Laserfiche WebLink
LOW STAINER POSITION LOW STAINER POSITION <br /> FLR DRAIN SET <br /> BELOW TOP OF F.F. <br /> ADJACENT TO TILE <br /> CANTS TO CREATE <br /> 1'-6" ALL CONDUIT <br /> DIMPLE <br /> DIMENSION STUB UPS TO BE <br /> DATUM POINT EQ WITHIN THIS OO <br /> BOUNDARY CAULK JOINT <br /> ©P01]STAPBIICKS COFFEE COMPANY <br /> F l <br /> LZ <br /> _ __ _ _ STARBUCKS COFFEE <br /> ' THIN SET CERAMIC COMPANY <br /> 2 3/4" POWER CONDUIT 3/4" POWER TO TILE,TYP. <br /> -0 TOELECT RICALPANEL PASTRY CASE ? 2401 UTAH AVENUE SOUTH <br /> °' SEATTLE, WASHINGTON 98134 <br /> 1/2" PHONE TO 3/4" POWER a °.,, 'v (206) 318-1575 <br /> MANAGER'S DESK FUTURE ° <br /> THESE DRAWINGS AND SPECIFICATIONS ARE <br /> L <br /> °. °' MOISTURE BARRIER CONFIDENTIAL AND SHALL REMAIN THE SOLE <br /> 1/2" DATA TO 1/2"SECURITY PROPERTY OF STARBUCKS CORPORATION, <br /> Q MANAGER'S DESK TO MANAGERS WHICH IS THE OWNER OF THE COPYRIGHT IN <br /> n DESK THIS WORK. THEY SHALL NOT BE <br /> TRAP PRIMER REPRODUCED (IN WHOLE OR IN PART),SHARED <br /> 0 2" CONNECTION WITH THIRD PARTIES OR USED IN ANY MANNER <br /> 00 ON OTHER PROJECTS OR EXTENSIONS TO THIS <br /> 5.,SO.. PROJECT WITHOUT THE PRIOR WRITTEN <br /> a CONSENT OF STARBUCKS CORPORATION. <br /> M 9". <br /> THESE DRAWINGS AND SPECIFICATIONS ARE <br /> INTENDED TO EXPRESS DESIGN INTENT FOR A <br /> PROTOTYPICAL STARBUCKS STORE(WHICH IS <br /> SUBJECT TO CHANGE AT ANYTIME)AND DO <br /> NOT REFLECT ACTUAL SITE CONDITIONS. <br /> CD STUB-UP DOUBLE POS 04 FLOOR DRAIN 01 NEITHER NOR <br /> SHEOTHERAXCEPT STATE <br /> o NOR LIABILITY TO THE OTHER(EXCEPT STATED <br /> M SCALE: 1 1/2"=V-0" SCALE: 3"= V-0" ABOVE) UNTIL A WRITTEN AGREEMENT IS <br /> cy FULLY EXECUTED BY BOTH PARTIES. <br /> t <br /> U <br /> Q STARBUCKS TEMPLATE VERSION 12017.05.18 <br /> u7 <br /> M <br /> y W OHR SINK SET FLUSH <br /> TOP OF F.F. <br /> 5858 Wilshire Blvd #200 T: 323.954.8996 <br /> a1 DIMENSION ALL CONDUIT <br /> E DATUM POINT <br /> EQ STUB UPS CAULK JOINT LOS Angeles, CA 90036 F: 323.954.8965 <br /> 0 TO BE WITHIN www.valerloinc.com • info@valerioinc.com <br /> p THIS BOUNDARY THIN SET CERAMIC <br /> ARCHITECT <br /> TILE,TYP. <br /> — OFRECORD �RC',t, <br /> 1n M a ° o A GO 9LtR l� <br /> 0 . . CONC. INFILL AND TRENCH U 2 LIC. 22 �� n <br /> O - --- -- - - -- J w FOR BELOW GRADE UTILITIES �-' C 24226 H <br /> Q 3/4"LAN CONDUIT ° ° ° • ° EXPIRES <br /> p TO POS/SAFE , • o Nn ° `q 7a1-1sQ. <br /> I^l)1 Oact+ti�� <br /> L0 GROUND POWER ° ° ° � ° <br /> CONDUIT QQ <br /> oI LAN CONDUIT p0 p0 O00 O 00 000 O <br /> p(3OooO 0 poop 0 GRAVEL BACKFILL <br /> TO <br /> M TO MANAGER'S STATION Oo o � 00 00O �o 0Os <br /> I TED �(�O o o <br /> N0� NO-HUB CONNECTION <br /> GROUND <br /> Z POWER CONDUIT —0"x o Ln <br /> r) 3"TAIL PIECE N <br /> M Q rn <br /> 2 rn LUCF) v <br /> N ELECTRICAL STUB-UP �a FRONT BAR 05 FLOOR SINK 02 0`6z <br /> �I <br /> 23 SCALE: 11/2"=1'-0" SCALE: 3"= 1'-0" n = 0 <br /> 2I O w LUY <br /> /M� QLU <br /> m EO. 7" Z LL Q U) < 0 <br /> 2 <br /> sl w U w z o <br /> QI TO BE WITHIN THIS O Q <br /> 2 F---- 1 ALL PIPING STUB UPS 0 DO <br /> 0 fr O <br /> YCNi L. — BOUNDARY a a Rt LL Ir <br /> CW STUB UP STORE #: 10183 <br /> PROJECT`m <br /> (n # <br /> DIMENSION DATUM POINT <br /> A-(2) STUBS <br /> CASEWORK CONCEPT: <br /> CWF STUB UP <br /> ISSUE DATE: <br /> DESIGN MANAGER: M. MONTENEGRO <br /> LO LEEDC) AP: <br /> PROGRAM MANAGER: <br /> rn 9 CHECKED BY: VALERIO <br /> N DIMENSION EQ. <br /> O <br /> a DATUM POINT ALL PIPING STUB UPS Revision Schedule <br /> TO BE WITHIN THIS <br /> .J-- BOUNDRV Rev Date By Description <br /> ra 05.23-18 SS 90 PERCENT CD SET <br /> 06-06-18 SS 1ST SUBMITTAL SET <br /> 1 <br /> CWF STUB UP HW STUB UP 2 <br /> 3 <br /> CW STUB UP SHEET TITLE: <br /> FLOOR PENETRATION <br /> MB-(3) STUBS DETAILS <br /> v SCALE:AS SHOWN <br /> PLUMBING STUB-UP @ FRONTBAR 03 SHEET NUMBER: <br /> SCALE: 1 1/2"=V-0" <br /> 1-5010 <br />