Laserfiche WebLink
1 1.8 2 (E)DISCONNECT 3 3.2 3.4 3.6 4 4.2 5 5.9 6 7 7.8 8 8.5 9 9.2 9.9 10 11 <br /> (E)EVAP COND. PANEL (E)MAIN LUG <br /> ----( )CONT--- T-71T <br /> ---- (E)VFD---- - - - (---- ONNECT --------- <br /> E CONTROL PANEL <br /> � r I <br /> I I x <br /> TM <br /> x i i i (E)RACK A i (E)RACK B I <br /> I SAFEWAY <br /> x I �__________ __________� �_ �__________________-- x <br /> L--------------J i / �� <br /> ❑ L-------------- ----- \ / x I ❑ STAMP <br /> -----------------------------------� I <br /> I <br /> I I I I I I I <br /> I I I I I I I <br /> I <br /> I I I I I I I I I <br /> I I I I I I I <br /> ❑ � I O <br /> rn0 <br /> I I I I I I U <br /> 1 .6 — — — — — — I — — — — I — — — — ❑ c� J <br /> 0? W <br /> 0 <br /> N LLu <br /> CD <br /> z <br /> 2 <br /> U) <br /> I I I I D <br /> U <br /> I <br /> I I I I I I I <br /> O <br /> ❑ 00 <br /> W <br /> W <br /> I I I 0� z N <br /> W Q co <br /> 00 <br /> I I I I I I I z W � <br /> LU <br /> 1E_ <br /> U) > U)O I D <br /> 0cooC) m <br /> I I I I I I I <br /> I <br /> I I I I I I I <br /> I s � <br /> � L <br /> Lm <br /> I I I,-- I I I I <br /> V �= <br /> ISSUE&REVISIONS <br /> NO. DATE: DESC: <br /> I I I I I I <br /> El <br /> Lu <br /> I <br /> I I I I I I <br /> I <br /> I I I I I I <br /> I <br /> I I I I I I <br /> I <br /> i <br /> i <br /> i <br /> i <br /> i <br /> 0 <br /> W <br /> r� <br /> �/ <br /> i <br /> C.1 — — — — — — — — — — — <br /> C <br /> REFRIGERATION EQUIPMENT PLAN r~ Q <br /> W ., <br /> SYMBOLS KEYED NOTES GENERAL NOTES >- <br /> SYMBOL KEYED DESCRIPTION SYMBOL KEYED R00 CASE TEMP SENSOR PROVIDED AND INSTALLED BY CASE R16 SYSTEM DIVIDER PROVIDED BY CASE MANUFACTURER, INSTALLED BY <br /> NOTE NOTE 1. ALL STUB-UP DIMENSIONS ARE FROM INSIDE FACE OF EXTERIOR WALL OR � r <br /> MANUFACTURER. COOLER/FREEZER TEMP SENSOR PROVIDED AND REFRIGERATION CONTRACTOR. CENTER OF COLUMN UNLESS OTHERWISE NOTED. REFRIGERATION 0 <br /> -- SYSTEM REFERENCE NUMBER DT R21 DEFROST TERMINATION INSTALLED BY REFRIGERATION CONTRACTOR. RE: R8.4 FOR PROPER CONTRACTOR TO VERIFY COLUMN LOCATION WITH R1.1 SHEET. <br /> LOCATION. R19 SCHEDULE 40 PVC SLEEVE FURNISHED AND INSTALLED BY <br /> ALL OVERHEAD REFRIGERATION LINES SHALL BE INSTALLED WHERE SHOWN co <br /> O ELECTRICAL REQUIREMENTS RE: R8.1 D4 R13 QUICK CONNECT COUPLER R01 EPR'S AND ISOLATION VALVES SUPPLIED AND INSTALLED BY REFRIGERATION CONTRACTOR. RE: R7.1-3 2. ON PLANS. <br /> REFRIGERATION CONTRACTOR AT OR IN CASES. LOCATION OF VALVE TO R28 CAP AND ABANDON EXISTING REFRIGERATION OR ELECTRICAL STUB-UPS <br /> REVISION SYMBOL �v R23 LIQUID LINE SOLENOID AT COOLER/FREEZER BOX BE IN SERVICEABLE AREA. CONTROL WIRES ARE TO BE RUN FROM VALVE NOT USED IN REMODEL. 