z N = 'z _, <br /> Q Z m Q N m Q -- CV <br /> co M <br /> z L z <br /> w <br /> Ln ,�� <br /> w Y D1-4 831 6286 <br /> m i TS ii <br /> B31 A <br /> i <br /> \�1 \ ice/ / \�� \ iii <br /> W <br /> W <br /> (E) (E) (E) <br /> SC OSC <br /> SC <br /> C I I I I <br /> Q <br /> 1.4 1.5 2.1 2.2 3.1 3.3 3.8 4.8 4.9 6.7 6.8 8.2 8.6 8.7 9.6 9.8 10.1 10.2 U U <br /> W ., <br /> SYMBOLS KEYED NOTES GENERAL NOTES >- <br /> SYMBOL KEYED DESCRIPTION SYMBOL KEYED R00 CASE TEMP SENSOR PROVIDED AND INSTALLED BY CASE R16 SYSTEM DIVIDER PROVIDED BY CASE MANUFACTURER, INSTALLED BY PLUMBING NOTES : <br /> CAL GREEN NOTES : U U <br /> NOTE NOTE 1. ALL STUB-UP DIMENSIONS ARE FROM INSIDE FACE OF EXTERIOR WALL OR r <br /> MANUFACTURER. COOLER/FREEZER TEMP SENSOR PROVIDED AND REFRIGERATION CONTRACTOR. <br /> CENTER OF COLUMN UNLESS OTHERWISE NOTED. REFRIGERATION <br /> -- SYSTEM REFERENCE NUMBER DT R21 DEFROST TERMINATION INSTALLED BY REFRIGERATION CONTRACTOR. RE: R8.4 FOR PROPER CONTRACTOR TO VERIFY COLUMN LOCATION WITH R1.1 SHEET. PLUMBING CONTRACTOR SHALL, WHERE APPLICABLE: CONTRACTORS SHALL: n/ n/ <br /> LOCATION. R19 SCHEDULE 40 PVC SLEEVE FURNISHED AND INSTALLED BY L.L L.L <br /> O U) <br /> REFRIGERATION CONTRACTOR. RE: R7.1-3 2. ALL OVERHEAD REFRIGERATION LINES SHALL BE INSTALLED WHERE SHOWN 1. USE MATERIAL AND METHODS OF INSTALLATION THAT <br /> ELECTRICAL REQUIREMENTS RE: R8.1 x R13 QUICK CONNECT COUPLER R01 EPR'S AND ISOLATION VALVES SUPPLIED AND INSTALLED BY 1. USE MATERIAL AND METHODS OF INSTALLATION THAT r <br /> REFRIGERATION CONTRACTOR AT OR IN CASES. LOCATION OF VALVE TO R28 CAP AND ABANDON EXISTING REFRIGERATION OR ELECTRICAL STUB-UPS ON PLANS. CONFORM TO ALL APPLICABLE 2019 CALIFORNIA GREEN <br /> CONFORM TO ALL APPLICABLE CODES AND ORDINANCES. BUILDING STANDARDS CODES AND ORDINANCES FOR <br /> BE IN SERVICEABLE AREA. CONTROL WIRES ARE TO BE RUN FROM VALVE NOT USED IN REMODEL. 3. REFRIGERATION LINES SHALL BE INSTALLED ABOVE BOTTOM OF ROOF <br /> REVISION SYMBOL Lv R23 LIQUID LINE SOLENOID AT COOLER/FREEZER BOX TO DISTRIBUTED SYSTEM BY REFRIGERATION CONTRACTOR. RE: R2.1, 2. FURNISH AND INSTALL ALL FLOOR DRAINS, GREASE TRAPS <br /> STRUCTURE.AVOID CONFLICTS WITH SKYLIGHTS AND OTHER TRADES. REFRIGERANT, REFRIGERATION PIPING, REFRIGERATION SWY2600R <br /> R8.1 R29 FOR ALL CASES IN SYSTEM ELECTRICAL CONNECTIONS TO BE AT TOP OF (AS REQUIRED), FAUCETS, HOT AND COLD WATER SUPPLY PROJECT NUMBER: <br /> �E COORDINATE INSTALLATION & LOCATION WITH GENERAL CONTRACTOR. LINES, SHUT OFF VALVES, HOSE BIBS, AND RECESSED CASES AND EQUIPMENT INSTALLATION. RE: 2019 CALIFORNIA <br /> CASE ELECTRICAL ENTRY ❑s R20 LEAK DETECTION TUBING &SAMPLING FILTER CASE. <br /> ®E R07 REFRIGERATION LINES FROM CASE CONNECTION TO WALL OR COLUMN, 4. ALL CASES SHALL HAVE MANUFACTURERS RECOMMENDED AIR GAP. METAL ENCLOSURES. GREEN BUILDING STANDARD CODES SECTIONS 5.508.1 AND DRAWN BY: TY <br /> ELECTRICAL STUB-UP THEN UP IN WALL OR COLUMN TO OVERHEAD, THEN OVERHEAD TO 5.508.2. <br /> 31 R22 HORN/STROBE ALARM DISTRIBUTED SYSTEM OR COMMON LOOP. 5. RE: R8.1 SCHEDULE FOR SYSTEM &CASE INFORMATION. 3. FURNISH AND INSTALL CONDENSATE DRAIN FOR AIR CHECKED BY: CG <br /> ER CASE REFRIGERATION CONNECTION HANDLER COIL SECTION. 65,750 SF <br /> R09 120V ELECTRICAL RECEPTACLE NEMA 5-20R IN CASE TOE KICK. 4. WHEN REQUIRED, PLUMBING CONTRACTOR SHALL FURNISH BUILDING SIZE: <br /> ER REFRIGERATION STUB-UP • R07 PIPING RISER FURNISHED BY CASE MANUFACTURER. CONNECTION BY GENERAL 6. RE: R2.1 FOR REFRIGERATION PIPING REQUIREMENTS. Q <br /> CONTRACTOR. AND INSTALL COLD WATER STUB-UP BENEATH PRODUCE STORE NUMBER <br /> ® CASE CONDENSATE FLOOR SINK RE: R7.1-2 A R26 DOOR ALARM 7. REFRIGERATION CONTRACTOR TO FILL ALL OPENINGS THROUGH WALK-IN CASES, CONNECT TO PRESSURE REGULATING VALVE AND 2600 <br /> R10 LIQUID LINE SOLENOIDS AND ISOLATION VALVES SUPPLIED BY RACK PANELS WITH FOAM INSULATION AFTER LINES ARE INSTALLED, INCLUDING SHUT-OFF VALVE IN PRODUCE PREP AREA AND MAKE FINAL SEISMIC NOTES : <br /> ® COIL CONDENSATE FLOOR SINK MANUFACTURER AND INSTALLED BY REFRIGERATION CONTRACTOR AT REFRIGERANT PIPING, CONDENSATE DRAINS, CONDUIT, SPRINKLER LINES. CONNECTIONS TO QUICK COUPLERS OR HOSE REELS ON <br /> S SUCTION LINE OR IN CASES. LOCATION OF VALVE TO BE IN SERVICEABLE AREA. CASES AS REQUIRED. CONTRACTORS SHALL: <br /> ------ WALK-IN BOX COIL DRAIN LINE RE: R7.1-1 CONTROL WIRES ARE TO BE RUN FROM VALVE TO DISTRIBUTED SYSTEM <br /> L LIQUID LINE BY GENERAL CONTRACTOR. RE: R2.1, R8.2, R8.4 SHEET TITLE <br /> •--► CONDENSATE DRAIN LINE DIRECTIONAL ARROW REFRIGERATION CONTRACTOR SHALL: 1. USE MATERIAL AND METHONDS OF INSTALLLATION THAT <br /> oTs DUAL TEMPERATURE SWITCH MOUNTED IN CASE TOE KICK H HUMIDIFIER SYSTEM SANITIZED WATER CONNECTION R11 T-STAT SOLENOID CONFORM TO ALL APPLICABLE CODES AND ORDINANCES FOR <br /> 1. FURNISH AND INSTALL ALL CONDENSATE DRAIN LINES CASE MOUNTING, REFRIGERATION PIPING AND EQUIPMENT UTILITY <br /> REFRIGERATION CONDUIT RE:R7.1-3 SR SUCTION RISER R13 QUICK CONNECT COUPLER FURNISHED WITH CASE. GENERAL WITH APPROVED TRAPS FROM EACH CASE OR BLOWER COIL INSTALLATION. <br /> ------ R19 CONTRACTOR TO PROVIDE WATER TO CASE WITH SHUTOFF VALVES AND <br /> 6" OR 8' SCHEDULE 40 PVC DS DISTRIBUTED SYSTEM MAKE CONNECTIONS. TO DRAIN, UNLESS OTHERWISE SPECIFIED. COORDINATION <br /> R04 J-BOX BY GENERAL CONTRACTOR R14 ALLOW 3" MIN. AIR GAP BEHIND CASES FOR PROPER AIR CIRCULATION. <br /> 0 R05 J-BOX FURNISHED BY OTHERS R15 PLUMBING CONTRACTOR TO PROVIDE 1/2" COLD WATER SUPPLY LINE (AS PLAN <br /> PER PLAN LOCATION)WITH SHUT OFF VALVE AND PRESSURE REGULATING ELECTRICAL NOTES : <br /> �TK VALVE TO ANY SERVICE AND/OR HOT CASES WHERE SHOWN. <br /> R09 TOE KICK RECEPTACLE <br /> ELECTRICAL CONTRACTOR SHALL, WHERE APPLICABLE: <br /> R06 SPECIAL ELECTRICAL CONNECTION RE: ELECTRICAL SHEETS SHEET NO. <br /> 1. USE MATERIAL AND METHODS OF INSTALLATION THAT <br /> Q R01 ELECTRONIC EPR CONFORM TO ALL APPLICABLE CODES AND ORDINANCES. <br /> 2. FURNISH AND INSTALL ALL CONDUIT AND WIRING FOR LINE <br /> Q R10 LIQUID LINE SOLENOID VOLTAGE REQUIRED FOR REFRIGERATION EQUIPMENT. <br /> 3. COORDINATE WITH REFRIGERATION CONTRACTOR AND THE R101 <br /> TS R00 CASE/COOLER TEMP SENSOR <br />