3. REFRIGERATION LINES SHALL BE INSTALLED ABOVE BOTTOM OF ROOF <br /> ❑ TO DISTRIBUTED SYSTEM BY REFRIGERATION CONTRACTOR. RE: R2.1, STRUCTURE.AVOID CONFLICTS WITH SKYLIGHTS AND OTHER TRADES. SWY26OOR <br /> E R8.1 R29 FOR ALL CASES IN SYSTEM ELECTRICAL CONNECTIONS TO BE AT TOP OF COORDINATE INSTALLATION & LOCATION WITH GENERAL CONTRACTOR. PROJECT NUMBER: <br /> CASE ELECTRICAL ENTRY 0 R20 LEAK DETECTION TUBING &SAMPLING FILTER CASE. - <br /> ®E R07 REFRIGERATION LINES FROM CASE CONNECTION TO WALL OR COLUMN, 4. ALL CASES SHALL HAVE MANUFACTURERS RECOMMENDED AIR GAP. DRAWN BY: <br /> ELECTRICAL STUB-UP THEN UP IN WALL OR COLUMN TO OVERHEAD, THEN OVERHEAD TO <br /> I R22 HORN/STROBE ALARM DISTRIBUTED SYSTEM OR COMMON LOOP. 5. RE: R8.1 SCHEDULE FOR SYSTEM &CASE INFORMATION. CHECKED BY: - <br /> �R CASE REFRIGERATION CONNECTION 65,750 SF <br /> R <br /> R09 120V ELECTRICAL RECEPTACLE NEMA 5-20R IN CASE TOE KICK. BUILDING SIZE: <br /> REFRIGERATION STUB-UP • R07 PIPING RISER FURNISHED BY A E MANUFACTURER. CONNECTION BY GENERAL 6. RE: R2.1 FOR REFRIGERATION PIPING REQUIREMENTS.® CONTRACTOR. STORE NUMBER CASE CONDENSATE FLOOR SINK RE: R7.1-2 7. REFRIGERATION CONTRACTOR TO FILL ALL OPENINGS THROUGH WALK-IN 2600 <br /> R26 DOOR ALARM R10 LIQUID LINE SOLENOIDS AND ISOLATION VALVES SUPPLIED BY RACK PANELS WITH FOAM INSULATION AFTER LINES ARE INSTALLED, INCLUDING <br /> ® COIL CONDENSATE FLOOR SINK MANUFACTURER AND INSTALLED BY REFRIGERATION CONTRACTOR AT REFRIGERANT PIPING, CONDENSATE DRAINS, CONDUIT, SPRINKLER LINES. <br /> S SUCTION LINE OR IN CASES. LOCATION OF VALVE TO BE IN SERVICEABLE AREA. <br /> ------ WALK-IN BOX COIL DRAIN LINE RE: R7.1-1 CONTROL WIRES ARE TO BE RUN FROM VALVE TO DISTRIBUTED SYSTEM <br /> • ► CONDENSATE DRAIN LINE DIRECTIONAL ARROW L LIQUID LINE BY GENERAL CONTRACTOR. RE: R2.1, R8.2, R8.4 <br /> SHEET TITLE <br /> "Ts DUAL TEMPERATURE SWITCH MOUNTED IN CASE TOE KICK H HUMIDIFIER SYSTEM SANITIZED WATER CONNECTION R11 T-STAT SOLENOID ROOF <br /> R19 REFRIGERATION CONDUIT RE:R7.1-3 SR SUCTION RISER R13 QUICK CONTRACTOR TO PROVIDE WATENNECT COUPLER ISHED WITH R TO CAS WITH SHUTOFFAL <br /> VALVES AND <br /> 6" OR 8' SCHEDULE 40 PVC DS DISTRIBUTED SYSTEM MAKE CONNECTIONS. REFRIGERATION <br /> o R04 J-BOX BY GENERAL CONTRACTOR R14 ALLOW 3" MIN. AIR GAP BEHIND CASES FOR PROPER AIR CIRCULATION. EQUIPMENT <br /> J❑ R05 J-BOX FURNISHED BY OTHERS R15 PLUMAS <br /> PER PBLAN OCAT ON)WITH ING CONTRACTOR OSHUT OFF VALVE PROVIDE 1/2" OAND PRESSURE REGULALD WATER SUPPLY LINE TING NG PLAN <br /> =�3K R09 TOE KICK RECEPTACLE VALVE TO ANY SERVICE AND/OR HOT CASES WHERE SHOWN. <br /> R06 SPECIAL ELECTRICAL CONNECTION RE: ELECTRICAL SHEETS SHEET NO. <br /> Q R01 ELECTRONIC EPR <br /> Q R10 LIQUID LINE SOLENOID <br /> R203 <br /> TS R00 CASE/COOLER TEMP SENSOR <br />